1,280
Views
73
CrossRef citations to date
0
Altmetric
Articles

A bibliography of non-deterministic lot-sizing models

, &
Pages 2293-2310 | Received 03 May 2012, Accepted 04 Oct 2013, Published online: 14 Nov 2013

References

  • Aarts, E. H. L., M. F. Reijnhoudt, H. P. Stehouwer, and J. Wessels. 2000. “A Novel Decomposition Approach for On-line Lot-sizing.” European Journal of Operational Research 122 (2): 339–353.
  • Abass, S. A., M. A. Gomaa, G. A. Elsharawy, and M. Sh. Elsaid. 2010. “Generalized Production Planning Problem Under Interval Uncertainty.” Egyptian Informatics Journal 11 (1): 27–31.
  • Abboud, N. E., M. Y. Jaber, and N. A. Noueihed. 2000. “Economic Lot Sizing with the Consideration of Random Machine Unavailability Time.” Computers & Operations Research 27: 335–351.
  • Abdel-Malek, L., R. Montanari, and D. Meneghetti. 2008. “The Capacitated Newsboy Problem with Random Yield: The Gardener Problem.” International Journal of Production Economics 115 (1): 113–127.
  • Aghezzaf, E. H., M. A. Jamali, and D. Ait-Kadi. 2007. “An Integrated Production and Preventive Maintenance Planning Model.” European Journal of Operational Research 181 (2): 679–685.
  • Aghezzaf, E. H., C. Sitompul, and N. M. Najid. 2010. “Models for Robust Tactical Planning in Multi-stage Production Systems with Uncertain Demands.” Computers & Operations Research 37: 880–889.
  • Agnihothri, S., J. S. Lee, and J. Kim. 2000. “Lot Sizing with Random Yields and Tardiness Costs.” Computers & Operations Research 27: 437–459.
  • Agrawal, V., and S. Seshadri. 2000. “Impact of Uncertainty and Risk Aversion on Price and Order Quantity in the Newsvendor Problem.” Manufacturing & Service Operations Management 2 (4): 410–423.
  • Agrawal, N., S. A. Smith, and A. A. Tsay. 2002. “Multi-vendor Sourcing in a Retail Supply Chain.” Production and Operations Management 11 (2): 157–182.
  • Ahmed, S., U. Cakmak, and A. Shapiro. 2007. “Coherent Risk Measures in Inventory Problems.” European Journal of Operational Research 182 (1): 226–238.
  • Aissaoui, N., M. Haouari, and E. Hassini. 2007. “Supplier Selection and Order Lot Sizing Modeling: A Review.” Computers & Operations Research 34 (12): 3516–3540.
  • Alem, D. J., and R. Morabito. 2012. “Production Planning in Furniture Settings via Robust Optimization.” Computers & Operations Research 39 (2): 139–150.
  • Alfares, H. K., and H. H. Elmorra. 2005. “The Distribution-free Newsboy Problem: Extensions to the Shortage Penalty Case.” International Journal of Production Economics 93 (1): 465–477.
  • Al-Fawzan, M. A., and M. Hariga. 2002. “An Integrated Inventory-targeting Problem with Time-dependent Process Mean.” Production Planning & Control 13 (1): 11–16.
  • Aliev, R. A., B. Fazlollahi, B. G. Guirimov, and R. R. Aliev. 2007. “Fuzzy-genetic Approach to Aggregate Production-distribution Planning in Supply Chain Management.” Information Sciences 177 (20): 4241–4255.
  • Alp, O., N. K. Erkip, and R. Güllü. 2003. “Optimal Lot-sizing/Vehicle-dispatching Policies under Stochastic Lead Times and Stepwise Fixed Costs.” Operations Research 51: 160–166.
  • Arcelus, F. J., S. Kumar, and G. Srinivasan. 2007. “Pricing and Rebate Policies for the Newsvendor Problem in the Presence of a Stochastic Redemption Rate.” International Journal of Production Economics 107 (2): 467–482.
  • Arcelus, F. J., S. Kumar, and G. Srinivasan. 2008. “Pricing and Rebate Policies in the Two-echelon Supply Chain with Asymmetric Information Under Price-dependent, Stochastic Demand.” International Journal of Production Economics 113 (2): 598–618.
  • Axsäter, S. 2011. “Batch Quantities When Forecasts are Improving.” International Journal of Production Economics 133 (1): 212–215.
  • Bakal, I. S., and J. Geunes. 2010. “Order Timing Strategies in a Single-supplier, Multi-retailer System.” International Journal of Production Research 48 (8): 2395–2412.
  • Balakrishnan, A., M. S. Pangburn, and E. Stavrulaki. 2008. “Integrating the Promotional and Service Roles of Retail Inventories.” Manufacturing & Service Operations Management 10: 218–235.
  • Barbarosoglu, G. 2000. “An Integrated Supplier-buyer Model for Improving Supply Chain Coordination.” Production Planning & Control 11 (8): 732–741.
  • Bassok, Y., W. J. Hopp, and M. Rohatgi. 2002. “A Simple Linear Heuristic for the Service Constrained Random Yield Problem.” IIE Transactions 34 (5): 479–487.
  • Bearden, J. N., R. O. Murphy, and A. Rapoport. 2008. “Decision Biases in Revenue Management: Some Behavioral Evidence.” Manufacturing & Service Operations Management 10 (4): 625–636.
  • Ben-Daya, M., and M. Hariga. 2004. “Integrated Single Vendor Single Buyer Model with Stochastic Demand and Variable Lead Time.” International Journal of Production Economics 92 (1): 75–80.
  • Ben-Daya, M., and S. M. Noman. 2008. “Integrated Inventory and Inspection Policies for Stochastic Demand.” European Journal of Operational Research 185 (1): 159–169.
  • Ben-Tal, A., B. Golany, A. Nemirovski, and J. P. Vial. 2005. “Retailer-supplier Flexible Commitments Contracts: A Robust Optimization Approach.” Manufacturing & Service Operations Management 7: 248–271.
  • Ben-Zvi, T., and A. Grosfeld-Nir. 2007. “Serial Production Systems with Random Yield and Rigid Demand: A Heuristic.” Operations Research Letters 35 (2): 235–244.
  • Beraldi, P., and A. Ruszczynski. 2001. “A Branch and Bound Method for Stochastic Integer Problems Under Probabilistic Constraints.” Research Report 16-2001, RUTCOR.
  • Beraldi, P., G. Ghiani, E. Guerriero, and A. Grieco. 2006. “Scenario-based Planning for Lot-sizing and Scheduling with Uncertain Processing Times.” International Journal of Production Economics 101 (1): 140–149.
  • Berling, P. 2008. “The Capital Cost of Holding Inventory with Stochastically Mean-reverting Purchase Price.” European Journal of Operational Research 186 (2): 620–636.
  • Berling, P., and J. Marklund. 2006. “Heuristic Coordination of Decentralized Inventory Systems Using Induced Backorder Costs.” Production and Operations Management 15 (2): 294–310.
  • Berman, O., and D. Perry. 2006. “An EOQ Model with State-dependent Demand Rate.” European Journal of Operational Research 171 (1): 255–272.
  • Betts, J. M., and R. B. Johnston. 2005. “Just-in-time Component Replenishment Decisions for Assemble-to-order Manufacturing Under Capital Constraint and Stochastic Demand.” International Journal of Production Economics 95 (1): 51–70.
  • Bhattacharya, S., V. D. R. Guide, and L. N. van Wassenhove. 2006. “Optimal Order Quantities with Remanufacturing Across New Product Generations.” Production and Operations Management 15 (3): 421–431.
  • Bichescu, B. C., and M. J. Fry. 2009. “A Numerical Analysis of Supply Chain Performance Under Split Decision Rights.” Omega 37 (2): 358–379.
  • Bjork, K. M. 2012. “A Multi-item Fuzzy Economic Production Quantity Problem with a Finite Production Rate.” International Journal of Production Economics 135 (2): 702–707.
  • Bollapragada, R., and U. S. Rao. 2006. “Replenishment Planning in Discrete-time, Capacitated, Non-stationary, Stochastic Inventory Systems.” IIE Transactions 38 (7): 605–617.
  • Brander, P., E. Leven, and A. Segerstedt. 2005. “Lot Sizes in a Capacity Constrained Facility – A Simulation Study of Stationary Stochastic Demand.” International Journal of Production Economics 93 (1): 375–386.
