1,190
Views
83
CrossRef citations to date
0
Altmetric
Articles

Reduction of power consumption and carbon footprints by applying multi-objective optimisation via genetic algorithms

&
Pages 337-352 | Received 24 May 2012, Accepted 26 Jun 2013, Published online: 12 Aug 2013

References

  • Arbiza, M. J., A. Bonfill, G. Guillén, F. D. Mele, A. Espuña, and L. Puigjaner. 2008. “Metaheuristic Multiobjective Optimisation Approach for the Scheduling of Multiproduct Batch Chemical Plants.” Journal of Cleaner Production 16(2): 233–244.
  • Brucker, P., A. Gladky, J. A. Hoogeveen, M. Y. Kovalyov, C. N. Potts, T. Tautenhahn, and S. L. van de Velde. 1998. “Scheduling a Batching Machine.” Journal of Scheduling 1(1): 31–54.
  • Chan, S.-H., T. W. Lam, and L.-K. Lee. 2011. “Scheduling for Weighted Flow Time and Energy with Rejection Penalty.” In: Proceedings of the 28th International Symposium on Theoretical Aspects of Computer Science (STACS), 392–403.
  • Deb, K. 2000. “An Efficient Constraint Handling Method for Genetic Algorithms.” Computer Methods in Applied Mechanics and Engineering 186(2–4): 311–338.
  • Deb, K., A. Pratap, S. Agarwal, and T. Meyarivan. 2002. “A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II.” IEEE Transactions on Evolutionary Computation 6(2): 182–197.
  • Drake, R., M. B. Yildirim, J. Twomey, L. Whitman, J. Ahmad, and P. Lodhia. 2006. “Data collection Framework on Energy Consumption in Manufacturing.” In: Proceedings of the Industrial Engineering Research Conference, Orlando, FL, May 15–19, 2006.
  • Fang, K., N. Uhan, F. Zhao, and J. W. Sutherland. 2011a. “A New Approach to Scheduling in Manufacturing for Power Consumption and Carbon Footprint Reduction.” Journal of Manufacturing Systems 30(4): 234–240.
  • Fang, K., N. Uhan, F. Zhao, and J. W. Sutherland. 2011b. “A New Shop Scheduling Approach in Support of Sustainable Manufacturing.” Glocalized Solutions for Sustainability in Manufacturing. 305–310 . http://www.link.springer.com/chapter/10.1007%2F978-3-642-19692-8_53#.
  • Graham, R., E. Lawler, J. Lenstra, and A. Kan. 1979. “Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey.” Annals of Discrete Mathematics 5(2): 287–326.
  • Grau, R., A. Espuña, and L. Puigjaner. 1994. “Focusing in By-product Recovery and Waste Minimization in Batch Production Scheduling.” Computers & Chemical Engineering 18(1): S271–S275.
  • Gutowski, T. C., C. Murphy, D. Allen, D. Bauer, B. Bras, T. Piwonka, P. Sheng, J. Sutherland, D. Thurston, and E. Wolff. 2005. “Environmentally Benign Manufacturing: Observations from Japan, Europe and the United States.” Journal of Cleaner Production 13(1): 1–17.
  • He, Y., and F. Liu. 2010. “Methods for Integrating Energy Consumption and Environmental Impact Considerations into the Production Operation of Machining Processes.” Chinese Journal of Mechanical Engineering 23(4): 428–435.
  • Hoogeveen, H. 2005. “Multicriteria Scheduling.” European Journal of Operational Research 167(3): 592–623.
  • International Energy Agency (IEA). 2008. “World Energy Outlook 2008.” http://www.worldenergyoutlook.org/media/weowebsite/2008-1994/WEO2008.pdf
  • Kalinina, M., A. Larsson, and L. Olsson. 2013. “Easy-interactive Ordering of The Pareto Optimal Set with Imprecise Weights.” World Academy of Science, Engineering and Technology: An International Journal of Science, Engineering and Technology 76: 643–648.
  • Krikke, H. 2011. “Impact of Closed-loop Network Configurations on Carbon Footprints: A Case Study in Copiers.” Resources, Conservation and Recycling 55(12): 1196–1205.
  • Lee, K.-H. 2011. “Integrating Carbon Footprint into Supply Chain Management: The Case of Hyundai Motor Company (HMC) in the Automobile Industry.” Journal of Cleaner Production 19(11): 1216–1223.
  • Li, J.-Q., and K. Larry Head. 2009. “Sustainability Provisions in the Bus-scheduling Problem.” Transportation Research Part D: Transport and Environment 14(1): 50–60.
  • Liu, X., F. Zou, and X. Zhang, 2008. “Mathematical Model and Genetic Optimization for Hybrid Flow Shop Scheduling Problem Based on Energy Consumption.” In: Proceedings of the 2008 IEEE Control and Decision Conference (CCDC), 1002–1007.
  • Mathirajan, M., and M. Vimalarani. 2012. “Minimizing Total Weighted Tardiness on a bpm with Incompatible Job-families and Dynamic Job-arrivals.” In: Proceedings of the 23rd Annual POM Conference, Chicago, Illinois, USA.
  • Mativenga, P. T., and M. F. Rajemi. 2011. “Calculation of Optimum Cutting Parameters Based on Minimum Energy Footprint.” CIRP Annals-Manufacturing Technology 60(1): 149–152.
  • Mouzon, G., and M. B. Yildirim. 2008. “A Framework to Minimise Total Energy Consumption and Total Tardiness on a Single Machine.” International Journal of Sustainable Engineering 1(2): 105–116.
  • Mouzon, G., M. B. Yildirim, and J. Twomey. 2007. “Operational Methods for Minimization of Energy Consumption of Manufacturing Equipment.” International Journal of Production Research 45(18–19): 4247–4271.
  • Stefanis, S. K., A. G. Livingston, and E. N. Pistikopoulos. 1997. “Environmental Impact Considerations in the Optimal Design and Scheduling of Batch Processes.” Computers & Chemical Engineering 21(10): 1073–1201.
  • U.S. Energy Information Administration, 2009. International Energy, Outlook 2009, No. DOE/EIA-0484(2009).
  • Zhihuan, L., L. Yinhong, and D. Xianzhong. 2010. “Non-dominated Sorting Genetic Algorithm-II for Robust Multi-objective Optimal Reactive Power Dispatch.” IET Generation, Transmission & Distribution 4(9): 1000–1008.
  • Zitzler, E. 1999. “Evolutionary Algorithms for Multiobjective Optimization: Methods and Applications.” PhD Thesis. Swiss Federal Institute of Technology (ETH), Zurich, Switzerland.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.