References
- Audy J-F, Amours SD and Ronnqvist M (2012). Planning methods and decision support systems in vehicle routing problem for timber transportation: A review. Technical Report CIRRELT-2012-38, CIRRELT, 2012.
- BarnhartCJohnsonELNemhauserGLSavelsberghMWPVancePHBranch-and-price: Column generation for solving huge integer programsOperations Research199846331632910.1287/opre.46.3.316
- BerbegliaGCordeauJ-FGribkovskaiaILaporteGStatic pickup and delivery problems: A classification scheme and surveyTOP200715113110.1007/s11750-007-0009-0
- Coelho LC, Cordeau J-F and Laporte G (2012). Thirty years of inventory-routing. Technical Report CIRRELT-2012-52, CIRRELT.
- CordeauJ-FLaporteGMercierAA unified tabu search heuristic for vehicle routing problems with time windowsJournal of the Operational Research Society200152892893610.1057/palgrave.jors.2601163
- CormenTLeisersonCRivestRSteinCIntroduction to Algorithms1990
- DrorMLaporteGTrudeauPVehicle routing with split deliveriesDiscrete Applied Mathematics199450323925410.1016/0166-218X(92)00172-I
- El Hachemi N (2011). Problème de transport avec contraintes dhoraires. PhD thesis, École Polytechnique de Montréal, December.
- El HachemiNGendreauMRousseauL-MA heuristic to solve the synchronized log-truck scheduling problemComputers and Operations Research201340366667310.1016/j.cor.2011.02.002
- EpsteinRRönnqvistMWeintraubAForest transportation, chapter 20Handbook of Operations Research in Natural Resources2007391403
- FPSuite (n.d.). An integrated process control platform for forestry operations. http://www.fpsuite.ca, accessed November 2013.
- Gémieux G (2009). Planification de la récolte et allocation des produits aux usines. Masters thesis, Université de Montréal, August.
- GingrasCCordeauJ-FLaporteGUn algorithme de minimisation du transport à vide appliqué à lindustrie forestièreInformation Systems and Operational Research2007451414710.3138/infor.45.1.41
- GronaltMHirschPLog-truck scheduling with a tabu search strategyMetaheuristics, Volume 39 of Operations Research/Computer Science Interfaces Series20076588
- GunnarssonHRönnqvistMCarlssonDIntegrated production and distribution planning for Södra Cell ABJournal of Mathematical Modelling and Algorithms200761254510.1007/s10852-006-9048-z
- KarlssonJRönnqvistMBergströmJAn optimization model for annual harvest planningCanadian Journal of Forest Research20043481747175410.1139/x04-043
- Linnainmaa S, Savola J and Jokinen O (1995). EPO: A knowledge based system for wood procurement management. In Proceedings of the seventh Annualconference on Artificial Intelligence, Vol. 5015, Montréal, pp 107–113.
- Natural Resources Canada (2011). Ressources Naturelles Canada, http://www.nrcan-rncan.gc.ca, accessed November 2013.
- PalmgrenMRönnqvistMVärbrandPA near-exact method for solving the log-truck scheduling problemInternational Transactions in Operational Research200411444746410.1111/j.1475-3995.2004.00469.x
- ReyPAMuñozJAWeintraubAA column generation model for truck routing in the Chilean forest industryInformation Systems and Operational Research200947321522110.3138/infor.47.3.215
- Rix G, Rousseau L-M and Pesant G (2011). Solving a multi-period log-truck scheduling problem with column generation. Presented at the 34th Council on Forest Engineering Annual Meeting. Quebec, QC, Canada.
- RönnqvistMOptimization in forestryMathematical Programming2003971–2267284