  • Brandimarte, P. 2006. “Multi-item Capacitated Lot-sizing with Demand Uncertainty.” International Journal of Production Research 44 (15): 2997–3022.
  • Burke, G. J., J. E. Carrillo, and A. J. Vakharia. 2009. “Sourcing Decisions with Stochastic Supplier Reliability and Stochastic Demand.” Production and Operations Management 18 (4): 475–484.
  • Cachon, G. P., and A. G. Kök. 2007. “Implementation of the Newsvendor Model with Clearance Pricing: How to (and How not to) Estimate a Salvage Value.” Manufacturing & Service Operations Management 9: 276–290.
  • Cakanyildirim, M., J. H. Bookbinder, and Y. Gerchak. 2000. “Continuous Review Inventory Models Where Random Lead Time Depends on Lot Size and Reserved Capacity.” International Journal of Production Economics 68 (3): 217–228.
  • Chakraborty, T., B. C. Giri, and K. S. Chaudhuri. 2008. “Production Lot Sizing with Process Deterioration and Machine Breakdown.” European Journal of Operational Research 185 (2): 606–618.
  • Chakravarty, A. K., and N. Balakrishnan. 2004. “Real-time Revision of Order Quantities with Capacity Constraint: A Single Period Model.” Production and Operations Management 13 (2): 171–185.
  • Chan, L. M. A., D. Simchi-Levi, and J. Swann. 2006. “Pricing, Production, and Inventory Policies for Manufacturing with Stochastic Demand and Discretionary Sales.” Manufacturing & Service Operations Management 8 (2): 149–168.
  • Chang, H.-C. 2004. “An Application of Fuzzy Sets Theory to the EOQ Model with Imperfect Quality Items.” Computers & Operations Research 31 (12): 2079–2092.
  • Chang, P.-T., M.-Y. Yao, S.-F. Huang, and C.-T. Chen. 2006. “A Genetic Algorithm for Solving a Fuzzy Economic Lot-size Scheduling Problem.” International Journal of Production Economics 102 (2): 265–288.
  • Chen, S.-L., and C.-L. Liu. 2007. “Procurement Strategies in the Presence of the Spot Market – An Analytical Framework.” Production Planning & Control 18 (4): 297–309.
  • Chen, X., and D. Simchi-Levi. 2003. “Coordinating Inventory Control and Pricing Strategies with Random Demand and Fixed Ordering Cost.” Manufacturing & Service Operations Management 5 (1): 59–62.
  • Chen, C.-K., C.-C. Lo, and Y.-X. Liao. 2008. “Optimal Lot Size with Learning Consideration on an Imperfect Production System with Allowable Shortages.” International Journal of Production Economics 113 (1): 459–469.
  • Chen, J., D. D. Yao, and S. Zheng. 2001. “Optimal Replenishment and Rework with Multiple Unreliable Supply Sources.” Operations Research 49: 430–443.
  • Chen, Y. F. 2005. “Fractional Programming Approach to Two Stochastic Inventory Problems.” European Journal of Operational Research 160 (1): 63–71.
  • Chen, F., and M. Parlar. 2007. “Value of a Put Option to the Risk-averse Newsvendor.” IIE Transactions 39 (5): 481–500.
  • Chen, X., A. Ghate, and A. Tripathi. 2011. “Dynamic Lot-sizing in Sequential Online Retail Auctions.” European Journal of Operational Research 215 (1): 257–267.
  • Chew, E. P., C. Lee, and R. Liu. 2009. “Joint Inventory Allocation and Pricing Decisions for Perishable Products.” International Journal of Production Economics 120 (1): 139–150.
  • Chiadamrong, N., and K. Prasertwattana. 2006. “A Comparative Study of Supply Chain Models Under the Traditional Centralized and Coordinating Policies with Incentive Schemes.” Computers & Industrial Engineering 50: 367–384.
  • Chiu, S. W. 2008. “Production Lot Size Problem with Failure in Repair and Backlogging Derived Without Derivatives.” European Journal of Operational Research 188 (2): 610–615.
  • Choi, S., and S. T. Enns. 2004. “Multi-product Capacity-constrained Lot Sizing with Economic Objectives.” International Journal of Production Economics 91 (1): 47–62.
  • Choi, J., J. J. Cao, H. E. Romeijn, J. Geunes, and S. X. Bai. 2005. “A Stochastic Multi-item Inventory Model with Unequal Replenishment Intervals and Limited Warehouse Capacity.” IIE Transactions 37 (12): 1129–1141.
  • Choi, H.-C. P., J. D. Blocher, and S. Gavirneni. 2008. “Value of Sharing Production Yield Information in a Serial Supply Chain.” Production and Operations Management 17 (6): 614–625.
  • Chung, K.-J. 2003. “Approximations to Production Lot Sizing with Machine Breakdowns.” Computers & Operations Research 30 (10): 1499–1507.
  • Chung, K.-J., and C.-N. Lin. 2001. “Optimal Inventory Replenishment Models for Deteriorating Items Taking Account of Time Discounting.” Computers & Operations Research 28: 67–83.
  • Chung, K.-J., and K.-L. Hou. 2003. “An Optimal Production Run Time with Imperfect Production Processes and Allowable Shortages.” Computers & Operations Research 30: 483–490.
  • Cristobal, M. P., L. F. Escudero, and J. F. Monge. 2009. “On Stochastic Dynamic Programming for Solving Large-scale Planning Problems Under Uncertainty.” Computers & Operations Research 36: 2418–2428.
  • Dada, M., N. C. Petruzzi, and L. B. Schwarz. 2007. “A Newsvendor’s Procurement Problem when Suppliers are Unreliable.” Manufacturing & Service Operations Management 9 (1): 9–32.
  • Darwish, M. A., and M. Ben-Daya. 2007. “Effect of Inspection Errors and Preventive Maintenance on a Two-stage Production Inventory System.” International Journal of Production Economics 107 (1): 301–313.
  • Das, K., T. K. Roy, and M. Maiti. 2000. “Multi-item Inventory Model with Quantity-dependent Inventory Costs and Demand-dependent Unit Cost Under Imprecise Objective and Restrictions: A Geometric Programming Approach.” Production Planning & Control 11 (8): 781–788.
  • Das, B., K. Maity, and M. Maiti. 2007. “A Two Warehouse Supply-chain Model Under Possibility/Necessity/Credibility Measures.” Mathematical and Computer Modelling 46 (3–4): 398–409.
  • Das, D., A. Roy, and S. Kar. 2011. “A Volume Flexible Economic Production Lot-sizing Problem with Imperfect Quality and Random Machine Failure in Fuzzy-stochastic Environment.” Computers & Mathematics with Applications 61 (9): 2388–2400.
  • De, S. K., and A. Goswami. 2006. “An EOQ Model with Fuzzy Inflation Rate and Fuzzy Deterioration Rate When a Delay in Payment is Permissible.” International Journal of Systems Science 37 (5): 323–335.
  • Dellino, G., J. P. C. Kleijnen, and C. Meloni. 2010. “Robust Optimization in Simulation: Taguchi and Response Surface Methodology.” International Journal of Production Economics 125 (1): 52–59.
  • Depuy, G. W., and J. S. Usher. 2001. “A Heuristic Approach to the Batch Sizing Problem.” Production Planning & Control 12 (4): 372–378.
  • Dolgui, A., and C. Prodhon. 2007. “Supply Planning Under Uncertainties in MRP Environments: A State of the Art.” Annual Reviews in Control 31 (2): 269–279.
  • Dolgui, A., O. Ben Ammar,F. Hnaien,and M.-A. Louly. 2013. “A State of the Art on Supply Planning and Inventory Control Under Lead Time Uncertainty.” Studies in Informatics and Control 22 (3): 255–268.
  • Douillet, P. L., and B. Rabenasolo. 2008. “Robustness Analysis of Stochastic Inventory Systems using the Newsboy Model.” Production Planning & Control 19 (2): 160–170.
  • Erdem, A. S., M. M. Fadiloglu, and S. Ozekici. 2006. “An EOQ Model with Multiple Suppliers and Random Capacity.” Naval Research Logistics 53 (1): 101–114.
  • Ertoĝral, K. 2011. “Vendor-buyer Lot Sizing Problem with Stochastic Demand: An Exact Procedure Under Service Level Approach.” European Journal of Industrial Engineering 5 (1): 101–110.
  • Esmaeili, M., and P. Zeephongsekul. 2010. “Seller-buyer Models of Supply Chain Management with an Asymmetric Information Structure.” International Journal of Production Economics 123 (1): 146–154.
