83
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

Integrated Material Planning and Operations Scheduling (IMPOS)

Pages 4285-4304 | Published online: 14 Nov 2010

References

  • BARKER , J. R. SBM--Schedule Based Manufacturing . Australian Conference on Manufacturing Engineering . Adelaide , Australia.
  • BLACKBURN , J. H. Improving MRP and JIT compatibility by combining routings and bill of material . Proceedings of the American Production and Inventory Control Society . Washington , US. pp. 444 – 447 .
  • BERRY , W. L. 1972 . Lot sizing procedure for requirements planning system: a framework for analysis . Production anil Inventory Management Journal, No , 13 : 19 – 34 .
  • BROWNE , J. , HARHEN , J. and SHIVNAN , J. 1996 . Production Management Systems: an integrated Perspective , UK : Wesley .
  • BUXEY , G. 1989 . Production scheduling: practice and theory . European Journal of Operations Research , 39 : 17 – 31 .
  • CHENG , T. C. E. and GUPTA , M. C. 1989 . Survey of scheduling, research involving due-date determination decisions . European Journal of Operational Research , 38 : 156 – 166 .
  • COLLER , D. A. 1980 . A comparison of MRP lot sizing methods considering capacity change costs . Journal of Operations Management , 1 : 23 – 29 .
  • DAUZERE-PERES , S. and LASSERRE , J. B. 1994 . An Integrated Approach in Production Planning and Scheduling , Germany : Springer-Verlag .
  • DUGGAN , J. and BROWNE , J. 1991 . Production activity control: a practical approach to scheduling . The International Journal of Flexible Manufacturing Systems , 4 : 79 – 103 .
  • EALLAH , H. 1996 . An integrated production planning and finite scheduling approach with reduced lead time effects , Melbourne , , Australia : Swinburne University of Technology . PhD thesis
  • FALLAH , H. and SHAYAN , E. A finite capacity planning and scheduling approach with improved lead lime over MRP . Proceedings of the 6th ICME . Melbourne , Australia. pp. 303 – 310 .
  • FRY , T. D. , PHILIPOOM , P. R. and MARKLAND , R. E. 1989 . Due-date assignment in a multistage job shop . IIE Transactions , 21 : 153 – 161 .
  • GOLDRATT , E. M. and COX , J. 1992 . The Goal, , 2nd edn , US : North River .
  • GUPTA , S. M. and BRENNAN , L. 1992 . Heuristic and optimal approaches to lot sizing incorporation back orders an empirical evaluation . International Journal of Production Research , 30 : 2813 – 2824 .
  • HANDFIELD , R. B. and PANNESI , R. T. 1995 . Antecedents of lead lime competitiveness in make-to-order manufacturing firms . International Journal of Production Research , 33 : 511 – 537 .
  • HASTINGS , N. A. J. , MARSHALL , P. H. and WILLIS , R. J. 1982 . Scheduling based MRP: an integrated approach to production scheduling and material requirements planning . Journal of the Operational Research Society , 33 : 1021 – 1029 .
  • HUISMAN , H. H. , POLDERMAN , G. L. and WEEDA , P. J. 1990 . Maximising throughput in some simple constrained scheduling situations . Engineering Costs and Production Economics , 18 : 293 – 299 .
  • KOGAN , K. 1994 . An extended bill of material model for selecting production alternatives in a multi-routeing environment . International Journal of Production Research , 32 : 657 – 667 .
  • MACCARTHY , B. L. and LIU , J. 1993 . Addressing the gap in scheduling research: a review of optimisation and heuristic methods in production scheduling . International Journal of Production Research , 31 : 59 – 79 .
  • MCKAY , K. N. 1992 . Production Planning and Scheduling: A model for Manufacturing Decisions Requiring Judgement , Canada : University of Waterloo . PhD thesis
  • MORTON , T. E. and PENTICO , D. W. 1993 . Heuristic Scheduling Systems: with Applications to Production Systems and Project Management , US : Wiley .
  • NEELY , A. D. and BYRNE , M. D. 1992 . A simulation study of bottleneck scheduling . International Journal of Production Economics , 26 : 187 – 192 .
  • PHILLIPOOM , P. R. , REES , L. , TAYLOR , B. and HUANG , P. 1990 . A mathematical programming approach for determining workcenter lotsizes in a Just In Time system with single Kanbans . International Journal of Production Research , 28 : 1 – 15 .
  • SATTY , T. 1994 . The Fundamental of Decision Making and Priority Theory with the Analytic Hierarchy Process , Vol. VI , RWS Publishers . AHP Series
  • SHAYAN , E. and FALLAH , H. 1999 . A new approach to finite scheduling . International Journal of Production Research , 37 : 1903 – 1915 .
  • SOLBERG , J. J. 1989 . “ Production planning and scheduling in CIM ” . In Information Processing Edited by: Ritter , G. X. 919 – 925 .
  • SUN , D. and LIN , L. 1994 . A dynamic job shop scheduling framework: a backward approach . International Journal of Production Research , 32 : 967 – 985 .
  • TAM , M. M. C. , CHUNG , W. W. C. , SAXENA , K. B. C. , YANG , K. L. and DAVID , A. K. 1993 . Theory and Practice of Throughput Materials Requirement Planning (T-MRP) in Repetitive Manufacturing , 151 – 156 . Adelaide : ACME .
  • TSUBONE , H. , MATSUURA , H. and KANDA , M. 1992 . Interactive due-date management system . OMEGA International Journal of Management Science , 20 : 91 – 98 .
  • VILLA , R. and WATANABE , T. 1993 . Production Management beyond the dichotomy of push and pull . Computer Integrated Manufacturing Systems , 6 : 53 – 63 .
  • WOXVOLD , E. R. A. 1993 . ARMOR: an application package for processes and assembly manufacturing which combines MRPH, PERT/CPM, and Just-In-Time functions into one system , Melbourne , , Australia : Swinburne University of Technology . PhD thesis
  • ZAPFEL , G. and MISBAUOR , H. 1993 . New concepts for production planning and control . European Journal of Operations Research , 67 : 297 – 320 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.