Operations scheduling with multiple resources and transportation considerations

, , &
Pages 7071-7090 | Received 19 Feb 2013, Accepted 20 Feb 2013, Published online: 25 Jun 2013

References

  • Afshar, A., and A. Haghani. 2012. “Modeling Integrated Supply Chain Logistics in Real-time Large-scale Disaster Relief Operations.” Socio-Economic Planning Sciences 46 (4): 327–338.
  • Ahuja, R. K., K. Mehlhorn, J. Orlin, and R. E. Tarjan. 1990. “Faster Algorithms for the Shortest Path Problem.” Journal of the ACM 37(2): 213–223.
  • Ait-Kadia, D., J.-B. Menye, and H. Kane. 2011. “Resources Assignment Model in Maintenance Activities Scheduling.” International Journal of Production Research 49(22): 6677–6689.
  • Alfieri, A., and P. Brandimarte. 1997. “Job Shop Scheduling with Delay-Renewable Resources: A Comparison of Decomposition Strategies.” International Journal of Production Research 35(7): 1807–1823.
  • Assaf, S. A., and S. Al-Hejji. 2006. “Causes of Delay in Large Construction Projects.” International Journal of Project Management 24(4): 349–357.
  • Bachlaus, M., M. K. Tiwarib, and F. T. S. Chan. 2009. “Multi-objective Resource Assignment Problem in a Product-Driven Supply Chain Using a Taguchi-based DNA Algorithm.” International Journal of Production Research 47(9): 2345–2371.
  • Balcik, B., and B. M. Beamon. 2008. “Facility Location in Humanitarian Relief.” International Journal of Logistics: Research and Applications 11(2): 101–121.
  • Balcik, B., B. M. Beamon, and K. Smilowitz. 2008. “Last Mile Distribution in Humanitarian Relief.” Journal of Intelligent Transportation Systems 12(2): 51–63.
  • Balcik, B., B. M. Beamon, C. C. Krejci, K. M. Muramatsu, and M. Ramirez. 2010. “Coordination in Humanitarian Relief Chains: Practices, Challenges and Opportunities.” International Journal of Production Economics 126(1): 22–34.
  • Ballestin, F., and N. Trautmann. 2008. “An Iterated-local-search Heuristic for the Resource-constrained Weighted Earliness-Tardiness Project Scheduling Problem.” International Journal of Production Research 46(22): 6231–6249.
  • Bottcher, J., A. Drexl, R. Kolisch, and F. Salewski. 1999. “Project Scheduling under Partially Renewable Resource Constraints.” Management Science 45(4): 543–559.
  • Brenner, U. 2008. “A Faster Polynomial Algorithm for the Unbalanced Hitchcock Transportation Problem.” Operations Research Letters 36(4): 408–413.
  • Brucker, P., and A. Kramer. 1996. “Polynomial Algorithms for Resource-constrained and Multiprocessor Task Scheduling Problems.” European Journal of Operational Research 90(2): 214–226.
  • Brucker, P., A. Drexl, R. Möhring, K. Neumann, and E. Pesch. 1999. “Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods.” European Journal of Operational Research 112(1): 3–41.
  • Campbell, A. M., D. Vandenbussche, and W. Hermann. 2008. “Routing for Relief Efforts.” Transportation Science 42(2): 127–145.
  • Can, A., and G. Ulusoy. 2010. Multi-Project Scheduling with 2-Stage Decomposition. Technical Report. Sabanci University. ID:SU_FENS_2011/0010.
  • Caunhye, A., X. Nie, and S. Pokharel. 2012. “Optimization Models in Emergency Logistics: A Literature Review.” Socio-Economic Planning Sciences 46(1): 4–13.
  • Celano, G., A. Costa, and S. Fichera. 2008. “Scheduling of Unrelated Parallel Manufacturing Cells with Limited Human Resources.” International Journal of Production Research 46(2): 405–427.
  • Chan, F. T. S., T. C. Wong, and L. Y. Chan. 2006. “Flexible Job-shop Scheduling Problem under Resource Constraints.” International Journal of Production Research 44(11): 2071–2089.
  • Changfeng, Y., Z. Dinghua, P. Wenli, and B. Kun. 2006. “Research on Resources Optimization Deployment Model and Algorithm for Collaborative Manufacturing Process.” International Journal of Production Research 44(16): 3279–3301.
