91
Views
5
CrossRef citations to date
0
Altmetric
General Paper

Component redundancy allocation in optimal cost preventive maintenance scheduling

, &
Pages 925-935 | Received 20 May 2010, Accepted 17 Apr 2014, Published online: 21 Dec 2017

References

  • ChienY-HOptimal age-replacement policy under an imperfect renewing free-replacement warrantyIEEE Transactions on Reliability200857112513310.1109/TR.2007.909769
  • ChienY-HSheuS-HExtended optimal age-replacement policy with minimal repair of a system subject to shocksEuropean Journal of Operational Research2006174116918110.1016/j.ejor.2005.01.032
  • Coolen-SchrijnerPCoolenFPANonparametric predictive inference for age replacement with a renewal argumentQuality and Reliability Engineering International200420320321510.1002/qre.561
  • Coolen-SchrijnerPCoolenFPANonparametric adaptive age replacement with a one-cycle criterionReliability Engineering and System Safety2007921748410.1016/j.ress.2005.11.002
  • Coolen-SchrijnerPCoolenFPAShawSCNonparametric adaptive opportunity-based age replacement strategiesJournal of the Operational Research Society2006571638110.1057/palgrave.jors.2601954
  • CoxDRenewal Theory1967
  • Fleming KN (1975). A reliability model for common mode failure in redundant safety systems. Proceedings of the Sixth Annual Pittsburgh Conference on Modeling and Simulation, General Atomic Report GA-A13284, 23–25 April.
  • GeurtsJHJOptimal age replacement versus condition based replacement: some theoretical and practical considerationsJournal of Quality Technology1983154171179
  • GlasserGJThe age replacement problemTechnometrics196791839110.1080/00401706.1967.10490443
  • JardineAKSMaintenance, Replacement and Reliability1998
  • LundteigenMARausandMCommon cause failures in safety instrumented systems on oil and gas installations: Implementing defense measures through function testingJournal of Loss Prevention in the Process Industries200720321822910.1016/j.jlp.2007.03.007
  • Mosleh A, Parry G, Paula H, Worledge D and Rasmusson D (1988). Procedures for treating common cause failures in safety and reliability studies. NUREG/CR-4780, EPRI NP-5613, Vol.1—Procedural framework and examples. Report prepared for the U.S. Nuclear Regulatory Commission and Electric Power Research Institute by Pickard, Lowe and Garrick, Inc.
  • Mosleh A, Rasmuson DM and Marshall FM (1998). Guidelines on modeling common-cause failures in probabilistic risk assessment. NUREG/CR-5485, INEEL/EXT-97-01327. Report prepared for the U.S. Nuclear Regulatory Commission.
  • RausandMHøylandASystem Reliability Theory—Models, Statistical Methods and Applications2004
  • RossSMIntroduction to Probability Models1997
  • SenjuSA probabilistic approach to preventive maintenanceJournal of the Operations Research Society of Japan1957114958
  • Stott JE, Britton P, Ring RW, Hark F and Hatfield GS (2010). Common cause failure modeling: Aerospace versus nuclear. Tenth International Probabilistic Safety Assessment and Management Conference Seattle, United States, 7–11 June.
  • UsherJSKamalAHSyedWHCost optimal preventive maintenance and replacement schedulingIIE Transactions1998301211211128
  • ZhangFJardineAKSOptimal maintenance models with minimal repair, periodic overhaul and complete renewalIIE Transactions1998301211091119

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.