294
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective

Pages 5253-5270 | Received 01 Jul 2005, Published online: 16 Feb 2007

References

  • Azevedo , AL and Sousa , JP . 2000 . Order planning for networked make-to-order enterprises — a case study . J. Oper. Res. Soc. , 51 : 1116 – 1127 .
  • Billington , P , McClain , J and Thomas , L . 1983 . Mathematical programming approaches to capacity-constrained MRP systems: review formulation and problem reduction . Management Science , 32 : 989 – 1006 .
  • Brucker , P , Drexl , A , Möhring , R , Neumann , K and Pesch , E . 1999 . Resource-constrained project scheduling: notation, classification, models, and methods . Eur. J. Oper. Res. , 112 : 3 – 41 .
  • Corsten , H , Gössinger , R and Schneiker , K . 2001 . Auftragsorientierte Produktionsprogrammplanung auf der Grundlage der opportunistischen Koordinierung . Zeitschrift für Planung , 12 : 307 – 328 .
  • Demeulemeester , EL and Herroelen , WS . 1996 . Modelling set-up times, process batches and transfer batches using activity network logic . Eur. J. Oper. Res. , 89 : 355 – 365 .
  • Drexl , A . 1990 . Fließbandaustaktung, Maschinenbelegung und Kapazitätsplanung in Netzwerken, ein integrierender Ansatz . Zeitschrift für Betriebswirtschaft , 60 : 53 – 70 .
  • Drexl , A and Kimms , A . 1997 . Lot sizing and scheduling — survey and extensions . Eur. J. Oper. Res. , 99 : 221 – 235 .
  • Drexl , A , Fleischmann , B , Günther , H-O , Stadtler , H and Tempelmeier , H . 1994 . Konzeptionelle Grundlagen kapazitätsorientierter PPS-Systeme . Zeitschrift für betriebswirtschaftliche Forschung , 46 : 1022 – 1045 .
  • Elmaghraby , SE . 1977 . Activity Networks. Project Planning and Control By Network Models , New York, NY : Wiley .
  • Fleischmann , B . 1990 . The discrete lot-sizing and scheduling problem . Eur. J. Oper. Res. , 44 : 337 – 348 .
  • Franck , B , Neumann , K and Schwindt , C . 1997 . A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods . OR Spektrum , 19 : 77 – 85 .
  • Gopalakrishnan , M , Dong , K , Bourjolly , J-M and Mohan , S . 2001 . A tabu-search heuristic for the capacitated lot-sizing problem with set-up carry over . Manag. Sci. , 47 : 851 – 863 .
  • Grunow , M , Günther , H-O and Yang , G . 2003 . Plant co-ordination in pharmaceutical networks . OR Spectrum , 25 : 109 – 141 .
  • Haase , K . 1994 . Lotsizing and Scheduling for Production Planning , Berlin : Springer .
  • Hartmann , S . 2000 . Packing problems and project scheduling models: an integrating perspective . J. Oper. Res. Soc. , 51 : 1083 – 1092 .
  • Hax , AC and Meal , HC . 1975 . “ Hierarchical integration of production planning and scheduling ” . In TIMS Studies in Management Science, Logistics , Edited by: Geisler , MA . Vol. 1 , 53 – 69 . Amsterdam : North Holland/American Elsevier .
  • Kallrath , J . 1999 . “ The concept of continguity in models based on time-indexed formulations ” . In Scientific Computing in Chemical Engineering II , Edited by: Keil , F , Mackens , W and Werther , J . 330 – 337 . Berlin : Springer .
  • Kimms , A . 2001 . Mathematical Programming and Financial Objectives for Scheduling Projects , Boston, MA : Kluwer .
  • Klein , R . 2000 . Scheduling of Resource-Constrained Projects , Boston, MA : Kluwer .
  • Kolisch , R . 2001 . Make-to-Order Assembly Management , Berlin : Springer .
  • Kolisch , R and Padman , R . 2001 . An integrated survey of deterministic project scheduling . OMEGA , 29 : 249 – 272 .
  • Krarup , J and Bilde , O . 1977 . “ Plant location set covering and economic lot sizing: an O(nm) algorithm for structured problems ” . In Numerische Methoden bei Optimierungsaufgaben, Band 3, Optimierung bei graphentheoretischen und ganzzahligen Problemen , Edited by: Collatz , L . 155 – 180 . Basle : Birkhäuser .
  • Neumann , K , Schwindt , C and Trautmann , N . 2002 . Advanced production scheduling for batch plants in process industries . OR Spectrum , 24 : S251 – S279 .
  • Neumann , K , Schwindt , C and Zimmermann , J . 2003 . Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Non-regular Objective Functions, , 2nd edn , Berlin : Springer .
  • Pantelides , CC . 1994 . “ Unified frameworks for optimal process planning and scheduling ” . In Foundations of Computer-aided Process Operations , Edited by: Rippin , DWT , Hale , JC and Davis , JF . 253 – 274 . Austin, TX : CACHE .
  • Pritsker , AAB , Watters , WD and Wolfe , PM . 1969 . Multiproject scheduling with limited resources: a zero-one programming approach . Manag. Sci. , 16 : 93 – 108 .
  • Rosling , K . 1986 . “ Optimal lot-sizing for dynamic assembly systems ” . In Multi-stage Productions Planning and Inventory Control , Edited by: Axsäter , S , Schneeweiss , D and Silver , EA . 119 – 131 . Berlin : Springer .
  • Salomon , M . 1991 . Deterministic Lotsizing Models for Production Planning , Berlin : Springer .
  • Schwindt , C and Trautmann , N . 2000 . Batch scheduling in process industries: an application of resource-constrained project scheduling . OR Spektrum , 22 : 501 – 524 .
  • Simpson , N and Erenguc , S . 1998 . Production Planning in Multiple Stage Manufacturing Environments with Joint Costs, Limited Resources and Set-up Times , Gainesville, FL : University of Florida . Technical Report
  • Stadtler , H and Kilger , C . 2005 . Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, , 3rd ed , Berlin : Springer .
  • Stadtler , H . 1996 . Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing . Eur. J. Oper. Res. , 94 : 561 – 581 .
  • Suerie , C . 2005b . Campaign planning in time-indexed model formulations . Int. J. Prod. Res. , 43 : 49 – 66 .
  • Suerie , C . 2005a . Time Continuity in Discrete Time Models. New Approaches for Production Planning in Process Industries , Berlin : Springer .
  • Suerie , C and Stadtler , H . 2003 . The capacitated lot-sizing problem with linked lot sizes . Man. Sci. , 49 : 1039 – 1054 .
  • Tempelmeier , H . 2003 . Material-Logistik, Modelle und Algorithmen für die Produktionsplanung und -steuerung und das Supply Chain Management, , 5th ed , Berlin : Springer .
  • Timpe , C . 2002 . Solving planning and scheduling problems with combined integer and constraint programming . OR Spectrum , 24 : 431 – 448 .
  • Trautmann , N . 2001 . Anlagenbelegungsplanung in der Prozessindustrie , Wiesbaden : Gabler .
  • Tukel , OI and Rom , WO . 1998 . “ Solving the bucketless-MRP problems using RCPSP methods ” . In Sixth International Workshop on Project Management and Scheduling , Edited by: Barbarosglu , G et al. 309 – 312 . Istanbul : Bogazici University . 7–9 July 1998

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.