266
Views
5
CrossRef citations to date
0
Altmetric
Articles

A piecewise nonlinear model for a production system under maintenance, trade credit and limited warehouse space

Pages 3052-3073 | Received 16 Oct 2012, Accepted 24 Oct 2013, Published online: 03 Dec 2013

References

  • Balkhi, Z. T.. 2011. “Optimal Economic Ordering Policy with Deteriorating Items Under Different Supplier Trade Credits for Finite Horizon Case.” International Journal of Production Economics 133 (1): 216–223.
  • Chang, C. T., J. T. Teng, and M. S. Chern. 2010. “Optimal manufacturer’s Replenishment Policies for Deteriorating Items in a Supply Chain with Up-stream and Down-stream Trade Credits.” International Journal of Production Economics 127 (1): 197–202.
  • Chung, K. J., and Y. F. Huang. 2003. “The Optimal Cycle Time for EPQ Inventory Model Under Permissible Delay in Payments.” International Journal of Production Economics 84: 307–318.
  • Chung, K. J., and Y. F. Huang. 2006. “Retailer’s Optimal Cycle times in the EOQ Model with Imperfect Quality and a Permissible Credit Period.” Quality and Quantity 40: 59–77.
  • Goyal, S. K. 1985. “Economics Order Quantity Under Conditions of Permissible Delay in Payments.” Journal of the Operational Research Society 36: 335–338.
  • Huang, Y. F. 2003. “Optimal Retailer’s Ordering Policies in the EOQ Model Under Trade Credit Financing.” Journal of the Operational Research Society 54: 1011–1015.
  • Huang, Y. F. 2006. “An Inventory Model Under Two Levels of Trade Credit and Limited Storage Space Derived Without Derivatives.” Apply Mathematical Modelling 30: 418–436.
  • Huang, Y. F. 2007. “Optimal Retailer’s Replenishment Decisions in the EPQ Model Under Two Levels of Trade Credit Policy.” European Journal of Operational Research 176: 1577–1591.
  • Huang, Y. F., and K. J. Chung. 2003. “Optimal Replenishment and Payment Policies in the EOQ Model Under Cash Discount and Trade Credit.” Asia-Pacific Journal of TheOperational Research 20: 177–190.
  • Liao, J. J. 2008. “An EOQ Model with Noninstantaneous Receipt and Exponentially Deteriorating Items under Two-level Trade Credit.” International Journal of Production Economics 113: 852–861.
  • Ouyang, L. Y., C. T. Chang, and J. T. Teng. 2005. “An EOQ Model for Deteriorating Items Under Trade Credits.” Journal of the Operational Research Society 56: 719–726.
  • Ouyang, L. Y., C. T. Chang, and J. T. Teng. 2006. “An Study on an Inventory Model for Non-instantaneous Deteriorating Item with Permissible Delay in Payments.” Computers and Industrial Engineering 51: 637–651.
  • Ouyang, L. Y., C. H. Ho, and C. H. Su. 2008. “Optimal Strategy for an Integrated System with Variable Production Rate When the Freight Rate and Trade Credit Are Both Linked to the Order Quantity.” International Journal of Production Economics 115: 151–162.
  • Ouyang, L. Y., J. T. Teng, S. K. Goyal, and C. T. Yang. 2009. “An Economic Order Quantity Model for Deteriorating Items with Partially Permissible Delay in Payments Linked to Order Quantity.” European Journal of Operational Research 194: 418–431.
  • Pan, E., Y. Jin, S. Wang, and T. Cang. 2012. “An Integrated EPQ Model Based on a Control Chart for an Imperfect Production Process.” International Journal of Production Research 50: 6999–7011.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2012a. “A Three Layer Multi-item Production–Inventory Model for Multiple Suppliers and Retailers.” Economic Modelling 29: 2704–2710.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2012b. “A Multi-Echelon Supply Chain Model for Reworkable Items in Multiple-markets with Supply Disruption.” Economic Modelling 29: 1891–1898.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2012c. “Three-layer Supply Chain – A Production-inventory Model for Reworkable Items.” Applied Mathematics and Computation 219: 530–543.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2013a. “Three Stage Trade Credit Policy in a Three-layer Supply Chain – A Production-inventory Model.” International Journal of Systems Science. doi:101080/002077212012757383.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2013b. “A Mathematical Model on EPQ for Stochastic Demand in an Imperfect Production System.” Journal of Manufacturing Systems 32: 260–270.