  • Fadiloglu, M. M., E. Berk, and M. Ç. Gürbüz. 2008. “Supplier Diversification Under Binomial Yield.” Operations Research Letters 36 (5): 539–542.
  • Feng, K., U. S. Rao, and A. Raturi. 2011. “Setting Planned Orders in Master Production Scheduling Under Demand Uncertainty.” International Journal of Production Research 49 (13): 4007–4025.
  • Fisher, M., K. Rajaram, and A. Raman. 2001. “Optimizing Inventory Replenishment of Retail Fashion Products.” Manufacturing & Service Operations Management 3 (3): 230–241.
  • Fleischhacker, A. J., and Y. Zhao. 2011. “Planning for Demand Failure: A Dynamic Lot Size Model for Clinical Trial Supply Chains.” European Journal of Operational Research 211 (3): 496–506.
  • Fu, Q., C.-Y. Lee, and C.-P. Teo. 2010. “Procurement Management Using Option Contracts: Random Spot Price and the Portfolio Effect.” IIE Transactions 42 (11): 793–811.
  • Galbreth, M. R., and J. D. Blackburn. 2006. “Optimal Acquisition and Sorting Policies for Remanufacturing.” Production and Operations Management 15 (3): 384–392.
  • Galbreth, M. R., and J. D. Blackburn. 2010. “Optimal Acquisition Quantities in Remanufacturing with Condition Uncertainty.” Production and Operations Management 19 (1): 61–69.
  • Gebennini, E., R. Gamberini, and R. Manzini. 2009. “An Integrated Production-distribution Model for the Dynamic Location and Allocation Problem with Safety Stock Optimization.” International Journal of Production Economics 122 (1): 286–304.
  • Gerchak, Y., E. Hassini, and S. Ray. 2002. “Capacity Selection Under Uncertainty with Ratio Objectives.” European Journal of Operational Research 143 (1): 138–147.
  • Giri, B. C. 2011. “Managing Inventory with Two Suppliers under Yield Uncertainty and Risk Aversion.” International Journal of Production Economics 133 (1): 80–85.
  • Giri, B. C., and T. Dohi. 2004. “Optimal Lot Sizing for an Unreliable Production System Based on Net Present Value Approach.” International Journal of Production Economics 92 (2): 157–167.
  • Giri, B. C., and T. Dohi. 2005a. “Computational Aspects of an Extended EMQ Model with Variable Production Rate.” Computers & Operations Research 32: 3143–3161.
  • Giri, B. C., and T. Dohi. 2005b. “Exact Formulation of Stochastic EMQ Model for an Unreliable Production System.” Journal of the Operations Research Society 56: 563–575.
  • Giri, B. C., and W. Y. Yun. 2005. “Optimal Lot Sizing for an Unreliable Production System Under Partial Backlogging and at most Two Failures in a Production Cycle.” International Journal of Production Economics 95 (2): 229–243.
  • Gnoni, M. G., R. Iavagnilio, G. Mossa, G. Mummolo, and A. Di Leva. 2003. “Production Planning of a Multi-site Manufacturing System by Hybrid Modelling: A Case Study from the Automotive Industry.” International Journal of Production Economics 85 (2): 251–262.
  • Gotoh, J.-Y., and Y. Takano. 2007. “Newsvendor Solutions via Conditional Value-at-risk Minimization.” European Journal of Operational Research 179 (1): 80–96.
  • Grosfeld-Nir, A. 2005. “A Two-bottleneck System with Binomial Yields and Rigid Demand.” European Journal of Operational Research 165 (1): 231–250.
  • Grosfeld-Nir, A., and Y. Gerchak. 2004. “Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances.” Annals of Operations Research 126: 43–69.
  • Grubbstrom, R. W., and Z. Wang. 2003. “A Stochastic Model of Multi-level/Multi-stage Capacity-constrained Production–Inventory Systems.” International Journal of Production Economics 81–82: 483–494.
  • Guan, Y. 2011. “Stochastic Lot-sizing with Backlogging: Computational Complexity Analysis.” Journal of Global Optimization 49 (4): 651–678.
  • Guan, Y., and A. J. Miller. 2008. “Polynomial-time Algorithms for Stochastic Uncapacitated Lot-sizing Problems.” Operations Research 56 (5): 1172–1183.
  • Guan, Y., S. Ahmed, G. L. Nemhauser, and A. J. Miller. 2006a. “A Branch-and-cut Algorithm for the Stochastic Uncapacitated Lot-sizing Problem.” Mathematical Programming, Ser. A 105: 55–84.
  • Guan, Y., S. Ahmed, A. J. Miller, and G. L. Nemhauser. 2006b. “On Formulations of the Stochastic Uncapacitated Lot-sizing Problem.” Operations Research Letters 34 (3): 241–250.
  • Guan, Y., and T. Liu. 2010. “Stochastic Lot-sizing Problem with Inventory-bounds and Constant Order-capacities.” European Journal of Operational Research 207 (3): 1398–1409.
  • Guillaume, R., P. Kobylanski, and P. Zielinski. 2012. “A Robust Lot Sizing Problem with Ill-known Demands.” Fuzzy Sets and Systems 206: 39–57.
  • Güler, M. G., and T. Bilgiç. 2009. “On Coordinating an Assembly System under Random Yield and Random Demand.” European Journal of Operational Research 196 (1): 342–350.
  • Gupta, R. K., A. K. Bhunia, and S. K. Goyal. 2009. “An Application of Genetic Algorithm in Solving an Inventory Model with Advance Payment and Interval Valued Inventory Costs.” Mathematical and Computer Modelling 49 (5–6): 893–905.
  • Gupta, A., and C. D. Maranas. 2003. “Managing Demand Uncertainty in Supply Chain Planning.” Computers & Chemical Engineering 27 (8–9): 1219–1227.
  • Gurnani, H., and Y. Gerchak. 2007. “Coordination in Decentralized Assembly Systems with Uncertain Component Yields.” European Journal of Operational Research 176 (3): 1559–1576.
  • Gurnani, H., R. Akella, and J. Lehoczky. 2000. “Supply Management in Assembly Systems with Random Yield and Random Demand.” IIE Transactions 32: 701–714.
  • Gutiérrez, J., J. Puerto, and J. Sicilia. 2004. “The Multi-scenario Lot Size Problem with Concave Costs.” European Journal of Operational Research 156 (1): 162–182.
  • Guu, S.-M., and A. X. Zhang. 2003. “The Finite Multiple Lot Sizing Problem with Interrupted Geometric Yield and Holding Costs.” European Journal of Operational Research 145 (3): 635–644.
  • Han, G., and M. Dong. 2011. “A Study on Random Yield and Uncertain Demand in Semiconductor Manufacturing.” Advanced Science Letters 4 (6–7): 2295–2300.
  • Haugen, K. K., A. Løkketangen, and D. L. Woodruff. 2001. “Progressive Hedging as a Meta-heuristic Applied to Stochastic Lot-sizing.” European Journal of Operational Research 132 (1): 116–122.
  • Haughton, M. A. 2009. “Distortional Bullwhip Effects on Carriers.” Transportation Research Part E: Logistics and Transportation Review 45 (1): 172–185.
  • Hayek, P. A., and M. K. Salameh. 2001. “Production Lot Sizing with the Reworking of Imperfect Quality Items Produced.” Production Planning & Control 12 (6): 584–590.
  • He, Y., and J. Zhang. 2008. “Random Yield Risk Sharing in a Two-level Supply Chain.” International Journal of Production Economics 112 (2): 769–781.
  • He, X. J., J. G. Kim, and J. C. Hayya. 2005. “The Cost of Lead-time Variability: The Case of the Exponential Distribution.” International Journal of Production Economics 97 (2): 130–142.
  • Heisig, G. 2001. “Comparison of (s, S) and (s, nQ) Inventory Control Rules with Respect to Planning Stability.” International Journal of Production Economics 73 (1): 59–82.
  • Helber, S., F. Sahling, and K. Schimmelpfeng. 2012. “Dynamic Capacitated Lot Sizing with Random Demand and Dynamic Safety Stocks.” OR Spectrum. doi:10.1007/s00291-012-0283.
  • Hennet, J.-C. 2003. “A Bimodal Scheme for Multi-stage Production and Inventory Control.” Automatica 39 (5): 793–805.
  • Hojati, M. 2004. “Bridging the Gap Between Probabilistic and Fuzzy-parameter EOQ Models.” International Journal of Production Economics 91 (3): 215–221.
