Publication Cover
The Engineering Economist
A Journal Devoted to the Problems of Capital Investment
Volume 60, 2015 - Issue 1
715
Views
3
CrossRef citations to date
0
Altmetric
Original Articles

Causes of Budget Changes in Building Construction Projects: An Empirical Study in Taiwan

&

References

  • An, S.-H., Park, U.Y., Kang, K.-I., Cho, M.-Y. and Cho, H.-H. (2007) Application of support vector machines in assessing conceptual cost estimates. Journal of Computing in Civil Engineering, 21(4), 259–264.
  • Arain, F.M. and Low, S.P. (2005a) The nature and frequency of occurrence of variation orders for educational building projects in Singapore. International Journal of Construction Management, . 5(2), 79–91.
  • Arain, F.M. and Low, S.P. (2005b) The potential effects of variation orders on institutional building projects. Facilities, . 23(11/12), 496–510.
  • Arain, F.M. and Low, S.P. (2006) Developers’ view of potential causes of variation orders for institutional buildings in Singapore. Architectural Science Review, . 49(1), 59–74.
  • Arain, F.M. and Low, S.P. (2007) PSSCOC and variations: an analysis of consultant related variations in school building projects. International Construction Law Review, . 24(3), 366–381.
  • Chevroulet, T., Giorgi, L. and Reynaud, C. (2012) New approach for the assessment of high-speed rail projects and how to contain cost overruns: lessons from the EVA-TREN Project. Journal of Infrastructure Systems, . 18(4), 297–304.
  • Construction and Planning Agency, Ministry of the Interior. (2006) Economic survey of construction industry in Taiwan, 2005 executive summary. Available at http://www.cpami.gov.tw/english/index.php?option=com_content&view=article&id=10762:2010-05-07-16-17-39&catid=3:statistics&Itemid=17 (accessed 20 February 2012).
  • Construction and Planning Agency, Ministry of the Interior. (2012) Registered capital and number of contractor. Available at http://www.cpami.gov.tw/chinese/index.php?option=com_content&view=article&id=11628&Itemid=102 (accessed 20 February 2012).
  • Cronbach, L. (1951) Coefficient alpha and the internal structure of tests. Psychometrika, . 16(3), 297–334.
  • de Wit, A. (1988) Measurement of project success. International Journal of Project Management, . 6(3), 164–170.
  • Dvir, D., Raz, T. and Shenhar, A.J. (2003) An empirical analysis of the relationship between project planning and project success. International Journal of Project Management, . 21(2), 89–95.
  • Feagin, J.R., Orum, A.M. and Sjoberg, G. (1991) A case for the case study. University of North Carolina Press, Chapel Hill, NC.
  • Gharaibeh, H. (2013) Cost control in mega projects using the Delphi method. Journal of Management in Engineering. doi: 10.1061/(ASCE)ME.1943-5479.0000218.
  • Hsieh, T.-Y., Lu, S.-T. and Wu, C.-H. (2004) Statistical analysis of causes for change orders in metropolitan public works. International Journal of Project Management, . 22(8), 676–686.
  • Hwang, B.-G. and Low, L.K. (2011) Construction project change management in Singapore: status, importance and impact. International Journal of Project Management, . 30(7), 817–826.
  • Hwang, B.-G., Thomas, S.R., Haas, C.T. and Caldas, C.H. (2009) Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, . 135(3), 187–198.
  • Ibbs, C.W. (1997) Quantitative impacts of project change: size issues. Journal of Construction Engineering and Management, . 123(3), 308–311.
  • Ibbs, C.W., Wong, C.K. and Kwak, Y.H. (2001) Project change management system. Journal of Management in Engineering, . 17(3), 159–165.
  • Ika, L.A. (2009) Project success as a topic in project management journals. Project Management Journal, . 40(4), 6–19.
  • International Project Management Association. (2010) ICB-IPMA competence baseline, Version 3.0. International Project Management Association, Nijkerk, The Netherlands.
  • Iyer, K.C. and Jha, K.N. (2005) Factors affecting cost performance: evidence from Indian construction projects. International Journal of Project Management, . 23(4), 283–295.
  • Motawa, I., Anumba, C., Lee, S. and Peña-Mora, F. (2007) An integrated system for change management in construction. Automation in Construction, . 16(3), 368–377.
  • Nunnally, J.C. and Bernstein, I.H. (1994) Psychometric theory. McGraw-Hill, New York.
  • Oberlender, G.D. (2000) Project management for engineering and construction. McGraw-Hill, New York.
  • Oberlender, G.D. and Trost, S.M. (2001) Predicting accuracy of early cost estimates based on estimate quality. Journal of Construction Engineering and Management, . 127(3), 173–182.
  • Project Management Institute. (2010) A guide to the project management body of knowledge (PMBOK guide). Project Management Institute, Newtown Square, PA.
  • Shane, J.S., Molenaar, K.R., Anderson, S. and Schexnayder, C. (2009) Construction project cost escalation factors. Journal of Management in Engineering, . 25(4), 221–229.
  • Sijtsma, K. (2009) On the use, the misuse, and the very limited usefulness of Cronbach's alpha. Psychometrika, . 74(1), 107–120.
  • Stake, R.E. (1995) The art of case study research. Sage Publications, Thousand Oaks, CA.
  • Sun, M. and Meng, X. (2009) Taxonomy for change causes and effects in construction projects. International Journal of Project Management, . 27(6), 560–572.
  • Tavakol, M. and Dennick, R. (2011) Making sense of Cronbach's alpha. International Journal of Medical Education, . 2011(2), 53–55.
  • Tellis, W. (1997) Application of a case study methodology. The Qualitative Report. Available at http://www.nova.edu/ssss/QR/QR3-3/tellis2.html (accessed 29 May 2014).
  • Wu, C.-H., Hsieh, T.-Y. and Cheng, W.-L. (2005) Statistical analysis of causes for design change in highway construction on Taiwan. International Journal of Project Management, . 23(7), 554–563.
  • Yin, R.K. (2009) Case study research: design and methods. Sage Publications, Thousand Oaks, CA.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.