40
Views
6
CrossRef citations to date
0
Altmetric
Original Article

Multiple orders per job formation and release strategies in large-scale wafer fabs: a simulation study

, , &
Pages 25-43 | Received 05 Dec 2009, Accepted 04 Oct 2010, Published online: 19 Dec 2017

References

  • AngrawalGKHeraguSSA survey on automated material handling systems in 300-mm semiconductor fabsIEEE Trans Semiconduct Manuf200619111211910.1109/TSM.2005.863217
  • BonvikAMCouchCEGershwinSBA comparison of production-line control mechanismInt J Prod Res199735378980410.1080/002075497195713
  • BuzenJPComputational algorithms for closed queuing networks with exponential serversCommun ACM197316952753110.1145/362342.362345
  • CurryGLFeldmannRMManufacturing Systems Modeling and Analysis2009
  • DerringerGSuichRSimultaneous optimization of several response variablesJ Qual Technol198012214219
  • EnnsSTClarifying CONWIP versus push system behavior using simulationProceedings of the 2008 Winter Simulation Conference200818671872
  • ErramilliVMasonSJMultiple orders per job compatible batch schedulingIEEE Trans Electron Packag Manuf200629428529610.1109/TEPM.2006.887355
  • FowlerJWHoggGLMasonSJWorkload control in the semiconductor industryProd Plann Control200213756857810.1080/0953728021000026294
  • Fowler JW and Robinson J (1995). Measurement and improvement of manufacturing capacities (MIMAC): Final report. Technical Report 95062861A-TR, SEMATECH, Austin, TX.
  • FraminanJMGonzalezPLRuiz-UsanoRThe CONWIP production control system: Review and research issuesProd Plann Control200314325526510.1080/0953728031000102595
  • GanBPChanLPTurnerSJInteroperating simulations of automatic material handling systems and manufacturing processesProceedings of the 2006 Winter Simulation Conference200611351229
  • GillandWA simulation study comparing performance of conwip and bottleneck-based release rulesProd Plann Control200213221121910.1080/09537280110069784
  • GstettnerSKuhnHAnalysis of production control systems Kanban and CONWIPInt J Prod Res199634113253327310.1080/00207549608905087
  • GuptaJNDRuizRFowlerJWMasonSJOperational planning and control of semiconductor wafer productionProd Plann Control200617763964710.1080/09537280600900733
  • HelberSSchimmelpfengKStolletzRFirst results on setting inventory levels of CONWIP flow lines via linear programmingProceedings Seventh International Conference on Stochastic Models of Manufacturing and Service Operations2009208216
  • HoppWJSpearmanMLFactory Physics2000
  • JampaniJMasonSJColumn generation heuristics for multiple machine, multiple orders per job scheduling problemsAnn Opns Res2008159126127310.1007/s10479-007-0281-2
  • JiaJMasonSJSemiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machinesInt J Prod Res200947102565258510.1080/00207540701725042
  • KanetJJMean flow time and inventory in production systems: A finite time analogue to little’s lawInt J Prod Econ2004911374610.1016/S0925-5273(03)00219-6
  • KimSParkYJunC-HPerformance evaluation of re-entrant manufacturing system with production loss using mean-value analysisComput Opns Res2006331308132510.1016/j.cor.2004.09.014
  • LaubJDFowlerJWKehaABMinimizing makespan with multiple-orders-per-job in a two-machine flowshopEur J Opl Res20071281637910.1016/j.ejor.2006.07.023
  • LiNZhenLLiQ-LPerformance analysis of two-loop closed production systemsComput Opns Res20093611913410.1016/j.cor.2007.07.008
  • MASM test data sets (2010). http://www.eas.asu.edu/~masmlab, accessed 22 November 2010.
  • Mason SJ, Qu P, Kutanoglu E and Fowler JW (2004). The single machine multiple orders per job scheduling problem, ASU Working Paper, ASUIE-ORPS-2004-004.
  • MathirajanMSivakumarAIALiterature review, classification and simple meta-analysis on scheduling of batch processors in semiconductorInt J Adv Manuf Technol200629990100110.1007/s00170-005-2585-1
  • MönchLSimulation-based assessment of order release strategies for a distributed shifting bottleneck heuristicProceedings of the 2005 Winter Simulation Conference200520932186
  • MönchLRoseOSturmRASimulation framework for performance assessment of shop-floor control systemsSIMULATION: Trans Soc Model Comput Simul Int200379316317010.1177/0037549703256039
  • MönchLZimmermannJFowlerJWMasonSJA simulation-based and an analytic modeling approach to calculate and appropriate number of FOUPs in wafer fabsProceedings of the 2009 INFORMS Simulation Society Research Workshop20095761
  • PahlJVoßSWoodruffDLProduction planning with load dependent lead times: An update of researchAnn Opns Res200715329734510.1007/s10479-007-0173-5
  • ParkYKimSJunC-HMean value analysis of reentrant line with batch machines and multi-class jobsComput Opns Res2002291009102410.1016/S0305-0548(00)00099-X
  • PfundMEA multi-criteria approach for scheduling semiconductor wafer fabrication facilitiesJ Scheduling2008111294710.1007/s10951-007-0049-1
  • QuPMasonSJMetaheuristic scheduling of 300 mm jobs containing multiple ordersIEEE Trans Semiconduct Manuf200518463364310.1109/TSM.2005.858503
  • ReiserMLavenbergSSMean value analysis of closed multi-chain queuing networksJ ACM198027252753110.1145/322186.322195
  • RyanMBaynatBChoobinehFDetermining inventory levels in a CONWIP controlled job shopIIE Trans200032105114
  • SchweitzerPApproximate analysis of multi-class closed networks of queuesProceedings of the International Conference on Stochastic Control and Optimization19792529
  • SpearmanMWoodruffDHoppWCONWIP: A pull alternative to KanbanInt J Prod Res19902887989410.1080/00207549008942761
  • SpierJKempfKSimulation of emergent behavior in manufacturing systemsProceedings of the IEEE/SEMI Advanced Semiconductor Manufacturing Conference19959094
  • SuriRHildebrantRModeling flexible manufacturing systems using mean-value analysisJ Manuf Syst198431273810.1016/0278-6125(84)90020-7
  • SuriRSahuSVernonMApproximate mean value analysis for closed queuing networks with multiple-server stationsProceedings of the 2007 Industrial Engineering Research Conference2007
  • TempelmeierHKuhnHFlexible Manufacturing Systems: Decision Support for Design and Operation1993
  • VepsalainenAMortonTEPriority rules and lead time estimate for job shop scheduling with weighted tardiness costsMngt Sci1987331036104710.1287/mnsc.33.8.1035
  • ZimmermannJMönchLMasonSJFowlerJWDetermining an appropriate number of FOUPS in semiconductor wafer fabrication facilitiesProceedings of the 2008 Winter Simulation Conference200821642170

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.