References
- AbouRizkSRole of simulation in construction engineering and managementJournal of Construction Engineering and Management2010136101140115310.1061/(ASCE)CO.1943-7862.0000220
- AbouRizk S, Ruwanpura J, Er K, and Fernando S (1999). Special purpose simulation template for utility tunnel construction. In: Sturrock DT, Evans GW, Farrington PA and Nemhard HB (eds), Proceedings of the 1999 Winter Simulation Conference. IEEE: Squawk Peak, Phoenix, AZ, pp 948–955.
- Al-BatainehMAbouRizkSParkisHUsing simulation to plan tunnel constructionJournal of Construction Engineering and Management2013139556457110.1061/(ASCE)CO.1943-7862.0000626
- Al-Battaineh H, AbouRizk S, Tan J, and Fernando S (2006). Productivity simulation during the planning phase of the Glencoe tunnel in Calgary, Canada: a case study. In: Nicol D, Fujimoto R, Lawson B, Liu J, Perrone F and Wieland F (eds), Proceedings of the 2006 Winter Simulation Conference. IEEE: Monterey, CA, pp 2087–2092.
- BeerGNumerical Simulation in Tunnelling2003ViennaSpringer
- DIN EN 13306: Maintenance Terminology; Trilingual Version2001BerlinBeuth
- EbrahimyYAbouRizkSFernandoSMohamedYSimphony supply chain simulator. A simulation toolkit to model the supply chain of construction projectsSimulation201187865766710.1177/0037549710380992
- EbrahimyYAbouRizSFernandoSMohamedYSimulation modeling and sensitivity analysis of a tunneling construction project’s supply chainConstruction and Architectural Management201118546248010.1108/09699981011074600
- GammaEHelmRJohnsonRVlissidesJDesign Patterns—Elements of Reusable Object-Oriented Software2014Reading, MAAddison-Wesley
- HassanpourJRostamiJTarigh AzaliSZhaoJIntroduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel IranTunnelling and Underground Space Technology20144322223110.1016/j.tust.2014.05.007
- Herrenknecht AG (2016a). Excavation Tools—Durability Pays Off. https://www.herrenknecht.com/en/products/additional-equipment/tunnelling-logistics/excavation-tools.html, accessed 28 January 2016.
- Herrenknecht AG (2016b). Mixshield—Safe Tunnelling Technology for Heterogeneous Ground. https://www.herrenknecht.com/en/products/core-products/tunnelling/mixshield.html, accessed 28 January 2016.
- HyunKMinSChoiHParkJLeeIRisk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnelsTunnelling and Underground Space Technology20154912112910.1016/j.tust.2015.04.007
- Jakobsen P (2014). Estimation of Soft Ground Excavation Tool Life in TBM Tunneling. Dissertation, Trondheim.
- Köhler M, Maidl U, and Martak L (2011). Abrasiveness and tool wear in shield tunnelling in soil/Abrasivität und Werkzeugverschleiß beim Schildvortrieb im Lockergestein. Geomechanics and Tunnelling4. doi: 10.1002/geot.201100002.
- KönigMThewesMRahmTSchefferMSadriKConradsAProzesssimulation von maschinellen Tunnelvortrieben—Verfügbarkeitsanalysen der Leistungsprozesse unter Berücksichtigung von StillständenBauingenieur20148911467477
- Köppl F (2014). Abbauwerkzeugverschleiß und empirische Verschleißprognose beim Vortrieb mit Hydroschild TVM in Lockergesteinen. Dissertation, München.
- KöpplFThuroKThewesMSuggestion of an empirical prognosis model for cutting tool wear of Hydroshield TBMTunnelling and Underground Space Technology20154928729410.1016/j.tust.2015.04.017
- MeschkeGNinićJStascheitJAlsahlyAParallelized computational modeling of pile–soil interactions in mechanized tunnelingEngineering Structures201347354410.1016/j.engstruct.2012.07.001
- NagelFStascheitJMeschkeGA numerical simulation model for shield tunnelling with compressed air supportGeomechanics and Tunnelling20081322222810.1002/geot.200800016
- NilsenBDahlFHolzhäuserJRaleighPAbrasivity testing for rock and soilsTunnels and Tunnelling International200644749
- RahmTSchefferMThewesMKönigMDuhmeREvaluation of disturbances in mechanized tunneling using process simulationComputer-Aided Civil and Infrastructure Engineering201631317619210.1111/mice.12143
- RostamiJGharabaghEPalominoAMoslehMDevelopment of soil abrasivity testing for soft ground tunnelingTunnelling and Underground Space Technology20122824525610.1016/j.tust.2011.11.007
- Scheffer M, Rahm T, König M, and Thewes M (2016). Simulation-based analysis of integrated production and jobsite logistics in mechanized tunneling. Journal of Computing in Civil Engineering30(5).
- Scheffer M, Rahm T, and König M (2014). Simulation-based analysis of surface jobsite logistics in mechanized tunneling. In: Issa R, Issa I F (eds.), 2014 International Conference on Computing in Civil and Building Engineering. Orlando, Florida, United States, June 23–25, pp 705–712.
- United Air Lines Inc. San Francisco CA (2011). Reliability-Centered Maintenance. Department of Defense Standard Practice.
- WangLKangYZhaoXZhangQDisc cutter wear prediction for a hard rock TBM cutterhead based on energy analysisTunnelling and Underground Space Technology20155032433310.1016/j.tust.2015.08.003