178
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Distributed supply‐chain project rescheduling: Part I—impacts of information‐sharing strategies

, , &
Pages 5107-5129 | Received 01 Apr 2004, Published online: 16 Feb 2007

References

  • Abumaizar , R.J. and Svestka , J.A. 1997 . Rescheduling job shops under random disruptions . Int. J. Prod. Res , 35 : 2065 – 2082 .
  • Archimede , B. and Coudert , T. 2001 . Reactive scheduling using a multi-agent model: the SCEP framework . Eng. Applic. Artif. Intell , 14 : 667 – 683 .
  • Bruccoleri , M. , Amico , M. and Perrone , G. 2003 . Distributed intelligent control of exceptions in reconfigurable manufacturing systems . Int. J. Prod. Res , 41 : 1393 – 1412 .
  • Byeon , E. , Wu , S.D. and Storer , R.H. 1998 . Decomposition heuristics for robust job-shop scheduling . IEEE Trans. Robot. Autom , 14 : 303 – 313 .
  • Camarinha-Matos , L.M. and Afsarmanesh , H. 1999 . Infrastructures for Virtual Enterprises—Networking Industrial Enterprises , Dordrecht, , The Netherlands : Kluwer Academic .
  • Huang , G.Q. , Lau , J.S.K. and Mak , K.L. 2003 . The impacts of sharing production information on supply chain dynamics: a review of the literature . Int. J. Prod. Res , 41 : 1483 – 1517 .
  • Huang , G.Q. , Lau , J.S.K. and Mak , K.L. 2006 . Distributed supply chain project rescheduling: part II—distributed affected operations rescheduling algorithm . Int. J. Prod. Res , 44 (in press)
  • Jain , A.K. and Elmaraghy , H.A. 1997 . Production scheduling/rescheduling in flexible manufacturing . Int. J. Prod. Res , 35 : 281 – 309 .
  • Jensen , M.T. 2003 . Generating robust and flexible job shop schedules using genetic algorithms . IEEE Trans. Evolut. Comput , 7 : 275 – 288 .
  • Lau , J.S.K. 2004 . “ Impacts of sharing production information on supply chain dynamics ” . The University of Hong Kong . PhD thesis
  • Lau , J.S.K. , Huang , G.Q. and Mak , K.L. A modified agent-based contract-net protocol distributed project scheduling in supply chains . IEEE Trans. Syst. Man Cybern , in press
  • Lau , J.S.K. , Huang , G.Q. and Mak , K.L. 2004a . “ Distributed project scheduling in supply chains: part I—an agent-based negotiation algorithm ” . Department of Industrial and Manufacturing Systems Engineering, The University of Hong Kong . Working Paper (available directly from the corresponding author)
  • Lau , J.S.K. , Huang , G.Q. and Mak , K.L. 2004b . “ Distributed project scheduling in supply chains: part II—theoretical analysis and computational study ” . Department of Industrial and Manufacturing Systems Engineering, The University of Hong Kong . Working Paper (available directly from the corresponding author)
  • Leon , V.J. , Wu , S.D. and Storer , R.H. 1994 . Robustness measures and robust scheduling for job shops . IIE Trans , 26 : 32 – 43 .
  • Li , R.K. , Shyu , Y.T. and Adiga , S. 1993 . A heuristic rescheduling algorithm for computer-based production scheduling systems . Int. J. Prod. Res , 31 : 1815 – 1826 .
  • Neumann , K. , Schwindt , C. and Zimmermann , J. 2002 . “ Project scheduling with time windows and scare resources ” . In Lecture Notes in Economics and Mathematical Systems , Vol. 508 , Berlin : Springer .
  • Raheja , A.S. and Subramaniam , V. 2002 . Reactive Recovery of job shop schedules—a review . Int. J. Adv. Manuf. Technol , 19 : 756 – 763 .
  • Saad , A , Kawamura , K. and Biswas , G. 1997 . Performance evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems . Intell. Autom. Soft Comput , 3 : 229 – 248 .
  • Smith , R.G. 1980 . The contract net protocol: high-level communication and control in a distributed problem solver . IEEE Trans. Comput , 29 : 1104 – 1113 .
  • Smith , S.F. 1994 . “ Reactive scheduling systems ” . The Robotics Institute, Carnegie Mellon University . Technical Report
  • Subramaniam , V. and Raheja , A.S. 2003 . mAOR: a heuristic-based reactive repair mechanism for job shop schedules . Int. J. Adv. Manuf. Technol , 22 : 669 – 680 .
  • Sun , J. and Xue , D. 2001 . A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources . Comput. Ind , 46 : 189 – 207 .
  • Tsukada , T.K. and Shin , K.G. 1996 . PRIAM: polite rescheduler for intelligent automated manufacturing . IEEE Trans. Robot. Autom , 12 : 235 – 245 .
  • Vieira , G.E. , Herrmann , J.W. and Lin , E. 2003 . Rescheduling manufacturing systems: a framework of strategies, policies, and methods . J. Sched , 6 : 35 – 58 .
  • Zweben , M. , Davis , E. , Daun , B. and Deale , M.J. 1993 . Scheduling and rescheduling with iterative repair . IEEE Trans. Syst. Man Cybern , 23 : 1588 – 1596 .
  • Corresponding author. E‐mail: [email protected]

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.