  • Horowitz, I. 2000. “EOQ and Inflation Uncertainty.” International Journal of Production Economics 65 (2): 217–224.
  • Hsu, P.-H., H. M. Wee, and H.-M. Teng. 2007. “Optimal Ordering Decision for Deteriorating Items with Expiration Date and Uncertain Lead Time.” Computers & Industrial Engineering 52 (4): 448–458.
  • Hsu, P.-H., H.-M. Teng, Y.-T. Jou, and H. M. Wee. 2008. “Coordinated Ordering Decisions for Products with Short Lifecycle and Variable Selling Price.” Computers & Industrial Engineering 54: 602–612.
  • Hu, J.-S., H. Zheng, R.-Q. Xu, Y.-P. Ji, and C.-Y. Guo. 2010. “Supply Chain Coordination for Fuzzy Random Newsboy Problem with Imperfect Quality.” International Journal of Approximate Reasoning 51 (7): 771–784.
  • Huang, C.-K. 2002. “An Integrated Vendor-buyer Cooperative Inventory Model for Items with Imperfect Quality.” Production Planning & Control 13 (4): 355–361.
  • Huang, K., and S. Ahmed. 2010. “A Stochastic Programming Approach for Planning Horizons of Infinite Horizon Capacity Planning Problems.” European Journal of Operational Research 200 (1): 74–84.
  • Huang, K., and S. Küçükyavuz. 2008. “On Stochastic Lot-sizing Problems with Random Lead Times.” Operations Research Letters 36 (3): 303–308.
  • In, J., Y. Hong, and C.-H.. Jun. 2003. “Analysis of a Batch Machine Fed by an Unreliable Discrete Machine.” Production Planning & Control 14 (7): 656–661.
  • Jaber, M. Y., and N. E. Abboud. 2001. “The Impact of Random Machine Unavailability on Inventory Policies in a Continuous Improvement Environment.” Production Planning & Control 12 (8): 754–763.
  • Jamalnia, A., and M. A. Soukhakian. 2009. “A Hybrid Fuzzy Goal Programming Approach with Different Goal Priorities to Aggregate Production Planning.” Computers & Industrial Engineering 56 (4): 1474–1486.
  • Jiang, R., and Y. Guan. 2011. “An O(n2)-time Algorithm for the Stochastic Uncapacitated Lot-sizing Problem with Random Lead Times.” Operations Research Letters 39 (1): 74–77.
  • Jones, P. C., T. J. Lowe, R. D. Traub, and G. Kegler. 2001. “Matching Supply and Demand: The Value of a Second Chance in Producing Hybrid Seed Corn.” Manufacturing & Service Operations Management 3: 122–137.
  • Kaminsky, P., and J. M. Swaminathan. 2004. “Effective Heuristics for Capacitated Production Planning with Multiperiod Production and Demand with Forecast Band Refinement.” Manufacturing & Service Operations Management 6: 184–194.
  • Kang, H.-Y., and A. H. I. Lee. 2010. “Inventory Replenishment Model Using Fuzzy Multiple Objective Programming: A Case Study of a High-tech Company in Taiwan.” Applied Soft Computing 10 (4): 1108–1118.
  • Kao, C., and W.-K. Hsu. 2002a. “A Single-period Inventory Model with Fuzzy Demand.” Computers and Mathematics with Applications 43 (6–7): 841–848.
  • Kao, C., and W. K. Hsu. 2002b. “Lot Size-reorder Point Inventory Model with Fuzzy Demands.” Computers and Mathematics with Applications 43 (10–11): 1291–1302.
  • Kazaz, B. 2004. “Production Planning Under Yield and Demand Uncertainty with Yield-dependent Cost and Price.” Manufacturing & Service Operations Management 6 (3): 209–224.
  • Kelle, P., S. Transchel, and S. Minner. 2009. “Buyer-supplier Cooperation and Negotiation Support with Random Yield Consideration.” International Journal of Production Economics 118 (1): 152–159.
  • Keren, B. 2009. “The Single-period Inventory Problem: Extension to Random Yield from the Perspective of the Supply Chain.” Omega 37 (4): 801–810.
  • Keren, B., and J. S. Pliskin. 2006. “A Benchmark Solution for the Risk-averse Newsvendor Problem.” European Journal of Operational Research 174 (3): 1643–1650.
  • Keskin, B. B., S. H. Melouk, and I. L. Meyer. 2010. “A Simulation-optimization Approach for Integrated Sourcing and Inventory Decisions.” Computers & Operations Research 37: 1648–1661.
  • Ketzenberg, M. E., and R. A. Zuidwijk. 2009. “Optimal Pricing, Ordering, and Return Policies for Consumer Goods.” Production and Operations Management 18 (3): 344–360.
  • Khan, M., M. Y. Jaber, A. L. Guiffrida, and S. Zolfaghari. 2011. “A Review of the Extensions of a Modified EOQ Model for Imperfect Quality Items.” International Journal of Production Economics 132: 1–12.
  • Ko, M., A. Tiwari, and J. Mehnen. 2010. “A Review of Soft Computing Applications in Supply Chain Management.” Applied Soft Computing 10 (3): 661–674.
  • Köchel, P. 2007. “Order Optimisation in Multi-location Models with Hub-and-spoke Structure.” International Journal of Production Economics 108 (1–2): 368–387.
  • Köchel, P., and S. Thiem. 2011. “Search for Good Policies in a Single-warehouse, Multi-retailer System by Particle Swarm Optimisation.” International Journal of Production Economics 133 (1): 319–325.
  • Kofja, D., M. Kljajić, and V. Rejec. 2009. “The Anticipative Concept in Warehouse Optimization Using Simulation in an Uncertain Environment.” European Journal of Operational Research 193 (3): 660–669.
  • Koh, S. C. L., S. M. Saad, and M. H. Jones. 2002. “Uncertainty Under MRP-Planned Manufacture: Review and Categorization.” International Journal of Production Research 40 (10): 2399–2421.
  • Kostamis, D., and I. Duenyas. 2009. “Quantity Commitment, Production and Subcontracting with Bargaining.” IIE Transactions 41 (8): 677–686.
  • Kulkarni, S. S. 2006. “The Impact of Uncertain Yield on Capacity Acquisition in Process Plant Networks.” Mathematical and Computer Modelling 43 (7–8): 704–717.
  • Kulkarni, S. S. 2008a. “Loss-based Quality Costs and Inventory Planning: General Models and Insights.” Journal of Operational Research 188 (2): 428–449.
  • Kulkarni, S. S. 2008b. “On a Multi-product Model of Lot-sizing with Quality Costs.” International Journal of Production Economics 112 (2): 1002–1010.
  • Lan, Y., Y. Liu, and G. Sun. 2010. “An Approximation-based Approach for Fuzzy Multi-period Production Planning Problem with Credibility Objective.” Applied Mathematical Modelling 34 (11): 3202–3215.
  • Larsen, K. S., and S. Wøhlk. 2010. “Competitive Analysis of the Online Inventory Problem.” European Journal of Operational Research 207 (2): 685–696.
  • Lau, A. H. L., H.-S. Lau, and J.-C. Wang. 2007. “Designing a Quantity Discount Scheme for a Newsvendor-type Product with Numerous Heterogeneous Retailers.” European Journal of Operational Research 180 (2): 585–600.
  • Lee, H., and E. J. Lodree Jr. 2010. “Modeling Customer Impatience in a Newsboy Problem with Time-sensitive Shortages.” European Journal of Operational Research 205 (3): 595–603.
  • Lee, S. D., and J. M. Rung. 2000. “Production Lot Sizing in Failure Prone Two-stage Serial Systems.” European Journal of Operational Research 123 (1): 42–60.
  • Leung, K.-N. F. 2008. “Using the Complete Squares Method to Analyze a Lot Size Model when the Quantity Backordered and the Quantity Received are Both Uncertain.” European Journal of Operational Research 187 (1): 19–30.
  • Leung, S. C. H., and W.-L. Ng. 2007. “A Stochastic Programming Model for Production Planning of Perishable Products with Postponement.” Production Planning & Control 18 (3): 190–202.
  • Li, Q.-X., and Q. Zhang. 2008. “Optimal Fuzzy Order Inventory Model with a Mixture of Shortages and Imperfect Items.” Systems Engineering – Theory & Practice 28 (11): 62–68.
