An artificial bee colony algorithm for the economic lot scheduling problem

&
Pages 1150-1170 | Received 26 Jan 2012, Accepted 12 Sep 2013, Published online: 22 Oct 2013

References

  • Bomberger, E. E. 1966. “A Dynamic Programming Approach to a Lot Size Scheduling Problem.” Management Science 12: 778–784.
  • Bourland, K. E., and C. A. Yano. 1997. “A Comparison of Solution Approaches for the Fixed-sequence Economic Lot Scheduling Problem.” IIE Transactions 29(2): 103–108.
  • Chan, H. K., S. H. Chung, and T. M. Chan. 2012. “Combining Genetic Approach and Integer Programming to Solve Multi-facility Economic Lot-scheduling Problem.” Journal of Intelligent Manufacturing 23(6): 2397–2405.
  • Chatfield, D. C. 2007. “The Economic Lot Scheduling Problem: A Pure Genetic Search Approach.” Computers and Operations Research 34(10): 2865–2881.
  • Chung, S. H., and H. K. Chan. 2012. “A Two-level Genetic Algorithm to Determine Production Frequencies for Economic Lot Scheduling Problem.” IIE Transactions on Industrial Electronics 59(1): 611–619.
  • Coello, C. A. C. 2002. “Theoretical and Numerical Constraint-handling Techniques Used with Evolutionary Algorithms: A Survey of the State of the Art.” Computer Methods in Applied Mechanics and Engineering 191(11–12): 1245–1287.
  • Coit, D. W., and A. E. Smith. 1996. “Penalty Guided Genetic Search for Reliability Design Optimization.” Computers and Industrial Engineering 30(4): 895–904.
  • Deb, K. 2000. “An Efficient Constraint Handling Method for Genetic Algorithms.” Computer Methods in Applied Mechanics and Engineering 186: 311–338.
  • Dobson, G. 1987. “The ELSP: Achieving Feasibility Using Time-varying Lot Sizes.” Operations Research 35: 764–771.
  • Dobson, G. 1992. “The Cyclic Lot Scheduling Problem with Sequence-dependent Setups.” Operations Research 40: 736–749.
  • Elmaghraby, S. E. 1978. “The Economic Lot Scheduling Problem (ELSP): Review and Extensions.” Management Science 24: 587–598.
  • Fujita, S. 1978. “The Application of Marginal Analysis to the ELSP.” AIIE Transactions 10(4): 354–361.
  • Gallego, G. 1993. “Reduced Production Rates in the Economic Lot Scheduling Problem.” International Journal of Production Research 31(5): 1035–1046.
  • Gen, M., and R. Cheng. 2000. Genetic Algorithms and Engineering Optimization. New York, NY: Wiley.
  • Grznar, J., and C. Riggle. 1997. “An Optimal Algorithm for the Basic Period Approach to the Economic Lot Schedule Problem.” Omega 25: 355–364.
  • Haessler, R. 1979. “An Improved Extended Basic Period Procedure for Solving the Economic Lot Scheduling Problem.” AIIE Transactions 11: 336–340.
  • Hanssmann, F. 1962. Operation Research in Production and Inventory. New York: Wiley.
  • Hax, A. C., and D. Candea. 1984. Production and Inventory Management. Englewood Cliffs, NJ: Printice-Hall.
  • Hsu, W. 1983. “On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine.” Management Science 29: 93–105.
  • Karaboga, D. 2005. An Idea Based on Honey Bee Swarm for Numerical Optimization. Technical Report TR06. Turkey: Computer Engineering Department, Erciyes University.
  • Karaboga, D. 2009. “A New Design Method Based on Artificial Bee Colony Algorithm for Digital IIR Filters.” Journal of the Franklin Institute 346: 328–348.
  • Karaboga, D., and B. Basturk. 2007. “A Powerful and Efficient Algorithm for Numerical Function Optimization: Artificial Bee Colony (ABC) Algorithm.” Journal of Global Optimization 39: 459–471.
  • Karaboga, D., and B. Basturk. 2008. “On the Performance of Artificial Bee Colony (ABC) Algorithm.” Applied Soft Computing 8: 687–697.
  • Karabulut, K., and M. F. Tasgetiren 2012. “A Discrete Artificial Bee Colony Algorithm for the Travelling Salesman Problem with Time Windows”. In Proceedings of the IEEE Congress on Evolutionary Computation, CEC 2012, 1–7. Brisbane, June 10–15.
  • Kayvanfar, V., and M. Zandieh. 2012. “The Economic Lot Scheduling Problem with Deteriorating Items and Shortage: An Imperialist Competitive Algorithm.” International Journal of Advanced Manufacturing Technology 62(5–8): 759–773.
  • Khouja, M., Z. Michalewicz, and M. Wilmot. 1998. “The Use of Genetic Algorithms to Solve the Economic Lot Size Scheduling Problem.” European Journal of Operational Research 110: 509–524.