  • Debels, D., and M. Vanhoucke. 2007. “A Decomposition-based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem.” Operations Research 55(3): 457–469.
  • Deblaere, F., E. Demeulemeester, W. Herroelen, and S. Van de Vonder. 2007. “Robust Resource Allocation Decisions in Resource-Constrained Projects.” Decision Sciences 38(1): 5–37.
  • Deblaere, F., E. Demeulemeester, and W. Herroelen. 2011a. “Reactive Scheduling in the Multi-Mode RCPSP.” Computers and Operations Research 38(1): 63–74.
  • Deblaere, F., E. Demeulemeester, and W. Herroelen. 2011b. “Proactive Policies for the Stochastic Resource-Constrained Project Scheduling Problem.” European Journal of Operational Research 214(2): 308–316.
  • Depuy, G. W., and G. E. Whitehouse. 2001. “A Simple and Effective Heuristic for the Resource Constrained Project-Scheduling Problem.” International Journal of Production Research 39(14): 3275–3287.
  • Eckstein, A. L. H., and T. R. Rohleder. 1998. “Incorporating Human Resources in Group Technology/Cellular Manufacturing.” International Journal of Production Research 36(5): 1199–1222.
  • Fenton, G. 2003. “Coordination in the Great Lakes.” Forced Migration Review, September, 23–24.
  • Gagnon, M., G. D’Avignona, and F. Boctor. 2009. An Algorithm for the MRCPS Problem with Renewal and Non-Renewal Resource Types. Quebec: Faculty of Business Administration, Laval University.
  • Haghani, A., and S. C. Oh. 1996. “Formulation and Solution of a Multi-commodity, Multi-modal Network Flow Model for Disaster Relief Operations.” Transportation Research Part A: Policy and Practice 30(3): 231–250.
  • Hartmann, S., and D. Briskorn. 2010. “A Survey of Variants and Extensions of the Resource-Constrained Project Scheduling Problem.” European Journal of Operational Research 207(1): 1–14.
  • Huang, M., K. Smilowitz, and B. Balcik. 2012. “Models for Relief Routing: Equity, Efficiency and Efficacy.” Transportation Research Part E 48(1): 2–18.
  • Hwang, N.-C., and K. Kogan. 2003. “Dynamic Approach to Human Resources Planning for Major Professional Companies with a Peak-Wise Demand.” International Journal of Production Research 41(6): 1255–1271.
  • Karsu, O., and M. Azizoglu. 2012. “The Multi-Resource Agent Bottleneck Generalized Assignment Problem.” International Journal of Production Research 50(2): 309–324.
  • Klein, R. 2000. “Project Scheduling with Time-varying Resource Constraints.” International Journal of Production Research 38(16): 3937–3952.
  • Lee, C.-Y., and L. Lei. 2001. “Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases.” Annals of Operations Research 102(1–4): 287–307.
  • Lee, Y. H., and M. Pinedo. 1997. “Scheduling Jobs on Parallel Machines with Sequence Dependent Setup Times.” European Journal of Operational Research 100(3): 464–474.
  • Leus, R., and W. Herroelen. 2004. “Stability and Resource Allocation in Project Planning.” IIE Transactions 36(7): 667–682.
  • Mazzola, J., and A. Neebe. 1986. “Resource-Constrained Assignment Scheduling.” Operations Research 34(4): 560–572.
  • Mingozzi, A., M. A. Boschetti, S. Ricciardelli, and L. Bianco. 1999. “A Set Partitioning Approach to the Crew-Scheduling Problem.” Operations Research 47(6): 873–888.
  • Mokhtari, H., I. N. K. Abadia, and A. Cheraghalikhani. 2011. “A Multi-Objective Flow Shop Scheduling with Resource-Dependent Processing Times: Trade-Off between Makespan and Cost of Resources.” International Journal of Production Research 49(19): 5851–5875.
  • Moon, C., J. S. Kim, and M. Gen. 2004. “Advanced Planning and Scheduling Based on Precedence and Resource Constraints for E-Plant Chains.” International Journal of Production Research 42(15): 2941–2955.
