164
Views
17
CrossRef citations to date
0
Altmetric
General Paper

A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint

&
Pages 1542-1554 | Received 22 Nov 2013, Accepted 28 Oct 2014, Published online: 21 Dec 2017

References

  • AdiriIBrunoJFrostigERinnooy-KanAHGSingle machine flow-time scheduling with a single breakdownActa Informatica198926767969610.1007/BF00288977
  • AdiriIFrostigERinnooy-KanAHGScheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobsNaval Research Logistics199138226127110.1002/1520-6750(199104)38:2<261::AID-NAV3220380210>3.0.CO;2-I
  • AkturkMSGhoshJBGunesEDScheduling with tool changes to minimize total completion time: A study of heuristics and their performanceNaval Research Logistics2003501153010.1002/nav.10045
  • AkturkMSGhoshJBGunesEDScheduling with tool changes to minimize total completion time: Basic results and SPT performanceEuropean Journal of Operational Research2004157378479010.1016/S0377-2217(03)00232-7
  • AzizogluMKircaOTardiness minimization on parallel machinesInternational Journal of Production Economics199855216316810.1016/S0925-5273(98)00034-6
  • BakerKRIntroduction to Sequencing and Scheduling1974
  • BirgeJFrenkJBGMittenthalJRinnooy-KanAHGSingle-machine scheduling subject to stochastic breakdownsNaval Research Logistics199037566167710.1002/1520-6750(199010)37:5<661::AID-NAV3220370506>3.0.CO;2-3
  • ChenJSSingle-machine scheduling with flexible and periodic maintenanceJournal of the Operational Research Society200657670371010.1057/palgrave.jors.2602043
  • ChenWJMinimizing total flow time in the single-machine scheduling problem with periodic maintenanceJournal of the Operational Research Society200657441041510.1057/palgrave.jors.2601998
  • ChenJSOptimization models for the tool change scheduling problemOmega200836588889410.1016/j.omega.2006.04.006
  • ChenWJMinimizing number of tardy jobs on a single machine subject to periodic maintenanceOmega200937359159910.1016/j.omega.2008.01.001
  • ChoiYCKimYDTool replacement policies for a machining center producing multiple types of products with distinct due datesInternational Journal of Production Research200139590792110.1080/00207540010011054
  • ChuCA branch and bound algorithm to minimize total tardiness with different release datesNaval Research Logistics199239226528310.1002/1520-6750(199203)39:2<265::AID-NAV3220390209>3.0.CO;2-L
  • DasKLashkariRSSenguptaSIntegrating machine reliability and preventive maintenance planning in manufacturing cell designIndustrial Engineering and Management Systems200872114125
  • Dell’AmicoMMartelloSBounds for the cardinality constrained P∣∣Cmax problemJournal of Scheduling20014312313810.1002/jos.68
  • DuJLeungJYTMinimizing total tardiness on one machine is NP-hardMathematics of Operations Research199015348349510.1287/moor.15.3.483
  • EckerKHGuptaJNDScheduling tasks on a flexible manufacturing machine to minimize tool change delaysEuropean Journal of Operational Research2005164362763810.1016/j.ejor.2003.12.025
  • FrostigEA note on stochastic scheduling on a single machine subject to breakdown—the preemptive repeat modelProbability in the Engineering and Information Sciences19915334935410.1017/S0269964800002138
  • GharbiAHaouariMOptimal parallel machines scheduling with availability constraintsDiscrete Applied Mathematics20051481638710.1016/j.dam.2004.12.003
  • GrahamRLLawlerELLenstraJKRinnooy-KanAHGOptimization and approximation in deterministic sequencing and scheduling: A surveyAnnals of Discrete Mathematics1979528732610.1016/S0167-5060(08)70356-X
  • HoJCWongJSMakespan minimization for m parallel identical processorsNaval Research Logistics199542693594810.1002/1520-6750(199509)42:6<935::AID-NAV3220420606>3.0.CO;2-D
  • HongSSParkJHLieCHOptimal preventive maintenance policy with cost-dependent improvement factorJournal of the Korean Institute of Industrial Engineers2010362108116
  • HsuCJLowCSuCTA single-machine scheduling problem with maintenance activities to minimize makespanApplied Mathematics and Computation2010215113929393510.1016/j.amc.2009.11.040
  • KimYDMinimizing total tardiness in permutation flowshopsEuropean Journal of Operational Research199585354155510.1016/0377-2217(94)00029-C
