196
Views
19
CrossRef citations to date
0
Altmetric
Special Issue Paper

Integration of production planning and scheduling using an expert system and a genetic algorithm

Pages 455-463 | Received 01 Oct 2005, Accepted 01 Mar 2007, Published online: 21 Dec 2017

References

  • AkkanCKarabatiSThe two-machine flowshop total completion time problem: Improved lower bounds and a branch-and-bound algorithmEur J Opl Res200415442042910.1016/S0377-2217(03)00415-6
  • BłażewiczJDomschkeWPeschEThe job shop scheduling problem: Conventional and new solution techniquesEur J Opl Res19969313310.1016/0377-2217(95)00362-2
  • BongaertsLMonostoriLMcFarlaneDKádárBHierarchy in distributed shop floor controlComp Ind20004312313710.1016/S0166-3615(00)00062-2
  • ChengRGenMTsujimuraYA tutorial survey of job-shop scheduling problems using genetic algorithms part 1Representation Comp Ind Eng1996498399710.1016/0360-8352(96)00047-2
  • ConwayRNMaxwellWLMillerLWTheory of Scheduling1967
  • CowlingPJohanssonMUsing real time information for effective dynamic schedulingEur J Opl Res200213923024410.1016/S0377-2217(01)00355-1
  • Della CroceFGhirardiMTadeiRAn improved branch and bound algorithm for the two-machine total completion time flowshop problemEur J Opl Res200213929330110.1016/S0377-2217(01)00374-5
  • FraminanJMGuptaJNDLeistenRA review and classification of heuristics for permutation flowshop scheduling with makespan objectiveJ Opl Res Soc2004551243125510.1057/palgrave.jors.2601784
  • GoldbergDEGenetic Algorithms in Search, Optimization, and Machine Learning1989
  • GoldbergDRLingleRAlleles loci and the travelling salesman problemProceedings of the First International Conference on Genetic Algorithms1985154159
  • GuptaJNDHennigKWernerFLocal search heuristics for two stage flow shop problems with secondary criterionComput Opl Res20022912314910.1016/S0305-0548(00)00061-7
  • HollandJAdaptation in Natural and Artificial Systems1975
  • KnosalaRWalTA production scheduling problem using genetic algorithmJ Mater Process Technol2001109909510.1016/S0924-0136(00)00780-9
  • KohSCLSaadSMManaging uncertainty in ERP-controlled manufacturing environments in SMEsInt J Prod Econ200610110912710.1016/j.ijpe.2005.05.011
  • KumarNSHSrinivasanGA genetic algorithm for job shop scheduling—A case studyComp Ind19963115516010.1016/0166-3615(96)00043-7
  • ŁawrynowiczACombination of expert system and genetic algorithm for job shop planning and schedulingProceedings of 5th International Carpathian Control Conference2004943948
  • ŁawrynowiczAIntegration of production planning and scheduling using expert system and genetic algorithmProceedings of the Third European Conference on Intelligent Management Systems in Operations20053342
  • MárkusAVánczaJKisTKovácsAProject scheduling approach to production planningAnn CIRP20035235936210.1016/S0007-8506(07)60601-5
  • OgbuFASmithDKSimulated annealing for the permutation flowshop problemOmega199019646710.1016/0305-0483(91)90036-S
  • ParkSJKimJWKangHWHeuristic knowledge representation of production scheduling: An integrated modeling approachExpert Syst Appl19963/432533910.1016/0957-4174(96)00011-5
  • PercyDFKobbacyKAHDetermining economical maintenance intervalsInt J Prod Econ200067879410.1016/S0925-5273(00)00013-X

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.