References
- AgnetisAMirchandaniPBPacciarelliDPacificiAScheduling problems with two competing agentsOperations Research200452222924210.1287/opre.1030.0092
- AgnetisABillautJ-CGawiejnoviczSPacciarelliDSoukhalAMultiagent Scheduling2014Models and AlgorithmsSpringer-Verlag
- AlidaeeBWomerNKScheduling with time dependent processing times: Review and extensionsJournal of the Operational Research Society199950771172010.1057/palgrave.jors.2600740
- ArbibCSmriglioSServilioMA competitive scheduling problem and its relevances to UMTS channel assignmentNetworks200444213214110.1002/net.20023
- BakerKRSmithJCA multiple-criterion model for machine schedulingJournal of Scheduling20036171610.1023/A:1022231419049
- Ben-AriehDMaimonOAnnealing method for PCB assembly scheduling on two sequential machinesInternational Journal of Computer Integrated Manufacturing19925636136710.1080/09511929208944543
- BiskupDSingle-machine scheduling with learning considerationsEuropean Journal of Operational Research1999115217317810.1016/S0377-2217(98)00246-X
- BiskupDA state-of-the-art review on scheduling with learning effectEuropean Journal of Operational Research2008188231532910.1016/j.ejor.2007.05.040
- ChengTCEWangGSingle machine scheduling with learning effect considerationsAnnals of Operations Research2000981–427329010.1023/A:1019216726076
- ChengTCEDingQLinBMTA concise survey of scheduling with time-dependent processing timesEuropean Journal of Operational Research2004152111310.1016/S0377-2217(02)00909-8
- ChengTCEChengSRWuWHHsuPHWuCCA two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerationsComputers & Industrial Engineering201160453454110.1016/j.cie.2010.12.008
- ChengTCEWuWHChengSRWuCCTwo-agent scheduling with position-based deteriorating jobs and learning effectsApplied Mathematics and Computation2011217218804882410.1016/j.amc.2011.04.005
- EtilerOTokluBAtakMWilsonJA generic algorithm for flow shop scheduling problemsJournal of the Operations Research Society200455883083510.1057/palgrave.jors.2601766
- FisherMLA dual algorithm for the one-machine scheduling problemMathematical Programming197111122925110.1007/BF01580393
- GawiejnowiczSTime-Dependent Scheduling2008BerlinSpringer
- HallNGPottsCNRescheduling for new ordersOperations Research200452344045310.1287/opre.1030.0101
- JaniakAKrysiakTTrelaRScheduling Problems with Learning and Ageing Effects: A SurveyDecision Making in Manufacturing and Services201151–21936
- KirkpatrickSGelattCVecchiMOptimization by simulated annealingScience1983220459867168010.1126/science.220.4598.671
- KoulamasCKyparisisGJSingle-machine and two-machine flowshop scheduling with general learning functionsEuropean Journal of Operational Research2007178240240710.1016/j.ejor.2006.01.030
- KuoWHYangDLMinimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effectEuropean Journal of Operational Research200617421184119010.1016/j.ejor.2005.03.020
- LeungJYTPinedoMWanGCompetitive two agent scheduling and its applicationsOperations Research200958245846910.1287/opre.1090.0744
- LenstraJKRinnooy KanAHGBruckerPComplexity of machine scheduling problemsAnnals of Discrete Mathematics1977134336210.1016/S0167-5060(08)70743-X
- LiD-CHsuP-HSolving a two-agent single-machine scheduling problem considering learning effectComputers & Operations Research20123971644165110.1016/j.cor.2011.09.018
- LiGWangX-YWangJ-BSunL-YWorst case analysis of flow shop scheduling problems with a time-dependent learning effectInternational Journal of Production Economics201314219810410.1016/j.ijpe.2012.10.015
- LiuPTangLTwo-agent scheduling with linear deteriorating jobs on a single machineLecture Notes in Computer Science2008509264265010.1007/978-3-540-69733-6_63
- MonchLBalasubramanianHFowlerJWPfundMEHeuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready timesComputers and Operations Research200532112731275010.1016/j.cor.2004.04.001
- ReeverCHeuristics for scheduling a single machine subject to unequal job release timesEuropean Journal of Operational Research199580239740310.1016/0377-2217(93)E0290-E
- WuC-CLeeWC LeeChenTHeuristic algorithms for solving the maximum lateness scheduling problem with learning considerationsComputers and Industrial Engineering200752112413210.1016/j.cie.2006.10.007
- WuW-HChengS-RWuC-CYinYAnt colony algorithms for two-agent scheduling with sum-of-processing-times-based learning and deteriorating considerationsJournal of Intelligent Manufacturing20122351985199310.1007/s10845-011-0525-5
- YinYChengS-RWuC-CScheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penaltiesInformation Sciences201218928229210.1016/j.ins.2011.11.035
- YinYChengS-RChengTCEWuW-HWuC-CTwo-agent single-machine scheduling with release times and deadlinesInternational Journal of Shipping and Transport Logistics201351759410.1504/IJSTL.2013.050590