References
- AnbariFTEarned value project management method and extensionsProject Mngt J20033441223
- BoxGEPMullerMEA note on the generation of random normal deviatesAnn Math Stud19582961061110.1214/aoms/1177706645
- CioffiDFA tool for managing projects: An analytic parameterization of the S-curveInt J Project Mngt20052321522210.1016/j.ijproman.2004.08.001
- CioffiDFDesigning project management: A scientific notation and an improved formalism for earned value calculationsInt J Project Mngt20062413614410.1016/j.ijproman.2005.07.003
- DavidovitchLParushAShtubAThe impact of functional fidelity in simulator based learning of project managementInt J Eng Educ2009252333340
- De FalcoMMacchiaroliRTiming of control activities in project planningInt J Project Mngt1998161515810.1016/S0263-7863(97)00012-4
- FlemingQKoppelmanJEarned Value Project Management2005
- KimEWilliamGWellsJRDuffeyMRA model for effective implementation of earned value management methodologyInt J Project Mngt200321537538210.1016/S0263-7863(02)00049-2
- MeyerJPerformance with tables and graphs: Effects of training and a visual search modelErgonomics200043111840186510.1080/00140130050174509
- Pajares J and López-Paredes A (2010). An extension of the EVM analysis for project monitoring: The cost control index and the schedule control index. Int J Project Mngt. doi:10.1016/j.ijproman.2010.04.005.
- PartoviFYBurtonJTiming of monitoring and control of CPM projectsIEEE T Eng Manage1993401687510.1109/17.206653
- PlazaMTuretkenOA model-based DSS for integrating the impact of learning in project controlDecis Support Syst200947448849910.1016/j.dss.2009.04.010
- Project Management Institute (2004). ANSI Standard. 3rd edn. Project Management Institute: Newtowns Square, Pennsylvania.
- RazTErelEOptimal timing of project control pointsEur J Oper Res2000127225226110.1016/S0377-2217(99)00492-0
- ShtubABardJGlobersonSProject Management—Engineering Technology and Implementation1996
- TufteERThe Visual Display of Quantitative Information2001
- VandevoordeSVanhouckeMA comparison of different project duration forecasting methods using earned value metricsInt J Project Mgmt20062428930210.1016/j.ijproman.2005.10.004
- VanhouckeMOn the dynamic use of project performance and schedule risk information during project trackingOmega201139441642610.1016/j.omega.2010.09.006
- VanhouckeMVandevoordeSA simulation and evaluation of earned value metrics to forecast the project durationJ Opl Research Soc2007581361137410.1057/palgrave.jors.2602296
- VesseyICognitive fit: A theory-based analysis of the graphs versus tables literatureDecision Sci19912221924010.1111/j.1540-5915.1991.tb00344.x
- VesseyIThe effect of information presentation on decision making: A cost-benefit analysisInform Manage19942710311910.1016/0378-7206(94)90010-8