References
- Box, G. E. P., and T. Kramer. 1992. “Statistical Process Monitoring and Feedback Adjustment – A Discussion.” Technometrics 34 (3): 251–267.
- Box, G. E. P., G. M. Jenkins, and G. C. Reinsel. 1994. Time Series Analysis: Forecasting and Control. Englewood Cliffs, NJ: Prentice-Hall.
- Butler, S. W., and J. A. Stefani. 1994. “Supervisory Run-to-run Control of Polysilicon Gate Etch Using in Situ Ellipsometry.” IEEE Transactions on Semiconductors Manufacturing 7 (2): 193–201.
- Camacho, J., and J. Pico. 2006. “Online Monitoring of Batch Processes Using Multi-phase Principal Component Analysis.” Journal of Process Control 16 (10): 1021–1035.
- Chen, J. H., and K. C. Liu. 2002. “On-line Batch Process Monitoring Using Dynamic PCA, and Dynamic PLS Models.” Chemical Engineering Science 57 (1): 63–75.
- Chen, M., C. S. Jiang, and Q. X. Wu. 2008. “Sensor Fault Diagnosis for a Class of Time Delay Uncertain Nonlinear Systems using Neural Network.” International Journal of Automation and Computing 5 (4): 401–405.
- Chen, J., J. Munoz, and N. Cheng. 2012. “Deterministic and Stochastic Model Based Run-to-run Control for Batch Processes with Measurement Delays of Uncertain Duration.” Journal of Process Control 22 (2): 508–517.
- Chiang, L. H., E. L. Russell, and R. D. Braatz. 2001. Fault Detection and Diagnosis in Industrial Systems. London: Springer.
- Dunia, R., J. Qin, T. F. Edgar, and T. J. McAvoy. 1996. “Sensor Fault Identification and Reconstruction Using Principal Component Analysis.” AICHE 42 (10): 2797–2812.
- Good, R., and S. J. Qin. 2002. “Stability Analysis of Double EWMA Run-to-run Control with Metrology Delay.” Proceedings of American Control Conference, 2156–2161, Anchorage, AK.
- Good, R. P., and S. J. Qin. 2006. “On the stability of MIMO EWMA Run-to-run Controllers with Metrology Delay.” IEEE Transactions on Semiconductor Manufacturing 19 (1): 78–86.
- Ingolfsson, A., and E. Sachs. 1993. “Stability and Sensitivity of an EWMA Controller.” Journal of Quality Technology 25: 271–287.
- Jackson, J. E. 1991. A User’s Guide to Principal Components. New York: Wiley.
- Jin, M., and F. Tsung. 2009. “Smith-EWMA Run-to-run Control Schemes for a Process with Measurement Delay.” IIE Transactions 41 (4): 346–358.
- Ketelaerea, B. D., K. Mertensa, F. Mathijsa, D. S. Diaz, and J. D. Baerdemaeker. 2011. “Nonstationarity in Statistical Process Control-issues, Cases, Ideas.” Applied Stochastic Models in Business and Industry 27 (4): 367–376.
- Ku, W., R. H. Storer, and C. Georgakis. 1995. “Disturbance Detection and Isolation By Gynamic Principal Component Analysis.” Chemometrics and Intelligent Laboratory Systems 30 (1): 179–196.
- Lin, S. Y., and S. C. Hong. 2006. “A Classification-based Fault Detection and Isolation Scheme for the Ion Implanter.” IEEE Transactions on Semiconductor Manufacturing 19 (4): 411–424.
- Liu, T., F. Gao, and Y. Wang. 2010. “IMC-based Iterative Learning Control for Batch Processes with Uncertain Time Delay.” Journal of Process Control 20 (2): 173–180.
- McCray, A. T., J. McNames, and D. Abercrombie. 2005. “Locating Disturbances in Semiconductor Manufacturing With Stepwise Regression.” IEEE Transactions on Semiconductor Manufacturing 18 (3): 458–468.
- Moyne, J., E. D. Castillo, and A. M. Hurwitz. 2001. Run-to-run Control in Semiconductor Manufacturing. Boca Raton, FL: CRC Press.
- Ono, T., T. Kumamaru, A. Maeda, S. Sagara, and K. Kumamaru. 1987. “Influence Matrix Approach to Fault Diagnosis of Parameters in Dynamic Systems.” IEEE Transactions on Industrial Electronics 34 (2): 285–291.
- Palma, L. Brito, F. Vieira Coito, and R. Neves-Silva. 2005. “Diagnosis of Parametric Faults Based on Identification and Statistical Methods.” 44th IEEE Conference on Decision and Control, and European Control Conference, 3838–3843. Seville, Spain: Joint CDC-ECC.
- Poshtan, J., R. Doraiswami, and M. Stevenson. 1997. “A Real-time Fault Diagnosis and Parameter Tracking Scheme.” Proceedings of the American Control Conference, 483–487, New Mexico, USA.
- Ranner, S., J. F. MacGregor, and S. World. 1998. “Adaptive Batch Monitoring Using Hierarchical PCA.” Chemometrics and Intelligent Laboratory Systems 41 (1): 73–81.
- Tseng, S. T., R. J. Chou, and S. P. Lee. 2002. “Statistical Design of Double EWMA Controller.” Stochastic Models in Business and Industry 18 (3): 313–322.
- Tsung, F. 2000. “Statistical Monitoring and Diagnosis of Automatic Controlled Processes Using Dynamic PCA.” International Journal of Production Research 38 (3): 625–637.
- Wang, J., Q. P. He, S. J. Qin, C. A. Bode, and M. A. Purdy. 2005. “Recursive Least Squares Estimation for Run-to-run Control With Metrology Delay and Its Application to STI Etch Process.” IEEE Transactions on Semiconductor Manufacturing 18 (2): 309–319.
- Yang, H. T., C. M. Huang, and C. L. Huang. 1996. “Identification of ARMAX Model for Short Term Load Forecasting: An Evolutionary Programming Approach.” IEEE Transactions on Power Systems 11 (1): 403–408.
- Yao, Y., Y. H. Diao, N. Y. Lu, J. Lu, and F. R. Gao. 2009. “Two-dimensional Dynamic Principal Component Analysis with Autodetermine Support Region.” Industrial & Engineering Chemistry Research 48 (2): 837–843.
- You, F. Q., Z. H. Tian, and S. J. Shi. 2005. “Robust Fault Diagnosis for Linear Time-delay Systems with Uncertainty.” In Proceedings of American Control Conference, 1666–1671, Portland.
- Yu, J. 2011. “Fault Detection Using Principal Components-based Gaussian Mixture Model for Semiconductor Manufacturing Processes.” IEEE Transactions on Semiconductor Manufacturing 24 (3): 432–444.
- Zhang, J., C. C. Chu, J. Munoz, and J. Chen. 2009. “Minimum Entropy Based Run-to-run Control for Semiconductor Processes with Uncertain Metrology Delay.” Journal of Process Control 19 (10): 1688–1697.