5
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

The expansion of power generating systems: The need for broader assessments

Pages 265-270 | Received 15 Apr 1980, Published online: 07 Apr 2008

References

  • Jenkin , F. P. “Power system planning in England and Wales” . presented at the IEEE Conference . New York.
  • Davis , C. H. 1976 . “Forecast of CEGB power requirements” . presented at the Infrastructure Projects Course, Planning Centre for Developing Countries . 1976 , U.K.. University of Bradford .
  • Hatfield , J. P. , Davies , C. H. and Cox , W. P. 1974 . “The energy balance method—latest developments” . Load Forecasting Conference . 1974 , Horsley Towers.
  • Department of Energy . 1978 . “Energy forecasting methodology” . In Energy Paper No. 29 , London : HMSO .
  • Department of Energy, Mines and Resources, Canada . 1977 . “Energy demand projections—a total energy approach” . Report ER‐77–74 Energy Policy Analysis Division .
  • Sahi , R.K. and Erdmann , R. W. 1978 . “A policy model of Canadian interfuel substitution demands” . paper presented at the Canadian Energy Policy Modelling Conference . 1978 , Vancouver.
  • Taylor , L. D. 1976 . “Decreasing block pricing and the residential demand for electricity” . Report CP‐76–1 International Institute for Applied Systems Analysis .
  • Uri , N.D. and Maybee , J. S. 1977/78 . “Smooth approximation and forecasting of load duration curves” . Electrical Power Systems Research , 1 : 255 – 259 .
  • Beglari , F. and Laughton , M. A. 1975 . “The combined costs method for optimal economic planning of an electrical power system” . IEEE Transactions on Power Apparatus and Systems , PAS‐34 : 6
  • Fernando , P. N. 1976 . “The Planning of Electrical Power System Generation and Transmission Using Integer Programming and Reliability Constraints” . University of London . Ph.D. Thesis,
  • Soares , S. , Lyra , C. and Tavares , H. 1979 . “Optimal generation scheduling of hydrothermal power systems” . Paper F79, 164–5, IEEE PES Winter Meeting . 1979 .
  • Lyra , C. , Yamakami , A. , Soares , S. and Tavares , H. 1979 . “Optimal generation scale for power systems” . XII Brazilian Symposium on Operational Research . 1979 , Sao Paulo, Brazil. (in Portuguese),
  • Haimes , Y. Y. , Hall , W. A. and Freedman , H. T. 1975 . Multiobjective Optimization in Water Resource Systems: The Surrogate Worth Trade‐Off Method , Amsterdam : Elsevier Scientific Publishing Company .
  • Cheong , H.K. and Dillon , T. S. 1978 . “Application of multiobjective optimization methods to the problem of generation expansion planning” . Proc. of the Sixth Power Systems Computation Conference 1 . 1978 , Darmstadt. IPC Science and Technology Press, London .
  • ELETROBRAS (Brazilian Power Supply Company) . 1974 . Plan to meet the electrical energy requirements up to 1990—Brazilian south‐eastern and southern regions (in Portuguese)
  • 1975 . Report of the Brazilian Delegation , Brazil : Committee for Electrical Energy Regional Integration—subcommittee for the planning of power systems . (in Portuguese)
  • 1979 . Brazilian Energy Model , Brazil : Ministry of Mines and Energy, General Office . (in Portuguese),
  • Doctoral student, Department of Mechanical Engineering, University of Newcastle upon Tyne, England.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.