  • Leven, E., and A. Segerstedt. 2007. “A Scheduling Policy for Adjusting Economic Lot Quantities to a Feasible Solution.” European Journal of Operational Research 179(2): 414–423.
  • Luo, R. 2010. “New Algorithm for Economic Lot Scheduling Problem.” In Logistics Systems and Intelligent Management, 2010 International Conference, 334–337. Harbin, January 9–10.
  • Mladenovic, N., and P. Hansen. 1997. “Variable Neighborhood Search.” Computers and Operations Research 24: 1097–1100.
  • Nilsson, K., and A. Segerstedt. 2008. “Corrections of Costs to Feasible Solutions of Economic Lot Scheduling Problems.” Computers and Industrial Engineering’ 54(1): 155–168.
  • Raza, A. S., and A. Akgunduz. 2008. “A Comparative Study of Heuristic Algorithms on Economic Lot Scheduling Problem.” Computers and Industrial Engineering 55(1): 94–109.
  • Rogers, J. 1958. “A Computational Approach to the Economic Lot Scheduling Problem.” Management Science 4: 264–291.
  • Roundy, R. 1989. “Rounding Off to Power of Two in Continuous Relaxations of Capacitated Lot Sizing Problems.” Management Science 35(12): 1433–1442.
  • Shirodkar, V. A., M. V. Pillai, and R. Sridharan. 2011. “On the Feasibility of Sequence-dependent Economic Lot Scheduling Problem.” International Journal of Production Research 49(10): 2925–2939.
  • Sun, H., H.-C. Huang, and W. Jaruphongsa. 2009a. “Genetic Algorithms for the Multi-machine Economic Lot Scheduling Problem.” International Journal of Advanced Manufacturing Technology 43(11–12): 1251–1260.
  • Sun, H., H.-C. Huang, and W. Jaruphongsa. 2009b. “A Genetic Algorithm for the Economic Lot Scheduling Problem under the Extended Basic Period and Power-of-two Policy.” CIRP Journal of Manufacturing Science and Technology 2: 29–34.
  • Sun, H., H. Huang, and W. Jaruphongsa. 2010. “The Economic Lot Scheduling Problem under Extended Basic Period and Power-of-two Policy.” Optimization Letters 4: 157–172.
  • Takahama, T., and S. Sakai. 2005. “Constrained Optimization by ϵ Constrained Particle Swarm Optimizer with ϵ-Level Control.” In Proceedings of the 4th IEEE International Workshop on Soft Computing as Transdisciplinary, Science and Technology (WSTST’05), 1019–1029. Muroran, May 25–27.
  • Takahama, T., and S. Sakai. 2006. “Constrained Optimization by the Constrained Differential Evolution with Gradient-based Mutation and Feasible Elites.” IEEE Congress on Evolutionary Computation Sheraton Vancouver Wall Centre Hotel, 1–8. Vancouver, BC, Canada.
  • Takahama, T., and S. Sakai. 2010. “Efficient Constrained Optimization by the ε Constrained Adaptive Differential Evolution”. In WCCI 2010 IEEE World Congress on Computational Intelligence, July, 18–23: Barcelona, Spain.
  • Tang, O., and R. H. Teunter. 2006. “Economic Lot Scheduling Problem with Returns.” Production and Operations Management 15(4): 488–497.
  • Tasgetiren, M. F., O. Bulut, and M. M. Fadıloglu. 2011. “A Discrete Artificial Bee Colony Algorithm for the Economic Lot Scheduling Problem.” Proceedings of the IEEE Congress on Evolutionary Computation, CEC 2011, 347–353. New Orleans, LA . June 5–8.
  • Tasgetiren, M. F., O. Bulut, and M. M. Fadıloglu. 2012. “A Discrete Harmony Search Algorithm for the Economic Lot Scheduling Problem with Power of Two Policy.” Proceedings of the IEEE Congress on Evolutionary Computation, CEC 2012, 1–8. Brisbane . June 10–15.
  • Teunter, R. H., O. Tang, and K. Kaparis. 2009. “Heuristics for the Economic Lot Scheduling Problem with Returns.” International Journal of Production Economics 118(1): 323–330.
  • Wagner, B. J., and D. J. Davis. 2002. “A Search Heuristic for the Sequence-dependent Economic Lot Scheduling Problem.” European Journal of Operational Research 141(1): 133–146.
  • Zanoni, S., A. Segerstedt, O. Tang, and L. Mazzoldi. 2012. “Multi-product Economic Lot Scheduling Problem with Manufacturing and Remanufacturing Using a Basic Period Policy.” Computers and Industrial Engineering 62(4): 1025–1033.
  • Zhao, P. 2012. “An Improved Particle Swarm Optimization Algorithm for the Economic Lot Scheduling Problem under Power-of-two Policy.” Advances in Information Sciences and Service Sciences 4(20): 411–417.
  • Zipkin, P. 1991. “Computing Optimal Lot Sizes in the ELSP.” Operations Research 39: 56–63.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.