1,043
Views
34
CrossRef citations to date
0
Altmetric
Articles

A critical chain project scheduling method based on a differential evolution algorithm

&
Pages 3940-3949 | Received 10 Apr 2013, Accepted 30 Oct 2013, Published online: 06 Dec 2013

References

  • Bevilacqua, M., F. E. Ciarapica, and G. Giacchetta. 2009. “Critical Chain and Risk Analysis Applied to High-risk Industry Maintenance: A Case Study.” International Journal of Project Management 27 (4): 419–432.
  • Bie, L., N. Cui, and X. Zhang. 2012. “Buffer Sizing Approach with Dependence Assumption between Activities in Critical Chain Scheduling.” International Journal of Production Research 50 (24): 7343–7356.
  • Blackstone Jr, J. H., J. F. Cox III, and J. G. Schleier Jr. 2009. “A Tutorial on Project Management from a Theory of Constraints Perspective.” International Journal of Production Research 47 (24): 7029–7046.
  • Damak, N., B. Jarboui, P. Siarry, and T. Loukil. 2009. “Differential Evolution for Solving Multi-mode Resource-constrained Project Scheduling Problems.” Computers & Operations Research 36 (9): 2653–2659.
  • Goldratt, E. M. 1997. Critical Chain. Great Barrington, MA: North River Press.
  • Hartmann, S. 1998. “A Competitive Genetic Algorithm for Resource-constrained Project Scheduling.” Naval Research Logistics 5 (7): 733–750.
  • Herroelen, W., and R. Leus. 2001. “On the Merits and Pitfalls of Critical Chain Scheduling.” Journal of Operations Management 19 (5): 559–577.
  • Herroelen, W., and R. Leus. 2005. “Project Scheduling under Uncertainty: Survey and Research Potentials.” European Journal of Operational Research 165 (2): 289–306.
  • Hoel, K., and S. G. Taylor. 1999. “Quantifying Buffers for Project Schedules.” Production and Inventory Management Journal 40: 43–47.
  • Kolisch, R. 1996. “Serial and Parallel Resource-constrained Project Scheduling Methods Revisited: Theory and Computation.” European Journal of Operational Research 90 (2): 320–333.
  • Kolisch, R., and A. Sprecher. 1997. “PSPLIB-a Project Scheduling Problem Library: OR Software-ORSEP Operations Research Software Exchange Program.” European Journal of Operational Research 96 (1): 205–216.
  • Leach, L. P. 1999. “Critical Chain Project Management Improves Project Performance.” Project Management Journal 30: 39–51.
  • Leach, L. P. 2005. Critical Chain Project Management. 2nd ed. London: Artech House Inc.
  • Liu, S. X., J. H. Song, and J. F. Tang. 2006. “Approach for Setting Time Buffers in Resources-constrained Project Scheduling.” [In Chinese.] Journal of Systems Engineering 21 (4): 381.
  • Lorenzoni, L. L., H. Ahonen, and A. G. D. Alvarenga. 2006. “A Multi-mode Resource-constrained Scheduling Problem in the Context of Port Operations.” Computers & Industrial Engineering 50 (1): 55–65.
  • Ma, G., and J. You. 2006. “The Applicability Analysis of Estimating Project Activity Duration.” [In Chinese.] Industrial Engineering and Management 5: 95–98.
  • Mohamed, A. W., and H. Z. Sabry. 2012. “Constrained Optimization Based on Modified Differential Evolution Algorithm.” Information Sciences 194: 171–208.
  • Newbold, R. C. 1998. Project Management in the Fast Lane: Applying the Theory of Constraints (Vol. 6). CRC Press.
  • Paté-Cornell, M. E., and R. L. Dillon. 2001. “Success Factors and Future Challenges in the Management of Faster–Better–Cheaper Projects: Lessons Learned from NASA.” Engineering Management, IEEE Transactions on 48 (1): 25–35.
  • Rabbania, M., S. M. T. Fatemi Ghomib, F. Jolaia, and N. S. Lahijia. 2007. “A New Heuristic for Resource-constrained Project Scheduling in Stochastic Networks Using Critical Chain Concept.” European Journal of Operational Research 176: 794–808.
  • Rahimi, A., H. Karimi, and B. Afshar-Nadjafi. 2013. “Using Meta-heuristics for Project Scheduling under Mode Identity Constraints.” Applied Soft Computing 13: 2124–2135.
  • Rand, G. K. 2000. “Critical Chain: The Theory of Constraints Applied to Project Management.” International Journal of Project Management 18 (3): 173–177.
  • Rizzo, T. 1999. “Operational Measurements for Product Development Organizations — Part 2.” PM Magazine 13: 31–35.
  • Steyn, H. 2002. “Project Management Applications of the Theory of Constraints beyond Critical Chain Scheduling.” International Journal of Project Management 20 (1): 75–80.
  • Storn, R. 2008. “Differential Evolution Research–trends and Open Questions.” In Advances in Differential Evolution, edited by U. K. Chakraborty, 1–31. Berlin: Springer.
  • Storn, R., and K. Price. 1997. “Differential Evolution – A Simple and Efficient Heuristic for Global Optimization over Continuous Spaces.” Journal of Global Optimization 11 (4): 341–359.
  • Tukel, O. I., W. O. Rom, and S. D. Eksioglu. 2006. “An Investigation of Buffer Sizing Techniques in Critical Chain Scheduling.” European Journal of Operational Research 172 (2): 401–416.
  • Wei, C. C., P. H. Liu, and Y. C. Tsai. 2002. “Resource-constrained Project Management Using Enhanced Theory of Constraint.” International Journal of Project Management 20 (7): 561–567.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.