  • Pal, B., S. S. Sana, and K. Chaudhuri. 2013c. “Maximising Profits for an EPQ Model with Unreliable Machine and Rework of Random Defective Items.” International Journal of Systems Science 44: 582–594.
  • Porteus, E. L. 1986. “Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction.” Operations Research 34: 137–144.
  • Rosenblatt, M. J., and H. L. Lee. 1986. “Economic Production Cycle with Imperfect Production Process.” IIE Transactions 18: 48–55.
  • Roy, M. D., S. S. Sana, and K. Chaudhuri. 2011. “An Optimal Shipment Strategy for Imperfect Items in a Stock-out Situation.” Mathematical and Computer Modelling 54: 2528–2543.
  • Sana, S. S., and K. Chaudhuri. 2008. “A Deterministic EOQ Model with Delays in Payments and Price-discount Offers.” European Journal of Operational Research 184: 509–533.
  • Sana, S. S., and K. Chaudhuri. 2010. “An EMQ Model in an Imperfect Production Process.” International Journal of Systems Science 41: 635–646.
  • Sana, S. S. 2010a. “A Production-inventory Model in an Imperfect Production Process.” European Journal of Operational Research 200: 451–464.
  • Sana, S. S. 2010b. “An Economic Production Lot Size Model in an Imperfect Production System.” European Journal of Operational Research 201: 158–170.
  • Sana, S. S. 2011. “A Production-inventory Model of Imperfect Quality Products in a Three-layer Supply Chain.” Decision Support Systems 50: 539–547.
  • Sana, S. S. 2012a. “A Collaborating Inventory Model in a Supply Chain.” Economic Modelling 29: 2016–2023.
  • Sana, S. S. 2012b. “Preventive Maintenance and Optimal Buffer Inventory for Products Sold with Warranty in an Imperfect Production System.” International Journal of Production Research 50: 6763–6774.
  • Sana, S. S. 2012c. “An Economic Order Quantity Model for Nonconforming Quality Products.” Service Science 4: 331–348.
  • Sana, S. S. 2013. “Optimal Contract Strategies for Two Stage Supply Chain.” Economic Modelling 30: 253–260.
  • Sarkar, B., S. S. Sana, and K. Chaudhuri. 2011. “An Imperfect Production Process for Time Varying Demand with Inflation and Time Value of Money – An EMQ Model.” Expert Systems with Applications 38: 13543–13548.
  • Sheen, G. J., and Y. C. Tsao. 2007. “Channel Coordination, Trade Credit and Quantity Discounts for Freight Cost.” Transportation Research Part E: Logistics and Transportation Review 43: 112–128.
  • Teng, J. T. 2002. “On the Economic Order Quantity Under Conditions of Permissible Delay in Payments.” Journal of the Operational Research Society 53: 915–918.
  • Teng, J. T., and C. T. Chang. 2009. “Optimal Manufacturer’s Replenishment Policies in the EPQ Model Under Two Levels of Trade Credit Policy.” European Journal of Operational Research 195: 358–363.
  • Teng, J. T., J. Chen, and S. K. Goyal. 2009. “A Comprehensive Note on: An Inventory Model under Two Levels of Trade Credit and Limited Storage Space Derived without Derivatives.” European Journal of Operational Research 33: 4388–4396.
  • Tsao, Y. C. 2009. “Production and Payment Policies for an Imperfect Manufacturing System with Machine Maintenance and Credit Policies.” International Journal of Technology Management 48 (2): 240–257.
  • Tsao, Y. C. 2010. “Two-phase Pricing and Inventory Management for Deteriorating and Fashion Goods Under Trade Credit.” Mathematical Methods of Operations Research 72 (1): 107–127.
  • Tsao, Y. C., and G. J. Sheen. 2008. “Dynamic Pricing, Promotion and Replenishment Policies for a Deteriorating Item Under Permissible Delay in Payments.” Computers and Operations Research 35: 3562–3580.
  • Tsao, Y. C., and G. J. Sheen. 2012. “A Multi-item Supply Chain with Credit Period and Weight Freight Cost Discounts.” International Journal of Production Economics 135 (1): 106–115.
  • Tsao, Y. C., T. H. Chen, and Q. H. Zhang. 2013. “Effects of Maintenance Policy on an Imperfect Production System under Trade Credit.” International Journal of Production Research 51: 1549–1562.
  • Wee, H. M., W. T. Wang, and P. C. Yang. 2013. “A Production Quantity Model for Imperfect Quality Items with Shortage and Screening Constraint.” International Journal of Production Research 51 (6): 1869–1884.
  • Wee, H. M., and G. A. Widyadana. 2012. “Economic Production Quantity Models for Deteriorating Items with Rework and Stochastic Preventive Maintenance Time.” International Journal of Production Research 50 (11): 2940–2952.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.