925
Views
72
CrossRef citations to date
0
Altmetric
Original Articles

An integrated production and maintenance planning model with time windows and shortage cost

, &
Pages 2265-2283 | Received 22 Apr 2009, Accepted 04 Jan 2010, Published online: 04 May 2010

References

  • Absi , N and Kedad-Sidhoum , S . 2008 . The multi capacitated lot sizing problem with set up time and shortage costs . European Journal of Operational Research , 185 ( 3 ) : 1351 – 1374 .
  • Absi , N and Kedad-Sidhoum , S . 2009 . The multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages . European Journal of Operational Research , 36 ( 11 ) : 2926 – 2936 .
  • Aghezzaf , EH , Jamali , MA and Ait-Kadi , D . 2007 . An integrated production and preventive maintenance planning model . European Journal of Operational Research , 181 ( 2 ) : 676 – 685 .
  • Aghezzaf , EH and Najid , MN . 2008 . Integrated production and preventive maintenance in production systems subject to random failures . Information Science , 178 ( 17 ) : 3382 – 3392 .
  • Aksen , D , Altinkemer , K and Chand , S . 2003 . The single-item lot-sizing problem with immediate lost sales . European Journal of Operational Research , 147 ( 3 ) : 558 – 566 .
  • Bäackert , W and Rippin , D . 1985 . The determination of maintenance strategies for plants subject to breakdown . Computers and Chemical Engineering , 9 ( 2 ) : 113 – 126 .
  • Barany , I , Van Roy , TJ and Wolsey , LA . 1984 . Strong formulations for multi-item capacitated lot sizing . Management Science , 30 ( 10 ) : 1255 – 1261 .
  • Budai , G , Dekker , R and Nicolai , R . 2006 . A review of planning models for maintenance & production . Available from: http://en.scientificcommons.org/17697690
  • Cassady , RC , Pohl , E and Murdock , W . 2001 . Selective maintenance modelling for industrial systems . Journal of Quality in Maintenance Engineering , 7 ( 2 ) : 104 – 117 .
  • Charlot , E , Kenné , JP and Nadeau , S . 2007 . Optimal production, maintenance and lockout control policies in manufacturing systems . International Journal of Production Economics , 107 ( 2 ) : 435 – 450 .
  • Chelbi , A and Ait-Kadi , D . 2004 . Analysis of a production/inventory system with random failing production unit submitted to regular preventive maintenance . European Journal of Operational Research , 156 ( 3 ) : 712 – 718 .
  • Chung , K . 2003 . Approximations to production lot sizing with machine breakdowns . Computers & Operations Research , 30 ( 10 ) : 1499 – 1507 .
  • Dekker , R and Van Rijn , C . 1996 . Prompt a decision support system for opportunity based preventive maintenance . Reliability and Maintenance of Complex Systems , 154 : 530 – 549 .
  • Dhouib , K , Gharbi , A and Ayed , S . 2008 . Availability and throughput of unreliable, unbuffered production lines with non-homogeneous deterministic processing times . International Journal of Production Research , 46 ( 2 ) : 5651 – 5677 .
  • Diaby , M . 1992 . Capacitated lot-sizing and scheduling by Lagrangean relaxation . European Journal of Operational Research , 59 ( 3 ) : 444 – 458 .
  • Dijkstra , M . 1994 . Planning the size and organization of KLM's aircraft maintenance personnel . Interfaces , 24 ( 6 ) : 47 – 58 .
  • Eppen , GD and Martin , RK . 1987 . Solving multi-item capacitated lot sizing problems using variable redefinition . Operations Research , 35 ( 6 ) : 832 – 848 .
  • Gertsbakh , I . 2000 . Reliability theory with applications to preventive maintenance , Berlin : Springer .
  • Gharbi , A and Kenné , JP . 2005 . Maintenance scheduling and production control of multiple-machine manufacturing systems . Computers & Industrial Engineering , 48 ( 4 ) : 693 – 707 .
  • Groenevelt , H , Pintelon , L and Seidmann , A . 1992 . Production batching with machine breakdowns and safety stocks . Operations Research , 40 ( 5 ) : 959 – 971 .
  • Iravani , S and Duenyas , I . 2002 . Integrated maintenance and production control of a deteriorating production system . IIE Transactions , 34 ( 5 ) : 423 – 435 .
  • Karimi , B , Fatemi Ghomi , SMT and Wilson , JM . 2003 . The capacitated lot sizing problem: a review of models and algorithms . Omega , 31 ( 5 ) : 365 – 378 .
