485
Views
10
CrossRef citations to date
0
Altmetric
Articles

Convex optimisation for aggregate production planning

Pages 1050-1058 | Received 24 Oct 2011, Accepted 29 Jul 2013, Published online: 28 Aug 2013

References

  • Achary, K. K., and K. K. Geetha. 2007. “On Solving Multi-item Inventory Model Using GLD Approximation.” Information and Management Sciences 18(2): 147–156.
  • Akartunali, K., and A. J. Miller. 2009. “A Heuristic Approach for Big Bucket Multi-level Production Planning Problems.” European Journal of Operational Research 193: 396–411.
  • Anthony, R. N. 1965. Planning and Control Systems: A Framework for Analysis. Boston, MA: Harvard University, Graduate School of Business Administration.
  • Baykasoglu, A., and T. Gocken. 2010. “Multi-objective Aggregate Production Planning with Fuzzy Parameters.” Advances in Engineering Software 41: 1124–1131.
  • Benson, H. P. 1995. Concave Minimization: Theory, Applications and Algorithms. Dordrecht: Kluwer Academic.
  • Bergstrom, G. L., and B. E. Smith. 1970. “Multi-item Production Planning – An Extension of the HMMS Rules.” Management Science 16: 614–629.
  • Bowman, E. H. 1956. “Production Scheduling by the Transportation Method of Linear Programming.” Operations Research 4: 100–103.
  • Bowman, E. H. 1963. “Consistency and Optimality in Managerial Decision Making.” Management Science 9: 310–321.
  • Boyd, S., and L. Vandenberghe. 2004. Convex Optimization. Cambridge: Cambridge University Press.
  • Chen, S. P., and W. L. Huang. 2010. “A Membership Function Approach for Aggregate Production Planning Problems in Fuzzy Environments.” International Journal of Production Research 48(23): 7003–7023.
  • Devyaterikova, M. V., A. A. Kolokolov, and A. P. Kolosov. 2009. “L-class Enumeration Algorithms for a Discrete Production Planning Problem with Interval Resource Quantities.” Computers & Operations Research 36: 316–324.
  • Dur, M., R. Horst, and M. Locatelli. 1998. “Necessary and Sufficient Global Optimality Conditions for Convex Maximization Revisited.” Journal of Mathematical Analysis and Applications 217: 637–649.
  • Garcia-Sabater, J. P., J. Maheut, and J. J. Garcia-Sabater. 2009. “A Decision Support System for Aggregate Production Planning Based on MILP: A Case Study from the Automotive Industry.” In International Conference on Computers & Industrial Engineering, Troyes, France, 366–371.
  • Ghate, A., and R. Smith. 2009. “Optimal Backlogging over an Infinite Horizon under Time Varying Convex Production and Inventory Costs.” Manufacturing and Service Operations Management 11: 362–368.
  • Gicquel, C., M. Minoux, and Y. Dallery. 2011. “Exact Solution Approaches for the Discrete Lot-sizing and Scheduling Problem with Parallel Resources.” International Journal of Production Research 49(9): 2587–2603.
  • Goodman, D. A. 1974. “A Goal Programming Approach to Aggregate Planning of Production and Work Force.” Management Science 20: 1569–1575.
  • Groff, G. K., and G. F. Muth. 1972. Operations Management: Analysis for Decisions. Homewood, AL: Irwin.
  • Hanssmann, F., and S. W. Hess. 1960. “A Linear Programming Approach to Production and Employment Scheduling.” Management Technology 1: 46–54.
  • Holt, C. C., F. Modigliani, and H. A. Simon. 1955. “A Linear Decision Rule for Production and Employment Scheduling.” Management Science 2: 1–30.
  • Hopp, W. J., and M. L. Spearman. 2008. Factory Physics. 3rd ed. Chicago, IL: McGraw-Hill Irwin.
  • Horst, R., P. M. Pardalos, and N. Van Thoai. 1995. Introduction to Global Optimization. Dordrecht: Kluwer Academic.