  • KondakciSAzizogluMKircaOAn efficient algorithm for the single machine tardiness problemInternational Journal of Production Economics199436221321910.1016/0925-5273(94)90026-4
  • KoulamasCDecomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problemNaval Research Logistics199744110912510.1002/(SICI)1520-6750(199702)44:1<109::AID-NAV7>3.0.CO;2-E
  • LeeCYMachine scheduling with an availability constraintJournal of Global Optimization199693–439541610.1007/BF00121681
  • LeeCYChenZLScheduling jobs and maintenance activities on parallel machinesNaval Research Logistics200047214516510.1002/(SICI)1520-6750(200003)47:2<145::AID-NAV5>3.0.CO;2-3
  • LeeCYLimanSDCapacitated two-parallel machines scheduling to minimize sum of job completion timesDiscrete Applied Mathematics199341321122210.1016/0166-218X(90)90055-H
  • LeeHParkYJHurSA preventive maintenance scheduling model of the cluster toolIE Interfaces201225112713310.7232/IEIF.2012.25.1.127
  • LeeJYKimYDMinimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenanceComputers and Operations Research20123992196220510.1016/j.cor.2011.11.002
  • LeeSHLeeIGHeuristic algorithm for the single machine scheduling with periodic maintenanceJournal of the Korean Institute of Industrial Engineers2008343318327
  • LenstraJKRinnooy-KanAHGBruckerPComplexity of machine scheduling problemsAnnals of Discrete Mathematics1977134336210.1016/S0167-5060(08)70743-X
  • LevinAMosheiovGSarigAScheduling a maintenance activity on parallel identical machinesNaval Research Logistics2009561334110.1002/nav.20324
  • LiaoCJChenWJSingle-machine scheduling with periodic maintenance and nonresumable jobsComputers and Operations Research20033091335134710.1016/S0305-0548(02)00074-6
  • LiaoCJChenCMLinCHMinimizing makespan for two parallel machines with job limit on each availability intervalJournal of the Operational Research Society200758793894710.1057/palgrave.jors.2602209
  • LiaoCJShyurDLLinCHMakespan minimization for two parallel machines with an availability constraintEuropean Journal of Operational Research2005160244545610.1016/j.ejor.2003.08.034
  • LinCHLiaoCJMakespan minimization for two parallel machines with an unavailable period on each machineInternational Journal of Advanced Manufacturing Technology2007339–101024103010.1007/s00170-006-0524-4
  • MellouliRSadfiCChuCKacemIIdentical parallel-machine scheduling under availability constraints to minimize the sum of completion timesEuropean Journal of Operational Research200919731150116510.1016/j.ejor.2008.03.043
  • PinedoMRammouzEA note on stochastic scheduling on a single machine subject to breakdown and repairProbability in the Engineering and Information Sciences198821414910.1017/S0269964800000619
  • PottsCNVan WassenhoveLNA branch and bound algorithm for the total weighted tardiness problemOperations Research198533236337710.1287/opre.33.2.363
  • QiXChenTTuFScheduling the maintenance on a single machineJournal of the Operational Research Society199950101071107810.1057/palgrave.jors.2600791
  • RachamaduguRMVA note on the weighted tardiness problemOperations Research198735345045210.1287/opre.35.3.450
  • SchallerJNote on Shim and Kim’s lower bounds for scheduling on identical parallel machines to minimize total tardinessEuropean Journal of Operational Research2009197142242610.1016/j.ejor.2008.07.005
  • ShimSOKimYDScheduling on parallel identical machines to minimize total tardinessEuropean Journal of Operational Research2007177113514610.1016/j.ejor.2005.09.038
  • TanakaSArakiMA branch-and-bound algorithm with Lagrangian relaxation to minimize total tardiness on identical parallel machinesInternational Journal of Production Economics2008113144645810.1016/j.ijpe.2007.10.006
  • WangJJWangJBLiuFParallel machines scheduling with a deteriorating maintenance activityJournal of the Operational Research Society201162101898190210.1057/jors.2010.143
  • XuDSunKLiHParallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespanComputers and Operations Research20083541344134910.1016/j.cor.2006.08.015
  • YalaouiFChuCParallel machine scheduling to minimize total tardinessInternational Journal of Production Economics200276326527910.1016/S0925-5273(01)00175-X

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.