496
Views
15
CrossRef citations to date
0
Altmetric
Articles

Logical reconfiguration of reconfigurable manufacturing systems with stream of variations modelling: a stochastic two-stage programming and shortest path model

, &
Pages 1401-1418 | Received 18 Nov 2011, Accepted 14 Aug 2013, Published online: 14 Nov 2013

References

  • Abdi, M. R., and A. W. Labib. 2003. “A Design Strategy for Reconfigurable Manufacturing Systems (RMSs) using Analytical Hierarchical Process (AHP): A Case Study.” International Journal of Production Research 41 (10): 2273–2299.
  • Abdi, M. R., and A. W. Labib. 2011. “Performance Evaluation of Reconfigurable Manufacturing Systems via Holonic Architecture and the Analytic Network Process.” International Journal of Production Research 49 (5): 1319–1335.
  • Agnihothri, S. R., and R. S. Kenett. 1995. “The Impact of Defects on a Process with Reworks.” European Journal of Operational Research 80: 308–327.
  • Barnhart, C., E. L. Johnson, G. L. Nemhauser, M. W. Savelsbergh, and P. H. Vance. 1998. “Be Integer Programs.” Operations Research 46 (3): 316–329.
  • Battaia, O., and A. Dolgui. 2013. “A Taxonomy of Line Balancing Problems and their Solution Approaches.” International Journal of Production Economics 142: 259–277.
  • Bi, Z. M., Z. Y. T. Lang, W. Zen, and L. Wang. 2008. “Reconfigurable Manufacturing Systems: The State of the Art.” International Journal of Production Research 46 (4): 967–992.
  • Chen, K. S., M. L. Huang, and R. K. Liz. 2001. “Process Capability Analysis for an Entire Product.” International Journal of Production Research 39 (17): 4077–4087.
  • Cordeau, J. F., G. Laporte, and A. Mercier. 2001. “A Unified Tabu Search Heuristic for Vehicle Routing Problems with Time Windows.” Journal of the Operational Research Society 52: 928–936.
  • Desaulniers, G., J. Lavigne, and F. Soumis. 1998. “Multi-depot Vehicle Scheduling Problems with Time Windows and Waiting Costs.” European Journal of Operational Research 111 (3): 479–494.
  • Desrosiers, J., Y. Dumas, M. M. Solomon, and F. Soumis. 1995. “Time Constrained Routing and Scheduling.” Handbooks in Operations Research and Management Science 8: 35–139.
  • Desrosiers, J., F. Soumis, and M. Desrochers. 1984. “Routing with Time Windows by Column Generation.” Networks 14: 545–565.
  • ElMaraghy, H. A. 2007. “Reconfigurable Process Plans for Responsive Manufacturing Systems.” In Digital Enterprise Technology, Perspectives and Future Challenges, edited by Pedro Filipe Cunha, and Paul G. Maropoulos, 35–44. Springer.
  • Essafi, M., X. Delorme, and A. Dolgui. 2010. “Balancing Lines with CNC Machines: A Multi-start and Based Heuristic.” CIRP Journal of Manufacturing Science and Technology 2: 176–182.
  • Essafi, M., X. Delorme, and A. Dolgui. 2012. “A Reactive GRASP and Path Relinking for Balancing Reconfigurable Transfer Lines.” International Journal of Production Research 50 (18): 5213–5238.
  • Faneyte, D. B. C., F. C. R. Spieksma, and G. J. Woeginger. 2002. “A Branch-and-price Algorithm for a Hierarchical Crew Scheduling Problem.” Naval Research Logistics (NRL) 49 (8): 743–759.
  • Federgruen, A., and P. Zipkin. 1984. “A Combined Vehicle Routing and Inventory Allocation Problem.” Operations Research 32 (5): 1019–1037.
  • Gamache, M., F. Soumis, and G. Marquis. 1999. “A Column Generation Approach for Large-scale Aircrew Rostering Problems.” Operations Research 47 (2): 247–263.