  • Li, J.-A., Y. Wu, K. K. Lai, and K. Liu. 2006. “Optimal Ordering Policy in a Distribution System.” International Journal of Production Economics 103 (2): 527–534.
  • Li, C., F. Liu, H. Cao, and Q. Wang. 2009. “A Stochastic Dynamic Programming Based Model for Uncertain Production Planning of Re-manufacturing System.” International Journal of Production Research 47 (13): 3657–3668.
  • Li, Q., H. Xu, and S. Zheng. 2008. “Periodic-review Inventory Systems with Random Yield and Demand: Bounds and Heuristics.” IIE Transactions 40 (4): 434–444.
  • Li, Q., and A. Ha. 2008. “Reactive Capacity and Inventory Competition Under Demand Substitution.” IIE Transactions 40 (8): 707–717.
  • Li, J., M. González, and Y. Zhu. 2009. “A Hybrid Simulation Optimization Method for Production Planning of Dedicated Remanufacturing.” International Journal of Production Economics 117 (2): 286–301.
  • Lian, Z., A. Deshmukh, and J. Wang. 2006. “The Optimal Frozen Period in a Dynamic Production Model.” International Journal of Production Economics 103 (2): 648–655.
  • Liang, T.-F. 2007. “Application of Interactive Possibilistic Linear Programming to Aggregate Production Planning with Multiple Imprecise Objectives.” Production Planning & Control 18 (7): 548–560.
  • Liang, T. F., and H. W. Cheng. 2009. “Application of Fuzzy Sets to Manufacturing/Distribution Planning Decisions with Multi-product and Multi-time Period in Supply Chains.” Expert Systems with Applications 36 (2, Part 2): 3367–3377.
  • Liao, Z., and J. Rittscher. 2007. “A Multi-objective Supplier Selection Model Under Stochastic Demand Conditions.” International Journal of Production Economics 105 (1): 150–159.
  • Liao, G.-L., Y. H. Chen, and S.-H. Sheu. 2009. “Optimal Economic Production Quantity Policy for Imperfect Process with Imperfect Repair and Maintenance.” European Journal of Operational Research 195 (2): 348–357.
  • Lin, G., and D. Gong. 2006. “On a Production-inventory System of Deteriorating Items Subject to Random Machine Breakdowns with a Fixed Repair Time.” Mathematical and Computer Modelling 43 (7–8): 920–932.
  • Liu, S.-T. 2008. “Fuzzy Profit Measures for a Fuzzy Economic Order Quantity Model.” Applied Mathematical Modelling 32 (10): 2076–2086.
  • Liu, X., and S. Cetinkaya. 2011. “The Supplier-buyer Integrated Production-inventory Model with Random Yield.” International Journal of Production Research 49 (13): 4043–4061.
  • Lulli, G., and S. Sen. 2004. “A Branch-and-price Algorithm for Multistage Stochastic Integer Programming with Application to Stochastic Batch-sizing Problems.” Management Science 50 (6): 786–796.
  • Lulli, G., and S. Sen. 2006. “A Heuristic Procedure for Stochastic Integer Programs with Complete Recourse.” European Journal of Operational Research 171 (3): 879–890.
  • Maddah, B., and M. Y. Jaber. 2008. “Economic Order Quantity for Items with Imperfect Quality: Revisited.” International Journal of Production Economics 112 (2): 808–815.
  • Maddah, B., L. Moussawi, and M. Y. Jaber. 2010. “Lot sizing with a Markov Production Process and Imperfect Items Scrapped.” International Journal of Production Economics 124 (2): 340–347.
  • Maddah, B., M. K. Salameh, and G. M. Karame. 2009. “Lot Sizing with Random Yield and Different Qualities.” Applied Mathematical Modelling 33 (4): 1997–2009.
  • Mahata, G. C., and A. Goswami. 2007. “An EOQ Model for Deteriorating Items Under Trade Credit Financing in the Fuzzy Sense.” Production Planning & Control 18 (8): 681–692.
  • Maiti, M. K., and M. Maiti. 2006. “Fuzzy Inventory Model with Two Warehouses Under Possibility Constraints.” Fuzzy Sets and Systems 157 (1): 52–73.
  • Maity, K., and M. Maiti. 2007. “Possibility and Necessity Constraints and Their Defuzzification – A Multi-item Production–Inventory Scenario via Optimal Control Theory.” European Journal of Operational Research 177 (2): 882–896.
  • Mandal, N. K., and T. K. Roy. 2006. “Multi-item Imperfect Production Lot Size Model with Hybrid Number Cost Parameters.” Applied Mathematics and Computation 182 (2): 1219–1230.
  • Markowitz, D. M., M. I. Reiman, and L. M. Wein. 2000. “The Stochastic Economic Lot Scheduling Problem: Heavy Traffic Analysis of Dynamic Cyclic Policies.” Operations Research 48 (1): 136–154.
  • Mehra, S., R. A. Inman, and G. Tuite. 2006. “A Simulation-based Comparison of Batch Sizes in a Continuous Processing Industry.” Production Planning & Control 17 (1): 54–66.
  • Meng, G., and S. Heragu. 2004. “Batch Size Modeling in a Multi-item, Discrete Manufacturing System via an Open Queuing Network.” IIE Transactions 36 (8): 743–753.
  • Minner, S., and E. A. Silver. 2005. “Multi-product Batch Replenishment Strategies Under Stochastic Demand and a Joint Capacity Constraint.” IIE Transactions 37 (5): 469–479.
  • Minner, S., and E. A. Silver. 2007. “Replenishment Policies for Multiple Products with Compound-poisson Demand that Share a Common Warehouse.” International Journal of Production Economics 108 (1–2): 388–398.
  • Missbauer, H. 2002. “Lot Sizing in Workload Control Systems.” Production Planning & Control 13 (7): 649–664.
  • Moini, A., and D. N. P. Murthy. 2000. “Optimal Lot Sizing with Unreliable Production System.” Mathematical and Computer Modelling 31 (10–12): 245–250.
  • Monahan, G. E., N. C. Petruzzi, and W. Zhao. 2004. “The Dynamic Pricing Problem from a Newsvendor’s Perspective.” Manufacturing & Service Operations Management 6 (1): 73–91.
  • Moon, I., B.-H. Ha, and J. Kim. 2012. “Inventory Systems with Variable Capacity.” European Journal of Industrial Engineering 6 (1): 68–86.
  • Mukhopadhyay, S. K., and H. Ma. 2009. “Joint Procurement and Production Decisions in Remanufacturing Under Quality and Demand Uncertainty.” International Journal of Production Economics 120 (1): 5–17.
  • Mula, J., D. Peidro, and R. Poler. 2010. “The Effectiveness of a Fuzzy Mathematical Programming Approach for Supply Chain Production Planning with Fuzzy Demand.” International Journal Production Economics 128: 136–143.
  • Mula, J., R. Poler, J. P. Garcia-Sabater, and F. C. Lario. 2006. “Models for Production Planning under Uncertainty: A Review.” International Journal of Production Economics 103 (1): 271–285.
  • Naeem, M., D. Dias, R. Tibrewal, P. Chang, andM. Tiwari. 2012. “Production Planning Optimization for Manufacturing and Remanufacturing System in Stochastic Environment.” Journal of Intelligent Manufacturing: 1–12. doi:10.1007/s10845-011-0619-0.
  • Nourelfath, M. 2011. “Service Level Robustness in Stochastic Production Planning Under Random Machine Breakdowns.” European Journal of Operational Research 212 (1): 81–88.
  • Olhager, J., and F. Persson. 2006. “Simulating Production and Inventory Control Systems: A Learning Approach to Operational Excellence.” Production Planning & Control 17 (2): 113–127.
  • Ozen, U., J. Fransoo, H. W. Norde, and M. Slikker. 2008. “Cooperation Between Multiple Newsvendors with Warehouses.” Manufacturing & Service Operations Management 10 (2): 311–324.
  • Pai, P.-F. 2003. “Capacitated Lot Size Problems with Fuzzy Capacity.” Mathematical and Computer Modelling 38 (5–6): 661–669.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2012a. “A Multi-echelon Supply Chain Model for Reworkable Items in Multiple-markets with Supply Disruption.” Economic Modelling 29: 1891–1898.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2012b. “Three-layer Supply Chain – A Production–Inventory Model for Reworkable Items.” Applied Mathematics and Computation 219: 530–543.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2013. “Maximising Profits for an EPQ Model with Unreliable Machine and Rework of Random Defective Items.” International Journal of Systems Science 44 (3): 582–594.
