630
Views
29
CrossRef citations to date
0
Altmetric
Original Articles

A genetic algorithm approach for production scheduling with mould maintenance consideration

, &
Pages 5683-5697 | Received 17 Dec 2010, Accepted 05 Aug 2011, Published online: 02 Nov 2011

References

  • Balin , S . 2011 . Non-identical parallel machine scheduling using genetic algorithm . Expert Systems with Applications , 38 ( 6 ) : 6814 – 6821 .
  • Barlow , RE and Proshan , F . 1965 . Mathematical theory of reliability , New York : John Wiley & Sons .
  • Barlow , RE and Proshan , F . 1975 . Statistical theory of reliability and life testing , New York : Holt, Rinehart & Winston .
  • Benbouzid , F . Varnier, C., and Zerhouni, N., 2003. Resolution of joint maintenance/production scheduling by sequential and integrated strategies. In: 7th international work conference on artificial and natural neural networks (IWANN2003), 3–6 June, Spain, LNCS, 782–789.
  • Chan , TS . 2006 . Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach . Robotics and Computer Integrated Manufacturing , 22 ( 5–6 ) : 493 – 504 .
  • Chen , IJ and Chung , CH . 1991 . Effect of loading and routeing decisions on performance of flexible manufacturing systems . International Journal of Production Research , 29 ( 11 ) : 2209 – 2225 .
  • Cheng , TCE . Yang, S.J., and Yang, D.L, 2010. Common due-window assignment and scheduling of linear time-dependent deteriorating jobs and a deteriorating maintenance activity. International Journal of Production Economics. In Press, Corrected Proof, Available online 20 October 2010
  • Chung , SH . 2009 . Optimisation of system reliability in multi-factory production networks by maintenance approach . Expert Systems with Applications , 36 ( 6 ) : 10188 – 10196 .
  • de Werra , D and Widmer , M . 1991 . Loading problems with tool management in flexible manufacturing systems: a few integer programming models . International Journal of Flexible Manufacturing Systems , 3 ( 1 ) : 71 – 82 .
  • Elsayed , EA and Dhillon , BS . 1979 . Repairable systems with one standby unit . Microelectronics and Reliability , 19 ( 3 ) : 243 – 246 .
  • Guinet , A . 1993 . Scheduling sequence-dependent jobs on identical parallel machines to minimise completion time criteria . International Journal of Production Research , 31 ( 7 ) : 1579 – 1594 .
  • Gunasekaran , A , Martikainen , T and Yli-Olli , P . 1993 . Flexible manufacturing system: an investigation for research and applications . European Journal of Operational Research , 66 ( 1 ) : 1 – 26 .
  • Jardine , AKS and Buzacott , JA . 1985 . Equipment reliability and maintenance . European Journal of Operational Research , 19 ( 3 ) : 285 – 296 .
  • Ji , M , He , Y and Cheng , TCE . 2007 . Single-machine scheduling with periodic maintenance to minimise makespan . Computers and Operations Research , 34 ( 6 ) : 1764 – 1770 .
  • Lamber , BK , Walvekar , AG and Hirmas , JP . 1971 . Optimal redundancy and availability allocation in multistage systems . IEEE Transaction on Reliability , 20 ( 3 ) : 182 – 185 .
  • Lamptey , G , Labi , S and Li , Z . 2008 . Decision support for optimal scheduling of highway pavement preventive maintenance within resurfacing cycle . Decision Support System , 46 ( 1 ) : 376 – 387 .
  • Lee , C and Chen , Z . 2000 . Scheduling jobs and maintenance activities on parallel machines . Naval Research Logistics , 47 ( 2 ) : 145 – 165 .
  • Liao , CJ , Shyur , DL and Lin , CH . 2005 . Makespan minimisation for two parallel machines with an availability constraint . European Journal of Operational Research , 160 ( 2 ) : 445 – 456 .
  • Liao , CJ , Shyur , DL and Lin , CH . 2007 . Minimising makespan for two parallel machines with job limit on each availability interval . Journal of the Operational Research Society , 58 ( 7 ) : 938 – 947 .
