References
- Badell, M., J. Romero, and L. Puigjaner. 2004. “Joint Financial and Operating Scheduling/Planning in Industry.” Computer Aided Chemical Engineering 18: 883–888.
- Badell, M., J. Romero, and L. Puigjaner. 2005. “Optimal Budget and Cash Flows During Retrofitting Periods in Batch Chemical Process Industries.” International Journal of Production Economics 95 (3): 359–372.
- Blazewicz, J., M. Dror, and J. Weglarz. 1991. “Mathematical Programming Formulations for Machine Scheduling.” European Journal of Operational Research 51 (3): 283–300.
- Brucker, P., and S. A. Kravchenko. 2008. “Scheduling Jobs with Equal Processing Times and Time Windows on Identical Parallel Machines.” Journal of Scheduling 11: 229–237.
- Bruno, J., E. G. Coffman Jr., and R. Sethi. 1974. “Scheduling Independent Tasks to Reduce Mean Finishing Time.” Communications of the ACM 17: 382–387.
- Chen, C. L., and R. L. Bulfin. 1993. “Complexity of Single Machine, Multi-criteria Scheduling Problems.” European Journal of Operational Research 70: 115–125.
- Drozdowski, M. 2009. Scheduling for Parallel Processing. London: Springer-Verlag.
- Elazouni, A. 2009. “Heuristic Method for Multi-project Finance-based Scheduling.” Construction Management and Economics 27 (2): 199–211.
- Gafarov, E. R., A. A. Lazarev, and F. Werner. 2011. “Single Machine Scheduling Problems with Financial Resource Constraints: Some Complexity Results and Properties.” Mathematical Social Sciences 62 (1): 7–13.
- Jiaoa, Y. Y., J. Dub, and J. Jiao. 2006. “A Financial Model of Flexible Manufacturing Systems Planning under Uncertainty: Identification, Valuation and Applications of Real Options.” International Journal of Production Research 45 (6): 1389–1404.
- Liua, S. H., and C. J. Wang. 2009. “Two-stage Profit Optimization Model for Linear Scheduling Problems Considering Cash Flow.” Construction Management and Economics 27 (11): 1023–1037.
- Lusa, A., C. Martínez-Costaa, and M. Mas-Machuca. 2012. “An Integral Planning Model that Includes Production, Selling Price, Cash Flow Management and Flexible Capacity.” International Journal of Production Research 50 (6): 1568–1581.
- Pinedo, M. 2012. Scheduling: Theory, Algorithms and Systems. 4th ed. New York: Springer.
- Rohleder, T., and G. D. Scudder. 1995. “Information Inaccuracy: Implications for Economic Production Scheduling.” International Journal of Production Economics 41 (1): 51–66.
- Rothkopf, M. 1966. “Scheduling Independent Tasks on Parallel Processors.” Management Science 12 (5): 437–447.
- Sahni, S. 1976. “Algorithms for Scheduling Independent tasks.” Journal of the ACM 23 (1): 116–127.
- Smith, W. E. 1956. “Various Optimizers for Single Stage Production.” Naval Research Logistics Quarterly 3: 59–66.
- Szmerekovsky, J. 2007. “Single Machine Scheduling Under Market Uncertainty.” European Journal of Operational Research 177: 163–175.
- Valente, J. M. S. 2006. “Local and Global Dominance Conditions for the Weighted Earliness Scheduling Problem with no Idle Time.” Computers and Industrial Engineering 51 (4): 765–780.
- Van Wassenhove, L. N., and L. F. Gelders. 1980. “Solving a Bicriteria Scheduling Problem.” European Journal of Operational Research 4: 42–48.
- Voutsinas, T. G., and C. P. Pappis. 2002. “Scheduling Jobs with Values Exponentially Deteriorating Over Time.” International Journal of Production Economics 79 (3): 163–169.
- Xie, J. 1997. “Polynomial Algorithms for Single Machine Scheduling Problems with Financial Constraints.” Operations Research Letters 21 (1): 39–42.
- Yang, W. 2009. “Scheduling Jobs on a Single Machine to Maximize the Total Revenue of Jobs.” Computers and Operations Research 36 (2): 565–583.