  • Panda, D., S. Kar, K. Maity, and M. Maiti. 2008. “A Single Period Inventory Model with Imperfect Production and Stochastic Demand Under Chance and Imprecise Constraints.” European Journal of Operational Research 188 (1): 121–139.
  • Parlar, M., and Z. K. Weng. 2003. “Balancing Desirable but Conflicting Objectives in the Newsvendor Problem.” IIE Transactions 35 (2): 131–142.
  • Peidro, D., J. Mula, M. Jiménez, and M. del Mar Botella. 2010. “A Fuzzy Linear Programming Based Approach for Tactical Supply Chain Planning in an Uncertainty Environment.” European Journal of Operational Research 205 (1): 65–80.
  • Perakis, G., and M. Zaretsky. 2008. “Multiperiod Models with Capacities in Competitive Supply Chain.” Production and Operations Management 17 (4): 439–454.
  • Petrovic, S., C. Fayad, D. Petrovic, E. Burke, and G. Kendall. 2008. “Fuzzy Job Shop Scheduling with Lot-sizing.” Annals of Operations Research 159 (1): 275–292.
  • Petruzzi, N. C., and M. Dada. 2001. “Information and Inventory Recourse for a Two-market, Price-setting Retailer.” Manufacturing & Service Operations Management 3: 242–263.
  • Piperagkas, G. S., I. Konstantaras, K. Skouri, and K. E. Parsopoulos. July 2012. “Solving the Stochastic Dynamic Lot-sizing Problem through Nature-inspired Heuristics.” Computers & Operations Research 39 (7): 1555–1565.
  • Pujawan, I. N. 2004. “The Effect of Lot Sizing Rules on Order Variability.” European Journal of Operational Research 159 (3): 617–635.
  • Pujawan, I. N., and E. A. Silver. 2008. “Augmenting the Lot Sizing Order Quantity When Demand is Probabilistic.” European Journal of Operational Research 188 (3): 705–722.
  • Qi, L., Z.-J. Max Shen, and L. V. Snyder. 2009. “A Continuous-review Inventory Model with Disruptions at Both Supplier and Retailer.” Production and Operations Management 18 (5): 516–532.
  • Quintana, R. 2002. “Recursive Linear Control of Order Release to Manufacturing Cells with Random Yield.” IIE Transactions 34: 489–500.
  • Rao, U. S. 2003. “Properties of the Periodic Review (R, T) Inventory Control Policy for Stationary, Stochastic Demand.” Manufacturing & Service Operations Management 5: 37–53.
  • Rao, U. S., J. M. Swaminathan, and J. Zhang. 2004. “Multi-product Inventory Planning with Downward Substitution, Stochastic Demand and Setup Costs.” IIE Transactions 36 (1): 59–71.
  • Rekik, Y. 2011. “Inventory Inaccuracies in the Wholesale Supply Chain.” International Journal of Production Economics 133 (1): 172–181.
  • Roels, G., and G. Perakis. 2006. “The Price of Information: Inventory Management with Limited Information About Demand.” Manufacturing & Service Operations Management 8 (1): 102–104.
  • Rong, L. 2011. “Expected Value Economic Order Quantity Model with Uncertain Costs.” Journal of Information and Computational Science 8 (8): 1261–1268.
  • Roy, A., M. K. Maiti, S. Kar, and M. Maiti. 2009. “An Inventory Model for a Deteriorating Item with Displayed Stock Dependent Demand Under Fuzzy Inflation and Time Discounting over a Random Planning Horizon.” Applied Mathematical Modelling 33 (2): 744–759.
  • Roy, A., S. S. Sana, and K. Chaudhuri. 2011a. “An Economic Order Quantity Model of Imperfect Quality Items with Partial Backlogging.” International Journal of Systems Science 42 (8): 1409–1419.
  • Roy, A., S. S. Sana, and K. Chaudhuri. 2011b. “An Optimal Shipment Strategy for Imperfect Items in a Stock-out Situation.” Mathematical and Computer Modelling 54: 2528–2543.
  • Roy, A., S. S. Sana,and K. Chaudhuri. 2012. “Optimal Replenishment Order for Uncertain Demand in Three Layer Supply Chain.” Economic Modelling 29: 2274–2282.
  • Sajadieh, M. S., and K. Eshghi. 2009. “Sole Versus Dual Sourcing Under Order Dependent Lead Times and Prices.” Computers & Operations Research 36: 3272–3280.
  • Sana, S. S. 2010. “An Economic Production Lot Size Model in an Imperfect Production System.” European Journal of Operational Research 201 (1): 158–170.
  • Sana, S. S. 2011. “A Production–Inventory Model of Imperfect Quality Products in a Three-layer Supply Chain.” Decision Support Systems 50 (2): 539–547.
  • Sana, S. S. 2012a. “A Collaborating Inventory Model in a Supply Chain.” Economic Modelling 29: 2016–2023.
  • Sana, S. S. 2012b. “An Economic Order Quantity Model for Nonconforming Quality Products.” Service Science 4 (4): 331–348.
  • Sana, S. S. 2012c. “Price Sensitive Demand with Random Sales Price – A Newsboy Problem.” International Journal of Systems Science 43 (3): 491–498.
  • Sana, S. S. 2012d. “Preventive Maintenance and Optimal Buffer Inventory for Products Sold with Warranty in an Imperfect Production System.” International Journal of Production Research 50 (23): 6763–6774.
  • Sana, S. S. 2013. “Optimal Contract Strategies for Two Stage Supply Chain.” Economic Modelling 30: 253–260.
  • Sana, S. S., and K. Chaudhuri. 2010. “An EMQ Model in an Imperfect Production Process.” International Journal of Systems Science 41 (6): 635–646.
  • Sana, S. S., S. K. Goyal, and K. Chaudhuri. 2007. “An Imperfect Production Process in a Volume Flexible Inventory Model.” International Journal of Production Economics 105 (2): 548–559.
  • Secomandi, N. 2008. “An Analysis of the Control-algorithm Re-solving Issue in Inventory and Revenue Management.” Manufacturing & Service Operations Management 10: 468–483.
  • Senyigit, E., M. Dugenci, M. E. Aydin, and M. Zeydan. 2012. “Heuristic-based Neural Networks for Stochastic Dynamic Lot Sizing Problem.” Applied Soft Computing Journal. doi:10.1016/j.asoc.2012.02.026.
  • Sezen, B., and H. Kitapçi. 2007. “Spreadsheet Simulation for the Supply Chain Inventory Problem.” Production Planning & Control 18 (1): 9–15.
  • Shah, N. H., and A. S. Gor. 2009. “An Integrated Economic Lot-size Model for Vendor-buyer Inventory System When Input is Random.” Mathematical and Computer Modelling 49 (7–8): 1326–1330.
  • Shi, J., G. Zhang, and J. Sha. 2011. “Optimal Production Planning for a Multi-product Closed loop System with Uncertain Demand and Return.” Computers & Operations Research 38: 641–650.
  • Sinha, S., and S. P. Sarmah. 2010. “Single-vendor Multi-buyer Discount Pricing Model Under Stochastic Demand Environment.” Computers & Industrial Engineering 59 (4): 945–953.
  • Skintzi, G., G. Loannou, and G. Prastacos. 2008. “Investigating Warehousing Policies.” International Journal of Production Economics 112 (2): 955–970.
  • Sodhi, M. S. 2005. “Managing Demand Risk in Tactical Supply Chain Planning for a Global Consumer Electronics Company.” Production and Operations Management 14 (1): 69–79.
  • Sodhi, M. S., and C. S. Tang. 2009. “Modeling Supply-chain Planning Under Demand Uncertainty Using Stochastic Programming: A Survey Motivated by Asset-liability Management.” International Journal of Production Economics 121 (2): 728–738.
  • Song, Y., S. Ray, and S. Li. 2008. “Structural Properties of Buyback Contracts for Price-setting Newsvendors.” Manufacturing & Service Operations Management 10 (1): 1–18.
  • Song, D.-P., and J. Dinwoodie. 2008. “Quantifying the Effectiveness of VMI and Integrated Inventory Management in a Supply Chain with Uncertain Lead-times and Uncertain Demands.” Production Planning & Control 19 (6): 590–600.
  • Song, J.-S., C. A. Yano, and P. Lerssrisuriya. 2000. “Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty.” Manufacturing & Service Operations Management 2: 287–296.
