458
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

An integrative heuristic method for detailed operations scheduling in assembly job shop systems

&
Pages 6089-6105 | Received 15 Apr 2010, Accepted 15 Sep 2010, Published online: 17 Jan 2011

References

  • Baker , KR . 1974 . Introduction to sequencing and scheduling , New York : John Wiley & Sons .
  • Carroll, D.C., 1965. Heuristics sequencing of single and multiple jobs. Dissertation (PhD). MIT, Cambridge, MA.
  • Choi , BK and You , NK . 2006 . Dispatching rules for dynamic scheduling of one-of-a-kind production . International Journal of Computer Integrated Manufacturing , 19 ( 4 ) : 383 – 392 .
  • Conway , RW , Maxwell , WL and Miller , LW . 1967 . Theory of scheduling , Reading, MA : Addison-Wesley Publishing .
  • Fry , TD . 1989 . The effects of product structure and sequencing rule on assembly shop performance . International Journal of Production Research , 27 ( 4 ) : 671 – 686 .
  • Goodwin , SJ and Weeks , J . 1986 . Evaluating scheduling policies in a multi-level assembly system . International Journal of Production Research , 24 ( 2 ) : 247 – 257 .
  • Hicks , C and Pongcharoen , P . 2006 . Dispatching rules for production scheduling in the capital goods industry . International Journal of Production Economics , 104 ( 1 ) : 154 – 163 .
  • Huang , P . 1984 . A comparative study of priority dispatching rules in a hybrid assembly/job shop . International Journal of Production Research , 22 ( 3 ) : 375 – 387 .
  • Kutanoglu , E and Sabuncuoglu , I . 2001 . Experimental investigation of iterative simulation-based scheduling in a dynamic and stochastic job shop . Journal of Manufacturing Systems , 20 ( 4 ) : 264 – 279 .
  • Lenstra , JK and Rinnooy Kan , AHG . 1978 . Computational complexity of scheduling under precedence constraints . Operations Research , 26 ( 1 ) : 22 – 35 .
  • Lu, H.L., Huang, G.Q., and Yang, H.D., 2010. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, DOI: 10.1080/00207540903524490. [In press].
  • Maxwell , WL and Mehra , M . 1968 . Multiple-factor rules for sequencing with assembly constraints . Naval Research Logistics Quarterly , 15 ( 2 ) : 241 – 254 .
  • Maxwell, W.L., 1969. Priority dispatching and assembly operations in a job shop. Technical report RM-5370-PR. Rand Corporation, Santa Monica.
  • Mohanasundaram , KM . 2002 . Scheduling rules for dynamic shops that manufacture multi-level jobs . Computers and Industrial Engineering , 44 ( 1 ) : 119 – 131 .
  • Natarajan , K . 2007 . Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness . International Journal of Advanced Manufacturing Technology , 31 ( 7–8 ) : 751 – 761 .
  • Philipoom , PR , Russell , RS and Fry , TD . 1991 . A preliminary investigation of multiple-attribute based sequencing rules for assembly shops . International Journal of Production Research , 29 ( 4 ) : 739 – 753 .
  • Reeja , MK and Rajendran , C . 2000a . Dispatching rules for scheduling in assembly job shops – part I . International Journal of Production Research , 38 ( 9 ) : 2051 – 2066 .
  • Reeja , MK and Rajendran , C . 2000b . Dispatching rules for scheduling in assembly job shops – part II . International Journal of Production Research , 38 ( 10 ) : 2349 – 2360 .
  • Russell , RS and Taylor , BW . 1985 . An evaluation of scheduling policies in a dual resource constrained assembly shop . IIE Transactions , 17 ( 3 ) : 219 – 232 .
  • Thiagarajan , S and Rajendran , C . 2003 . Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs . International Journal of Production Research , 41 ( 18 ) : 4453 – 4486 .
  • Thiagarajan , S and Rajendran , C . 2005 . Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs . Computers and Industrial Engineering , 49 ( 4 ) : 463 – 503 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.