References
- BakalISAkcaliEEffects of random yield in remanufacturing with price-sensitive supply and demandProduction and Operation Management200615340742010.1111/j.1937-5956.2006.tb00254.x
- DeCroixGAZipkinPHInventory management for an assembly system with product or component returnsManagement Science20055181250126510.1287/mnsc.1050.0394
- DenizelMFergusonMSouzaGMultiperiod remanufacturing planning with uncertain quality of inputsIEEE Transactions on Engineering Management201057339440410.1109/TEM.2009.2024506
- DePuyGWUsherJSWalkerRLTaylorGDProduction planning for remanufactured productsProduction Planning & Control200718757358310.1080/09537280701542210
- El SaadanyAMAJaberMYA production/remanufacturing inventory model with price and quality dependant return rateComputers & Industrial Engineering201058335236210.1016/j.cie.2009.01.017
- FergusonMGuideVDJr.KocaESouzaGCThe value of quality grading in remanufacturingProduction and Operations Management200918330031410.1111/j.1937-5956.2009.01033.x
- FerrerGSwaminathanJMManaging new and remanufactured productsManagement Science2006521152610.1287/mnsc.1050.0465
- FerrerGSwaminathanJMManaging new and differentiated remanufactured productsEuropean Journal of Operational Research2010203137037910.1016/j.ejor.2009.08.007
- FerrerGWhybarkDCMaterial planning for a remanufacturing facilityProduction and Operation Management200110211212410.1111/j.1937-5956.2001.tb00073.x
- FleischmannMBloemhof-RuwaardJMDekkerRVan der LaanEVan Nunen JoAEEVan WassenhoveLNQuantitative models for reverse logistics: A reviewEuropean Journal of Operation Research1997103111710.1016/S0377-2217(97)00230-0
- FrankeCBasdereBCiupekMSeligerSRemanufacturing of mobile phones—Capacity, program and facility adaption planningOmega200634656257010.1016/j.omega.2005.01.016
- GeyerRVan WassenhoveLNAtasuAThe economics of remanufacturing under limited component durability and finite product life cyclesManagement Science20075318810010.1287/mnsc.1060.0600
- GuideVDRJr.Production planning and control for remanufacturing: Industry practice and research needsJournal of Operations Management200018446748310.1016/S0272-6963(00)00034-6
- InderfurthKTeunterRProduction planning control for closed-loop supply chainsBusiness Aspects of Closed-loop Supply Chains2003
- InderfurthKFlapperSDPLambertADJPappisCVoutsinasTProduction planning for recovery managementReverse Logistics: Quantitative Models for Closed-loop Supply Chains2004
- LiJGonzalezMZhuYA hybrid simulation optimization method for production planning of dedicated remanufacturingInternational Journal of Production Economics2009117228630110.1016/j.ijpe.2008.11.005
- MulaJPolerRGarcía-SabaterJPLarioFCModels for production planning under uncertainty: A reviewInternational Journal of Production Economics2006103127128510.1016/j.ijpe.2005.09.001
- NenesGPanagiotidouSDekkerRInventory control policies for inspection and remanufacturing of returns: A case studyInternational Journal of Production Economics2010125230031210.1016/j.ijpe.2010.02.008
- ReveliotisSAUncertainty management in optimal disassembly planning through learning-based strategiesIIE Transactions200739664565810.1080/07408170600897536
- WeiCLiYCaiXRobust optimal policies of production and inventory with uncertain returns and demandInternational Journal of Production Economics2009134235736710.1016/j.ijpe.2009.11.008