  • Sounderpandian, J., S. Prasad, and M. Madan. 2008. “Supplies from Developing Countries: Optimal Order Quantities Under Loss Risks.” Omega 36 (1): 122–130.
  • Spinler, S., and A. Huchzermeier. 2006. “The Valuation of Options on Capacity with Cost and Demand Uncertainty.” European Journal of Operational Research 171 (3): 915–934.
  • Sting, F. J., and A. Huchzermeier. 2010. “Ensuring Responsive Capacity: How to Contract with Backup Suppliers.” European Journal of Operational Research 207 (2): 725–735.
  • Tajbakhsh, M. M., C. G. Lee, and S. Zolfaghari. 2010a. “On the Supplier Diversification Under Binomial Yield.” Operations Research Letters 38 (6): 505–509.
  • Tajbakhsh, M. M., C. G. Lee, and S. Zolfaghari. 2010b. “Sole Sourcing in EOQ Models with Binomial Yield.” Journal of Purchasing and Supply Management 16 (3): 163–170.
  • Taleizadeh, A. A., H.-M. Wee, and S. J. Sadjadi. 2010. “Multi-product Production Quantity Model with Repair Failure and Partial Backordering.” Computers & Industrial Engineering 59: 45–54.
  • Taleizadeh, A. A., S. T. A. Niaki, and A. A. Najafi 2010. “Multiproduct Single-machine Production System with Stochastic Scrapped Production Rate, Partial Backordering and Service Level Constraint.” Journal of Computational and Applied Mathematics 233: 1834–1849.
  • Tan, C. H., and J. C. Hartman. 2011. “Sensitivity Analysis in Markov Decision Processes with Uncertain Reward Parameters.” Journal of Applied Probability 48 (4): 954–967.
  • Tan, T., R. Güllü, and N. Erkip. 2009. “Using Imperfect Advance Demand Information in Ordering and Rationing Decisions.” International Journal of Production Economics 121 (2): 665–677.
  • Tang, C. S. 2006. “Perspectives in Supply Chain Risk Management.” International Journal of Production Economics 103 (2): 451–488.
  • Tang, O., and R. W. Grubbstrom. 2002. “Planning and Replanning the Master Production Schedule Under Demand Uncertainty.” International Journal of Production Economics 78 (3): 323–334.
  • Tang, J., D. Wang, and R. Y. K. Fung. 2000. “Fuzzy Formulation for Multi-product Aggregate Production Planning.” Production Planning & Control 11 (7): 670–676.
  • Tang, C. S., and R. Yin. 2007. “Responsive Pricing Under Supply Uncertainty.” European Journal of Operational Research 182 (1): 239–255.
  • Tapiero, C. S., and A. Grando. 2006. “Supply Risk and Inventory Outsourcing.” Production Planning & Control 17 (5): 534–539.
  • Tarim, S. A., and B. G. Kingsman. 2004. “The Stochastic Dynamic Production/Inventory Lot-sizing Problem with Service Level Constraints.” International Journal of Production Economics 88 (1): 105–119.
  • Taskin, S., and E. J. Lodree Jr. 2010. “Inventory Decisions for Emergency Supplies Based on Hurricane Count Predictions.” International Journal of Production Economics 126 (1): 66–75.
  • Teimoury, E., M. Modarres, F. Ghasemzadeh, and M. Fathi. 2010. “A Queueing Approach to Production–Inventory Planning for Supply Chain with Uncertain Demands: Case Study of Pakshoo Chemicals Company.” Journal of Manufacturing Systems 29 (2–3): 55–62.
  • Tempelmeier, H. 2006. “Supply Chain Inventory Optimization with Two Customer Classes in Discrete Time.” European Journal of Operational Research 174 (1): 600–621.
  • Tempelmeier, H. 2007. “On the Stochastic Uncapacitated Dynamic Single-item Lotsizing Problem with Service Level Constraints.” European Journal of Operational Research 181 (1): 184–194.
  • Tempelmeier, H., and S. Herpers. 2011. “Dynamic Uncapacitated Lot Sizing with Random Demand Under a Fillrate Constraint.” European Journal of Operational Research 212 (3): 497–507.
  • Teo, C. P., J. Ou, and M. Goh. 2001. “Impact on Inventory Costs with Consolidation of Distribution Centers.” IIE Transactions 33 (2): 99–110.
  • Teunter, R. H., and S. D. P. Flapper. 2011. “Optimal Core Acquisition and Remanufacturing Policies Under Uncertain Core Quality Fractions.” European Journal of Operational Research 210 (2): 241–248.
  • Thomas, D. J., and J. E. Tyworth. 2006. “Pooling Lead-time Risk by Order Splitting: A Critical Review.” Transportation Research Part E: Logistics and Transportation Review 42 (4): 245–257.
  • Ting, C. K., Y. S. P. Chiu, and C. C. H. Chan. 2011. “Optimal Lot Sizing with Scrap and Random Breakdown Occurring in Backorder Replenishing Period.” Mathematical & Computational Applications 16 (2): 329–339.
  • Tiwari, D., R. Patil, and J. Shah. 2011. “Unreliable Newsboy Problem with a Forecast Update.” Operations Research Letters 39 (4): 278–282.
  • Topaloglu, H. 2005. “An Approximate Dynamic Programming Approach for a Product Distribution Problem.” IIE Transactions 37: 697–710.
  • Torabi, S. A., and E. Hassini. 2008. “An Interactive Possibilistic Programming Approach for Multiple Objective Supply Chain Master Planning.” Fuzzy Sets and Systems 159: 193–214.
  • Tsang, K. H., N. J. Samsatli, and N. Shah. 2007. “Capacity Investment Planning for Multiple Vaccines Under Uncertainty: Capacity Planning.” Food and Bioproducts Processing 85 (C2): 120–128.
  • Vairaktarakis, G. L. 2000. “Robust Multi-item Newsboy Models with a Budget Constraint.” International Journal of Production Economics 66 (3): 213–226.
  • Váncza, J., and P. Egri. 2006. “Coordinating Supply Networks in Customized Mass Production: A Contract-based Approach.” CIRP Annals - Manufacturing Technology 55 (1): 489–492.
  • van Donselaar, K. H., and B. J. Gubbels. 2002. “How to Release Orders in Order to Minimise System Inventory and System Nervousness?” International Journal of Production Economics 78 (3): 335–343.
  • Vandaele, N., and L. De Boeck. 2003. “Advanced Resource Planning.” Robotics and Computer Integrated Manufacturing 19 (1–2): 211–218.
  • van Mieghem, J. A., and N. Rudi. 2002. “Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities.” Manufacturing & Service Operations Management 4: 313–335.
  • Vargas, V. 2009. “An Optimal Solution for the Stochastic Version of the Wagner–Whitin Dynamic Lot-size Model.” European Journal of Operational Research 198 (2): 447–451.
  • Vargas, V., and R. Metters. 2011. “A Master Production Scheduling Procedure for Stochastic Demand and Rolling Planning Horizons.” International Journal of Production Economics 132 (2): 296–302.
  • Wagner, M. R. 2011. “Online Lot-sizing Problems with Ordering, Holding and Shortage Costs.” Operations Research Letters 39 (2): 144–149.
  • Wagner, M., and S. R. Smits. 2004. “A Local Search Algorithm for the Optimization of the Stochastic Economic Lot Scheduling Problem.” International Journal of Production Economics 90 (3): 391–402.
  • Wang, X., W. Tang, and R. Zhao. 2007. “Fuzzy Economic Order Quantity Inventory Models without Backordering.” Tsinghua Science & Technology 12 (1): 91–96.
  • Wang, X., and W. Tang. 2009. “Optimal Production Run Length in Deteriorating Production Processes with Fuzzy Elapsed Time.” Computers & Industrial Engineering 56: 1627–1632.
  • Wang, Y., and Y. Gerchak. 2001. “Supply Chain Coordination When Demand is Shelf-space Dependent.” Manufacturing & Service Operations Management 3 (1): 82–87.
  • Wang, C.-H., and S.-H. Sheu. 2000. “Fast Approach to the Optimal Production/PM Policy.” Computers & Mathematics with Applications 40 (10–11): 1297–1314.
  • Wang, C.-H., and S.-H. Sheu. 2001. “The Effects of the Warranty Cost on the Imperfect EMQ Model with General Discrete Shift Distribution.” Production Planning & Control 12 (6): 621–628.
  • Wang, C. H., and S. H. Sheu. 2003a. “Determining the Optimal Production-maintenance Policy with Inspection Errors: Using a Markov Chain.” Computers & Operations Research 30 (1): 1–17.