  • Karni , R and Roll , Y . 1982 . A heuristic algorithm for the multi-item lot sizing problem with cacapacity constraints . AIIE Transactions , 14 ( 4 ) : 249 – 259 .
  • Kenné , JP and Boukas , E . 2003 . Hierarchical control of production and maintenance rates in manufacturing systems . Journal of Quality in Maintenance Engineering , 9 ( 1 ) : 66 – 82 .
  • Kenné , JP and Gharbi , A . 2004 . Stochastic optimal production control problem with corrective maintenance . Computers & Industrial Engineering , 46 ( 4 ) : 865 – 875 .
  • Kirca , O and Kokten , M . 1994 . A new heuristic approach for the multi-item dynamic lot sizing problem . European Journal of Operational Research , 75 ( 2 ) : 332 – 341 .
  • Kyriakidis , EG and Dimitrakos , TD . 2006 . Optimal preventive maintenance of production system with an intermediate buffer . European Journal of Operational Research , 168 ( 1 ) : 86 – 99 .
  • Maes , J and Van Wassenhove , LN . 1988 . Multi-item single-level capacitated dynamic lot-sizing heuristics: a general review . Journal of the Operational Research Society , 39 ( 11 ) : 991 – 1004 .
  • Makis , V and Fung , J . 1995 . Optimal preventive replacement, lot sizing and inspection policy for a deteriorating production system . Journal of Quality in Maintenance Engineering , 1 ( 4 ) : 41 – 55 .
  • Marquez , AC , Gupta , JND and Heguedas , AS . 2003 . Maintenance policies for a production system with constrained production rate and buffer capacity . International Journal of Production Research , 41 ( 9 ) : 1909 – 1926 .
  • Radhoui , M , Rezg , N and Chelbi , A . 2009 . Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems . International Journal of Production Research , 47 ( 2 ) : 389 – 402 .
  • Rahim , M and Ben-Daya , M . 1998 . A generalized economic model for joint determination of production run, inspection schedule and control chart design . International Journal of Production Research , 36 ( 1 ) : 277 – 289 .
  • Rezg , N , Chelbi , A and Xie , X . 2005 . Modeling and optimizing a joint inventory control and preventive maintenance strategy for a randomly failing production unit: analytical and simulation approaches . International Journal of Computer Integrated Manufacturing , 18 ( 2 ) : 225 – 235 .
  • Rosheil , TD and Christy , DP . 1996 . Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level . International Journal of Production Research , 34 ( 2 ) : 421 – 446 .
  • Sandbothe , RA and Thompson , GL . 1990 . A forward algorithm for the capacitated lot size model with stockouts . Operations Research , 38 ( 3 ) : 474 – 486 .
  • Shenoy , D and Bhadury , B . 1993 . MRSRP—a tool for manpower resources and spares requirements planning . Computers and Industrial Engineering , 24 ( 3 ) : 421 – 439 .
  • Srinivasan , M and Lee , H . 1996 . Production-inventory systems with preventive maintenance . IIE Transactions , 28 ( 11 ) : 879 – 890 .
  • Thizy , JM and Van Wassenhove , LN . 1985 . Lagrangean relaxation for the multi-item capacitated lot-sizing problem: a heuristic implementation . IIE Transactions , 17 ( 4 ) : 308 – 313 .
  • Trigeiro , WW . 1989 . A simple heuristic for lot-sizing with setup times . Decision Science , 20 ( 2 ) : 294 – 303 .
  • Van der Duyn Schouten , F and Vanneste , S . 1995 . Maintenance optimization of a production system with buffer capacity . European Journal of Operational Research , 82 ( 2 ) : 323 – 338 .
  • Wang , H . 2002 . A survey of maintenance policies of deteriorating systems . European Journal of Operational Research , 139 ( 3 ) : 469 – 489 .
  • Weinstein , L and Chung , C . 1999 . Integrating maintenance and production decisions in a hierarchical production planning environment . Computers & Operations Research , 26 ( 10 ) : 1059 – 1074 .
  • Yan , S , Yang , T and Chen , H . 2004 . Airline short-term maintenance manpower supply planning . Transportation Research , 38 ( 9–10 ) : 615 – 642 .
  • Zequeira , RI , Prida , B and Valdes , JE . 2004 . Optimal buffer inventory and preventive maintenance for an imperfect production process . International Journal of Production Research , 42 ( 5 ) : 959 – 974 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.