  • Munkres, J. 1957. “Algorithms for the Assignment and Transportation Problems.” Journal of the Society of Industrial and Applied Mathematics 5(1): 32–38.
  • Nolz, P. C., F. Semet, and K. F. Doerner. 2011. “Risk Approaches for Delivering Disaster Relief Supplies.” OR Spectrum 33(3): 543–569.
  • Nudtasomboon, N., and S. Randhawa. 1997. “Resource-Constrained Project Scheduling with Renewable and Non-Renewable Resources and Time-Resource Tradeoffs.” Computers & Industrial Engineering 32(1): 227–242.
  • Onwubolu, G. C., and M. Mutingi. 2001. “Optimizing the Multiple Constrained Resources Product Mix Problem Using Genetic Algorithms.” International Journal of Production Research 39(9): 1897–1910.
  • Ozdamar, L., E. Ekinci, and B. Kucukyazici. 2004. “Emergency Logistics Planning in Natural Disasters.” Annals of Operations Research 129(1–4): 217–245.
  • Rajkumar, M., P. Asokan, N. Anilkumar, and T. Page. 2011. “A GRASP Algorithm for Flexible Job-Shop Scheduling Problem with Limited Resource Constraints.” International Journal of Production Research 49(8): 2409–2423.
  • Ranjbar, M., B. D. Reyck, and F. Kianfar. 2009. “A Hybrid Scatter Search for the Discrete Time/Resource Trade-Off Problem in Project Scheduling.” European Journal of Operational Research 193(1): 35–48.
  • Robinson, K. R., and S. A. Moses. 2006. “Effect of Granularity of Resource Availability on the Accuracy of Due Date Assignment.” International Journal of Production Research 44(24): 5391–5414.
  • Schirmer, A. 2001. “Resource-Constrained Project Scheduling: An Evaluation of Adaptive Control Schemes for Parameterized Sampling Heuristics.” International Journal of Production Research 39(7): 1343–1365.
  • Sheu, J.-B. 2007. “A Coordinated Reverse Logistics System for Regional Management of Multi-Source Hazardous Wastes.” Computers & Operations Research 34(5): 1442–1462.
  • Sheu, C., L. J. Krajewski, and G. Cai. 2012. “A Heuristic for Designing Manufacturing Focus Units with Resource Considerations.” International Journal of Production Research 50(6): 1608–1623.
  • Simons Jr, J. V., M. D. Stephens, and W. P. Simpson III. 1999. “Simultaneous versus Sequential Scheduling of Multiple Resources Which Constrain System Throughput.” International Journal of Production Research 37(1): 21–33.
  • Tormos, P., and A. Lova. 2003. “An Efficient Multi-Pass Heuristic for Project Scheduling with Constrained Resources.” International Journal of Production Research 41(5): 1071–1086.
  • Van de Vonder, S., E. Demeulemeester, W. Herroelen, and R. Leus. 2006. “The Trade-Off between Stability and Makespan in Resource-Constrained Project Scheduling.” International Journal of Production Research 44(2): 215–236.
  • Vanhoucke, M., E. Demeulemeester, and W. Herroelen. 2001a. “An Exact Procedure for the Resource-Constrained Weighted Earliness–Tardiness Project Scheduling Problem.” Annals of Operations Research 102(1–4): 179–196.
  • Vanhoucke, M., E. Demeulemeester, and W. Herroelen. 2001b. “On Maximizing the Net Present Value of a Project under Renewable Resource Constraints.” Management Science 47(8): 1113–1121.
  • Wong, C. S., F. T. S. Chan, and S. H. Chung. 2012. “A Joint Production Scheduling Approach Considering Multiple Resources and Preventive Maintenance Tasks.” International Journal of Production Research 51 (3): 883–896.
  • Wright, P., M. Liberatore, and R. Nydick. 2006. “A Survey of Operations Research Models and Applications in Homeland Security.” Interfaces 36(6): 514–529.
  • Yi, W., and A. Kumar. 2007. “Ant Colony Optimization for Disaster Relief Operations.” Transportation Research Part E: Logistics and Transportation Review 43(6): 660–672.
  • Yuan, Y., and D. Wang. 2009. “Path Selection Model and Algorithm for Emergency Logistics Management.” Computers & Industrial Engineering 56(3): 1081–1094.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.