References
- ElmaghrabySEThe economic lot scheduling problem (ELSP): review and extensionsMngt Sci19782458759810.1287/mnsc.24.6.587
- LarranetaJOnievaLThe economic lot scheduling problem: a simple approachJ Opl Res Soc19883937337910.1057/jors.1988.65
- WareNKeownBCommon cycle scheduling: a successful applicationProd Invent Mngt1987281622
- SilverEAShelf life consideration in a family production contextInt J Prod Res1989272021202610.1080/00207548908942671
- SarkerBRBabuPSEffect of production cost on shelf lifeInt J Prod Res1993311865187210.1080/00207549308956828
- ChowdhuryMRSarkerBRManufacturing batch size and ordering policy for products with shelf livesInt J Prod Res2001391405142610.1080/00207540110052148
- SilverEADeliberately slowing down output in a family production contextInt J Prod Res199028172710.1080/00207549008942681
- SilverEADealing with a shelf life constraint in cyclic scheduling by adjusting both cycle time and production rateInt J Prod Res19953362362910.1080/00207549508930169
- ViswanathanSGoyalSKOptimal cycle time and production rate in a family production context with shelf life considerationsInt J Prod Res1997351703171110.1080/002075497195218