  • Wang, C. H., and S. H. Sheu. 2003b. “Optimal Lot Sizing for Products Sold Under Free-repair Warranty.” European Journal of Operational Research 149 (1): 131–141.
  • Wang, T.-Y., and J.-M. Hu. 2010. “Heuristic Method on Solving an Inventory Model for Products with Optional Components Under Stochastic Payment and Budget Constraints.” Expert Systems with Applications 37: 2588–2598.
  • Wang, Y., and Y. Gerchak. 2003. “Capacity Games in Assembly Systems with Uncertain Demand.” Manufacturing & Service Operations Management 5 (3): 252–267.
  • Wang, J.-L. 2009. “A Supply Chain Application of Fuzzy Set Theory to Inventory Control Models – DRP System Analysis.” Expert Systems with Applications 36 (5): 9229–9239.
  • Wang, C.-H. 2010. “Technical Note: Some Remarks on an Optimal Order Quantity and Reorder Point When Supply and Demand are Uncertain.” Computers & Industrial Engineering 58: 809–813.
  • Wang, C.-H., and F.-C. Meng. 2009. “Optimal Lot Size and Offline Inspection Policy.” Computers & Mathematics with Applications 58: 1921–1929.
  • Wang, C.-H., and R. H. Yeh. 2009. “Utilizing an Approximative Solution to Obtain the Real Optimal Solution for a Production and Inspection Model.” Applied Mathematical Modelling 33 (10): 3769–3775.
  • Wanke, P. F., and E. Saliby. 2009. “Consolidation Effects: Whether and How Inventories should be Pooled.” Transportation Research Part E: Logistics and Transportation Review 45 (5): 678–692.
  • Wanke, P. F. 2009. “Consolidation Effects and Inventory Portfolios.” Transportation Research Part E: Logistics and Transportation Review 45 (1): 107–124.
  • Warburton, R. D. H. 2004. “An Analytical Investigation of the Bullwhip Effect.” Production and Operations Management 13 (2): 150–160.
  • Weng, Z. K., and T. McClurg. 2003. “Coordinated Ordering Decisions for Short Life Cycle Products with Uncertainty in Delivery Time and Demand.” European Journal of Operational Research 151 (1): 12–24.
  • Winands, E. M. M., I. J. B. F. Adan, and G. J. van Houtum. 2011. “The Stochastic Economic Lot Scheduling Problem: A Survey.” European Journal of Operational Research 210 (1): 1–9.
  • Wong, J.-T., C.-T. Su, and C.-H. Wang. 2012. “Stochastic Dynamic Lot-sizing Problem Using Bi-level Programming Base on Artificial Intelligence Techniques.” Applied Mathematical Modelling 36 (5): 2003–2016.
  • Wu, K. S. 2001. “A Mixed Inventory Model with Variable Lead Time and Random Supplier Capacity." Production Planning & Control 12 (4):353–361.
  • Wu, M.-C., L.-C. Huang, H.-M. Hsu, and T.-S. Su. 2011. “Multiple Lot-sizing Decisions in a Two-stage Production with an Interrupted Geometric Yield and Non-rigid Demand.” Journal of the Operational Research Society 62 (6): 1075–1084.
  • Wu, D. J., and P. R. Kleindorfer. 2005. “Competitive Options, Supply Contracting, and Electronic Markets.” Management Science 51 (3): 452–466.
  • Wu, K.-S., and L.-Y. Ouyang. 2000. “Defective Units in (Q, r, L) Inventory Model with Sub-lot Sampling Inspection.” Production Planning & Control 11 (2): 179–186.
  • Xiao, T., J. Jin, G. Chen, J. Shi, and M. Xie. 2010. “Ordering, Wholesale Pricing and Lead-time Decisions in a Three-stage Supply Chain Under Demand Uncertainty.” Computers & Industrial Engineering 59 (4): 840–852.
  • Xie, J., X. Zhao, and T. S. Lee. 2003. “Freezing the Master Production Schedule Under Single Resource Constraint and Demand Uncertainty.” International Journal of Production Economics 83 (1): 65–84.
  • Xie, J., T. S. Leeb, and X. Zhao. 2004. “Impact of Forecasting Error on the Performance of Capacitated Multi-item Production Systems.” Computers & Industrial Engineering 46: 205–219.
  • Xu, H. 2010. “Managing Production and Procurement through Option Contracts in Supply Chains with Random Yield.” International Journal of Production Economics 126 (2): 306–313.
  • Xu, J., and L. Zhao. 2008. “A Class of Fuzzy Rough Expected Value Multi-objective Decision Making Model and its Application to Inventory Problems.” Computers & Mathematics with Applications 56 (8): 2107–2119.
  • Xu, J., and L. Zhao. 2010. “A Multi-objective Decision-making Model with Fuzzy Rough Coefficients and its Application to the Inventory Problem.” Information Sciences 180 (5): 679–696.
  • Yan, H., and S.-L. Tang. 2009. “Pre-distribution and Post-distribution Cross-docking Operations.” Transportation Research Part E 45: 843–859.
  • Yan, H.-S. 2003. “Practical Solution Approaches to Solve a Hierarchical Stochastic Production Planning Problem in a Flexible Automated Workshop in China.” IIE Transactions 35 (2): 103–115.
  • Yan, H., K. Liu, and A. Hsu. 2003. “Optimal Ordering in a Dual-supplier System with Demand Forcast Updates.” Production and Operations Management 12 (1): 30–45.
  • Yang, S., J. Yang, and L. Abdelmalek. 2007. “Sourcing with Random Yields and Stochastic Demand: A Newsvendor Approach.” Computers & Operations Research 34 (12): 3682–3690.
  • Yano, C. A., and H. L. Lee. 1995. “Lot Sizing with Random Yields: A Review.” Operations Research 43 (2): 311–334.
  • Yao, C., and C. G. Cassandras. 2012. “A Solution to the Optimal Lot-sizing Problem as a Stochastic Resource Contention Game.” IEEE Transactions on Automation Science and Engineering 9 (2): 250–264.
  • Yeh, R. H. , and T. H. Chen. 2006. “Optimal Lot Size and Inspection Policy for Products Sold with Warranty.” European Journal of Operational Research 174 (2): 766–776.
  • Yue, J., J. Austin, M.-C. Wang, and Z. Huang. 2006. “Coordination of Cooperative Advertising in a Two-level Supply Chain When Manufacturer Offers Discount.” European Journal of Operational Research 168 (1): 65–85.
  • Yue, X., S. K. Mukhopadhyay, and X. Zhu. 2006. “A Bertrand Model of Pricing of Complementary Goods under Information Asymmetry.” Journal of Business Research 59 (10–11): 1182–1192.
  • Zeng, A. Z. 2001. “A Partial Backordering Approach to Inventory Control.” Production Planning & Control 12 (7): 660–668.
  • Zeydan, M., and A. Allahverdi. 2006. “Economic Order Quantity with Uncertain Inflation: A Case Study.” International Journal of Industrial Engineering: Theory Applications and Practice 13 (3): 320–327.
  • Zhang, X. 2004. “Technical Note: Evolution of ARMA Demand in Supply Chains.” Manufacturing & Service Operations Management 6 (2): 195–198.
  • Zhang, M. 2011. “Two-stage Minimax Regret Robust Uncapacitated Lot-sizing Problems with Demand Uncertainty.” Operations Research Letters 39 (5): 342–345.
  • Zhang, C., R. Zhao, and W. Tang. 2009. “Optimal Run Lengths in Deteriorating Production Processes in Random Fuzzy Environments.” Computers & Industrial Engineering 57 (3): 941–948.
  • Zhao, X. 2008. “Coordinating a Supply Chain System with Retailers Under Both Price and Inventory Competition.” Production and Operations Management 17 (5): 532–542.
  • Zhou, Z., and Y. Guan. 2010. “Stochastic Lot-sizing Problem with Deterministic Demands and Wagner–Whitin Costs.” Operations Research Letters 38 (5): 414–419.
  • Zikopoulos, C., and G. Tagaras. 2007. “Impact of Uncertainty in the Quality of Returns on the Profitability of a Single-period Refurbishing Operation.” European Journal of Operational Research 182 (1): 205–225.
  • Zimmer, K. 2002. “Supply Chain Coordination with Uncertain Just-in-time Delivery.” International Journal of Production Economics 77 (1): 1–15.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.