  • Lu , KY and Sy , CC . 2008 . A real-time decision-making of maintenance using fuzzy agent . Expert Systems with Applications , 36 ( 2 ) : 2691 – 2698 .
  • Mellouli , R . 2006. Scheduling on parallel machines with availability constraints. In: 6th international Francophone conference of modeling and simulation (Mosim’06), Morocco (in French)
  • Menges , G , Michaeli , W and Mohren , P . 2001 . How to make injection moulds , 3rd , Munich : Hanser Publishers .
  • Mosheiov , G and Sidney , JB . 2010 . Scheduling a deteriorating maintenance activity on a single machine . Journal of the Operational Research Society , 61 ( 5 ) : 882 – 887 .
  • Nikolopoulos , K . 2003 . Integrating industrial maintenance strategy into ERP . Industrial Management & Data Systems , 103 ( 3 ) : 184 – 191 .
  • Papakostas , N . 2010 . An approach to operational aircraft maintenance planning . Decision Support Systems , 48 ( 4 ) : 604 – 612 .
  • Pierskalla , WP and Voelker , JA . 1976 . A survey of maintenance models: the control and surveillance of deteriorating systems . Naval Research Logistics Quarterly , 23 ( 1 ) : 353 – 388 .
  • Prakash , A , Chan , FTS and Deshmukh , SG . 2011 . FMS scheduling with knowledge based genetic algorithm approach . Expert Systems with Applications , 38 ( 4 ) : 3161 – 3171 .
  • Qi , X , Chen , T and Tu , F . 1999 . Scheduling the maintenance on single machine . Journal of the Operational Research Society , 50 ( 10 ) : 1071 – 1078 .
  • Rajkumar , M , Asokan , P and Vamsikrishna , V . 2010 . A GRASP algorithm for flexible job-shop scheduling with maintenance constraints . International Journal of Production Research , 48 ( 22 ) : 6821 – 6836 .
  • Rishel , TD and Christy , DP . 1996 . Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level . International Journal of Production Research , 34 ( 2 ) : 421 – 446 .
  • Rosato , DV , Rosato , DV and Rosato , MG . 2000 . Injection moulding handbook , Boston : Kluwer Academic Publishers .
  • Rosato , DV , Rosato , DV and Rosato , MV . 2004 . Plastic product material and process selection handbook , New York : Elsevier Advanced Technology .
  • Sherif , YS and Smith , ML . 1981 . Optimal maintenance models for systems subject to failure – A review . Naval Research Logistics Quarterly , 28 ( 1 ) : 47 – 74 .
  • Stecke , KE . 1992 . Planning and scheduling approaches to operate a particular FMS . European Journal of Operational Research , 61 ( 3 ) : 273 – 291 .
  • Sun , K and Li , H . 2010 . Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines . International Journal of Production Economics , 124 ( 1 ) : 151 – 158 .
  • Turkcan , A , Akturk , MS and Storer , RH . 2007 . Due date and cost-based FMS loading, scheduling and tool management . International Journal of Production Research , 45 ( 5 ) : 1183 – 1213 .
  • Valdez-Flores , C and Feldman , RM . 1989 . A survey of preventive maintenance models for stochastically deteriorating single-unit systems . Naval Research Logistics , 36 ( 4 ) : 419 – 446 .
  • Vallada , E and Ruiz , R . 2011 . A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times . European Journal of Operational Research , 211 ( 3 ) : 612 – 622 .
  • Veeramani , D , Upon , DM and Barash , MM . 1992 . Cutting-tool management in computer-integrated manufacturing . International Journal of Flexible Manufacturing Systems , 4 ( 3 ) : 237 – 265 .
  • Wang , H . 2002 . A survey of maintenance policies of deteriorating systems . European Journal of Operational Research , 139 ( 3 ) : 469 – 489 .
  • Xu , DH , Sun , KB and Li , HX . 2008 . Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimise makespan . Computers and Operations Research , 35 ( 4 ) : 1344 – 1349 .
  • Zeballos , LJ . 2010 . A constraint programming approach to tool allocation and production scheduling in flexible manufacturing systems . Robotics and Computer-Integrated Manufacturing , 26 ( 6 ) : 725 – 743 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.