References
- AgeevAABaburinAEApproximation algorithms for UET scheduling problems with exact delaysOpns Res Lett200735453354010.1016/j.orl.2006.09.006
- AhrDBekesiJGalambosGOswaldMReineltGAn exact algorithm for scheduling identical coupled tasksMath Method Opns Res200459219320310.1007/s001860300328
- BakerKIntroduction to Sequencing and Scheduling1974
- BékésiJGalambosGOswaldMReineltGImproved analysis of an algorithm for the coupled task problem with uet jobsOpns Res Lett2009372939610.1016/j.orl.2008.11.002
- BlazewiczJEckerKPeschESchmidtGWeglarzJHandbook of Scheduling. From Theory to Applications2007
- BlazewiczJEckerKKisTPottsCNTanasMWhiteheadJScheduling of coupled tasks with unit processing timesJ Sched201013545346110.1007/s10951-010-0167-z
- BraunerNFinkeGLehoux-LebacqueVPottsCWhiteheadJScheduling of coupled tasks and one-machine no-wait robotic cellsComput Opns Res200936230130710.1016/j.cor.2007.10.003
- BruckerPScheduling Algorithms2001
- BruckerPKnustSComplexity results for single-machine problems with positive finish-start time-lagsOsnabrucker Schriften zur Mathematik, Reihe P Nr1998202299316
- EckerKTanasMComplexity of scheduling of coupled tasks with chains precedence constraints and constant even length of the gapFound Comput Decision Sci2007323199212
- Gupta JND (1994). Single Facility Scheduling with Two Operations per Job and Time-lags. preprint.
- Lehoux-Lebacque V, Brauner N and Finke G (2009). Identical coupled tasks scheduling: Polynomial complexity of the cyclic case. Les cahiers Leibnitz 179.
- LeungJHandbook of Scheduling2004
- Li H and Zhao H (2007). Scheduling coupled tasks on a single machine. In: Kendall G, Tan KC, Burke EK and Smith S (eds). IEEE Symposium on Computational Intelligence in Scheduling, Honolulu, Hawaii, pp 137–142.
- OrmanAJPottsCNOn the complexity of coupled-task schedulingDiscrete Appl Math19977214115410.1016/S0166-218X(96)00041-8
- OrmanAJPottsCNShahaniAKMooreARScheduling for the control of a multifunctional phased array radar systemEur J Opl Res199690132510.1016/0377-2217(95)00307-X
- OrmanAJShahaniAKMooreARModelling for the control of a complex radar systemComput Opns Res19982523924910.1016/S0305-0548(97)00047-6
- PottsCNWhiteheadJDHeuristics for a coupled-operation scheduling problemJ Opl Res Soc200758101375138810.1057/palgrave.jors.2602272
- ShapiroRDScheduling coupled tasksNav Res Logist Q19802747748110.1002/nav.3800270312
- Simonin G, Darties B, Giroundeau R and Konig JC (2009). Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor. In: Blazewicz J, Drozdowski M, Kendall G and McCollum B (eds). Proceedings of the 4th Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA 2009), 10–12 August, Dublin, Ireland, pp 378–388.
- Whitehead JD (2002). Scheduling and layout in flexible manufacturing systems. PhD Thesis, University of Southampton, UK.
- YuWThe Two-machine Flow Shop Problem with Delays and the One-machine Total Tardiness Problem1996