References
- AllahverdiANgCTChengTCEKovalyovMYA survey of scheduling problems with setup times or costsEuropean Journal of Operational Research20081873985103210.1016/j.ejor.2006.06.060
- BangJYKimYDScheduling algorithms for a semiconductor probing facilityComputers and Operations Research201138366667310.1016/j.cor.2010.08.010
- ChenTRChangTSChenCWKaoJScheduling for IC sort and test with preemptiveness via Lagrangian relaxationIEEE Transactions on Systems, Man, and Cybernetics19952581249125610.1109/21.398686
- ChengTCESinCCSA state-of-the-art review of parallel-machine scheduling researchEuropean Journal of Operational Research199047327129210.1016/0377-2217(90)90215-W
- ChiangTCShenYSFuLCA new paradigm for rule-based scheduling in the wafer probe centreInternational Journal of Production Research200846154111413310.1080/00207540601137199
- EllisKPLuYBishEKScheduling of wafer test processes in semiconductor manufacturingInternational Journal of Production Research200442221524210.1080/0020754031000118116
- EnginODöyenAA new approach to solve hybrid flow shop scheduling problems by artificial immune systemFuture Generation Computer Systems20042061083109510.1016/j.future.2004.03.014
- GongMJiaoLZhangXA population-based artificial immune system for numerical optimizationNeurocomputing2008721-314916110.1016/j.neucom.2007.12.041
- HsiehYCYouPSLiouCDA note of using effective immune based approach for the flow shop scheduling with buffersApplied Mathematics and Computation200921551984198910.1016/j.amc.2009.07.033
- HuangKLLiaoCJAnt colony optimization combined with taboo search for the job shop scheduling problemComputers and Operations Research20063541030104610.1016/j.cor.2006.07.003
- LinJTWangFKLeeWTCapacity-constrained scheduling for a logic IC final test facilityInternational Journal of Production Research2004421799910.1080/0020754032000123588
- LinSWYingKCA hybrid approach for single-machine tardiness problems with sequence-dependent setup timesJournal of the Operational Research Society20085981109111910.1057/palgrave.jors.2602434
- LinSWYingKCApplying a hybrid simulated annealing and tabu search approach to non-permutation flowshop scheduling problemsInternational Journal of Production Research20094751411142410.1080/00207540701484939
- LinSWLeeZJYingKCLinRHMeta-heuristic algorithms for wafer sorting scheduling problemsJournal of the Operational Research Society201162116517410.1057/jors.2009.182
- MusilekPLauAReformatMWyard-ScottLImmune programmingInformation Sciences20061768972100210.1016/j.ins.2005.03.009
- NaderiBKhaliliMTavakkoli-MoghaddamRA hybrid artificial immune algorithm for a realistic variant of job shops to minimize the total completion timeComputer & Industrial Engineering20095641494150110.1016/j.cie.2008.09.031
- O'Connor JJ and Robertson EF (2012). Student’s t-Test, MacTutor History of Mathematics Archive. University of St Andrews, http://www-history.mcs.st-andrews.ac.uk/Biographies/Gosset.html.
- OvacikIMUzsoyRDecomposition methods for scheduling semiconductor testing facilitiesInternational Journal of Flexible Manufacturing Systems19968435738710.1007/BF00170018
- PearnWLChungSHYangMHA case study on the wafer probing scheduling problemProduction Planning & Control2002131667510.1080/09537280110061593
- PearnWLChungSHYangMHThe wafer probing scheduling problem (WPSP)Journal of the Operational Research Society200253886487410.1057/palgrave.jors.2601362
- PearnWLChungSHYangMHChenYHAlgorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictionsJournal of the Operational Research Society200455111194120710.1057/palgrave.jors.2601795
- PearnWLChungSHYangMHShiaoKPSolution strategies for multi-stage wafer probing scheduling problem with reentryJournal of the Operational Research Society200859563765110.1057/palgrave.jors.2602354
- TanKCGohCKMamunAAEiEZAn evolutionary artificial immune system for multi-objective optimizationEuropean Journal of Operational Research2008187237139210.1016/j.ejor.2007.02.047
- Tavakkoli-MoghaddamRRahimi-VahedAMirzaeiAHA hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardinessInformation Sciences2007177225072509010.1016/j.ins.2007.06.001
- YangJChangTSMultiobjective scheduling for IC sort and test with a simulation test bedIEEE Transactions on Semiconductor Manufacturing199811230431510.1109/66.670181
- YingKCScheduling identical wafer sorting parallel machines with sequence-dependent setup times using an iterated greedy heuristicInternational Journal of Production Research2012150102710271910.1080/00207543.2011.588617
- YingKCChengHMDynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristicExpert Systems with Applications20103742848285210.1016/j.eswa.2009.09.006
- ZandiehMFatemi GhomiSMTMoattar HusseiniSMAn immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup timesApplied Mathematics and Computation2006180111112710.1016/j.amc.2005.11.136
- ZhangZImmune optimization algorithm for constrained nonlinear multiobjective optimization problemsApplied Soft Computing20077384085710.1016/j.asoc.2006.02.008
- ZhouYBeizhiLiYangJStudy on job-shop scheduling with sequence dependent setup times using biological immune algorithmInternational Journal of Advanced Manufacturing Technology2006301-210511110.1007/s00170-005-0022-0