  • Jones, C. H. 1967. “Parametric Production Planning.” Management Science 13(11): 843–866.
  • Kang, S. G., and S. H. Choi. 2011. “Multi-agent Based Beam Search for Intelligent Production Planning and Scheduling.” International Journal of Production Research 48(11): 3319–3353.
  • Kazemi Zanjani, M., M. Nourelfath, and D. Ait-Kadi. 2010. “A Multi-stage Stochastic Programming Approach for Production Planning with Uncertainty in the Quality of Raw Materials and Demand.” International Journal of Production Research 48(16): 4701–4723.
  • Kempf, K. G., P. Keskinocak, and R. Uzsoy. 2011. Planning Production and Inventories in the Extended Enterprise. New York: Springer.
  • Lanzanuer, V. 1970. “Production and Employment Scheduling in Multi-stage Production Systems.” Naval Research Logistics Quarterly 17: 193–198.
  • Li, C., F. Liu, H. Cao, and Q. Wang. 2009. “A Stochastic Dynamic Programming Based Model for Uncertain Production Planning of Re-manufacturing System.” International Journal of Production Research 47(13): 3657–3668.
  • Li, H., and J. Meissner. 2011. “Capacitated Dynamic Lot Sizing with Capacity Acquisition.” International Journal of Production Research 49(16): 4945–4963.
  • Manne, A. S. 1958. “Programming of Economic Lot Sizes.” Management Science 4: 115–135.
  • Meij, J. T. 1980. “Separable Programming as a Solution Methodology for Aggregate Production Planning.” International Journal of Production Research 18(2): 233–243.
  • Modigliani, F., and F. E. Hohn. 1955. “Production Planning over Time and the Nature of the Expectation and Planning Horizon.” Econometrica 23: 46–66.
  • Nam, S. J., and R. Logendran. 1992. “Aggregate Production Planning – A Survey of Models and Methodologies.” European Journal of Operational Research 61: 255–272.
  • Orr, D. 1962. “A Random Walk Production-inventory Policy.” Management Science 9: 108–122.
  • Piper, C. J., and S. Vachon. 2001. “Accounting for Productivity Losses in Aggregate Planning.” International Journal of Production Research 39: 4001–4012.
  • Shim, J. P., M. Warkentin, J. F. Courtney, D. J. Power, R. Sharda, and C. Carlsson. 2002. “Past, Present, and Future of Decision Support Technology.” Decision Support Systems 33: 111–126.
  • Silva, C. J., J. Figueira, J. Lisboa, and S. Barman. 2006. “An Interactive Decision Support Systems for an Aggregate Production Planning Model Based on Multicriteria Mixed Integer Linear Programming.” OMEGA 34: 167–177.
  • Singhal, J., and K. Singhal. 1996. “Alternate Approaches to Solving the Holt et al. Model and to Performing Sensitivity Analysis.” European Journal of Operational Research 91: 89–98.
  • Strekalovsky, A. S. 1993. “The Search for a Global Maximum of a Convex Functional on an Admissible Set.” Computational Mathematics and Mathematical Physics 33: 315–328.
  • Taubert, W. H. 1968. “A Search Decision Rule for the Aggregate Scheduling Pattern.” Management Science 14: B343–B359.
  • Veinott, A. F. 1964. “Production Planning with Convex Costs: A Parametric Study.” Management Science 10: 441–460.
  • Vergin, R. C. 1966. “Production Scheduling under Seasonal Demand.” Journal of Industrial Engineering 17: 260–266.
  • Vollmann, T. E., W. L. Berry, and D. C. Whybark. 1997. Manufacturing Planning and Control Systems. 4th ed. New York: McGraw-Hill.
  • Zhang, X., M. Prajapati, and E. Peden. 2011. “A Stochastic Production Planning Model under Uncertain Seasonal Demand and Market Growth.” International Journal of Production Research 49(7): 1957–1975.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.