  • Ge, Y., and Y. Yih. 1995. “Crane Scheduling with Time Windows in Circuit Board Production Lines.” International Journal of Production Research 33: 1187–1199.
  • Geoffrion, A. M., and G. W. Graves. 1974. “Multi-commodity Distribution System Design by Bender Decomposition.” Operations Research 20 (5): 822–844.
  • Goyal, S. K., and A. Gunasekaran. 1990. “Effect of Dynamic Process Quality on the Economics of Production.” International Journal of Operations and Production Management 10: 69–77.
  • Hong, M., S. Payandeh, and W. A. Gruver. 1996. “Modeling and Analysis of Flexible Fixturing Systems for Agile Manufacturing.” In Systems, Man, and Cybernetics, IEEE International Conference on, Beijing, October 14–17, 2: 1231–1236.
  • Huang, Q., J. Shi, and J. Yuan. 2003. “Part Dimensional Error and its Propagation Modeling in Multi-operational Machining Processes.” ASME Journal of Manufacturing Science in Engineering 125: 255–262.
  • Ioachim, I., S. Gelinas, J. Desrosiers, and F. Soumis. 1998. “A Dynamic Programming Algorithm for the Shortest Path Problem with Time Windows and Linear Node Costs.” Networks 3: 193–204.
  • Kane, V. E. 1986. “Process Capability Index.” Journal of Quality Technology 18 (1): 41–52.
  • Koren, Y., U. Heisel, F. Jovane, T. Moriwaki, G. Pritschow, G. Ulsoy, and H. Van Brussel. 1999. “Reconfigurable Manufacturing Systems.” CIRP Annals-Manufacturing Technology 48 (2): 527–540.
  • Kristianto, Y., P. Helo, and R. J. Jiao. 2013. “Mass Customization Design of Engineer-to-order Products Using Benders’ Decomposition and Bi-level Stochastic Programming.” Journal of Intelligent Manufacturing 24: 961–975.
  • Mercier, A., J. F. Cordeau, and F. Soumis. 2005. “A Computational Study of Benders Decomposition for the Integrated Aircraft Routing and Crew Scheduling Problem.” Computers and Operations Research 32: 1451–1476.
  • Porteus, E. L. 1986. “Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction.” Operations Research 34 (19): 137–144.
  • Rosenblatt, M. J., and H. L. Lee. 1986. “Economic Production Cycle with Imperfect Production Processes.” IIE Transactions 18: 48–55.
  • Shi, J. 2007. Stream of Variation Modelling and Analysis for Multistage Manufacturing Processes. Boca Raton, FL: CRC Press.
  • Stojkovic, M., and F. Soumis. 2001. “An Optimization Model for the Simultaneous Operational Flight and Pilot Scheduling Problem.” Management Science 47 (9): 1290–1305.
  • Tang, Y., Z. M. Bi, and R. G. Qiu. 2004. “Integrated Design Approach for Virtual Production Line-based Reconfigurable Manufacturing Systems.” International Journal of Production Research 42 (18): 3803–3822.
  • Tapiero, C. S., P. H. Ritchken, and A. Reisman. 1987. “Reliability, Pricing and Quality Control.” European Journal of Operational Research 31: 37–45.
  • Vance, P., C. Barnhart, E. Johnson, and G. Nemhauser. 1997. “Airline Crew Scheduling: A New Formulation and Decomposition Algorithm.” Operations Research 45 (2): 188–200.
  • Wang, C. H., and H. S. Sheu. 2001. “Simultaneous Determination of the Optimal Production Inventory and Product Inspection Policies for a Deteriorating Production System.” Computers and Operations Research 28: 1093–1110.
  • Xiaobo, Z., W. Jiancai, and L. Zhenbi. 2000. “A Stochastic Model of a Reconfigurable Manufacturing Systems. Part 1. A Framework.” International Journal of Production Research 38: 2273–2285.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.