Discrete electromagnetism-like mechanism algorithm for assembly sequences planning

, , &
Pages 3485-3503 | Received 04 Jun 2012, Accepted 01 Nov 2013, Published online: 22 Jan 2014

References

  • Akagi, F., H. Osaki, and S. Kikuci. 1980. “The Method of Analysis of Assembly Work Based on the Fastener Method.” Bulletin of the JSME 23 (184): 1670–1675.10.1299/jsme1958.23.1670
  • Ali, M. M., and M. Golalikhani. 2010. “An Electromagnetism-like Method for Nonlinearly Constrained Global Optimization.” Computer and Mathematics with Application 60 (8): 2279–2285.10.1016/j.camwa.2010.08.018
  • Alkin, Y., and E. Erdal. 2010. “A New Hybrid Electromagnetism-like Algorithm for Capacitated Vehicle Routing Problems.” Expert Systems with Applications 37 (4): 3427–3433.
  • Birbil, S., and S. C. Fang. 2003. “An Electromagnetism-like Mechanism for Global Optimization.” Journal of Global Optimization 25 (3): 263–282.10.1023/A:1022452626305
  • Chang, P. C., S. H. Chen, and C. Y. Fan. 2009. “A Hybrid Electromagnetism-like Algorithm for Single Machine Scheduling Problem.” Expert Systems with Applications 36 (2): 1259–1267.10.1016/j.eswa.2007.11.050
  • Chang, C. C., H. E. Tseng, and L. P. Meng. 2009. “Artificial Immune Systems for Assembly Sequence Planning Exploration.” Engineering Applications of Artificial Intelligence 22 (8): 1218–1232.10.1016/j.engappai.2009.04.007
  • Chen, W. C., Y. Y. Hsu, L. P. Hsieh, and P. H. Tai. 2010. “A Systematic Optimization Approach for Assembly Sequence Planning Using Taguchi Method, DOE, and BPNN.” Expert Systems with Applications 37 (1): 716–726.10.1016/j.eswa.2009.05.098
  • Chen, R. S., K. Y. Lu, and S. C. Yu. 2002. “A Hybrid Genetic Algorithm Approach on Multi-objective of Assembly Planning Problem.” Engineering Applications of Artificial Intelligence 15 (5): 447–457.10.1016/S0952-1976(02)00073-8
  • Cuevas, E., D. Oliva, D. Zaldivar, P. C. Marco, and H. Sossa. 2012. “Circle Detection Using Electro-magnetism Optimization.” Information Sciences: An International Journal 182 (1): 40–55.
  • Dong, T. Y., R. F. Tong, L. Zhang, and J. X. Dong. 2005. “A Collaborative Approach to Assembly Sequence Planning.” Advanced Engineering Informatics 19 (2): 155–268.10.1016/j.aei.2005.05.008
  • De Fazio, T. L., and D. E. Whitney. 1987. “Simplified Generation of all Mechanical Assembly Sequences.” IEEE Transactions on Robotics and Automation 3 (6): 640–658.
  • Gao, L., W. R. Qian, X. Y. Li, and J. F. Wang. 2010. “Application of Memetic Algorithm in Assembly Sequence Planning.” International Journal of Advanced Manufacturing Technology 49: 1175–1184.10.1007/s00170-009-2449-1
  • Gui, J. K., and M. Mäntylä. 1994. “Functional Understanding of Assembly Modeling.” Computer-Aided Design 26 (6): 435–451.10.1016/0010-4485(94)90066-3
  • Homem de Mello, L. S., and A. C. Sanderson. 1991. “A Correct and Complete Algorithm for the Generation of Mechanical Assembly Sequences.” IEEE Transactions on Robotics and Automation 7 (2): 228–240.10.1109/70.75905
  • Hong, D. S., and H. S. Cho. 1995. “A Neural-network-based Computational Scheme for Generating Optimized Robotic Assembly Sequences.” Engineering Applications of Artificial Intelligence 8 (2): 129–145.10.1016/0952-1976(94)00068-X
  • Hong, D. S., and H. S. Cho. 1997. “Generation of Robotic Assembly Sequences with Consideration of Line Balancing Using Simulated Annealing.” Robotica 15 (6): 663–673.10.1017/S0263574797000799
  • Kroll, E. 1994. “Intelligent Assembly Planning on Triaxial Products.” Concurrent Engineering: Research and Applications 1 (2): 311–319.
  • Lai, X. M., Y. F. Xing, J. Sun, and G. L. Chen. 2009. “Optimisation of Assembly Sequences for Compliant Body Assemblies.” International Journal of Production Research 47 (21): 6129–6143.10.1080/00207540802172037
  • Li, J. R., L. P. Khoo, and S. B. Tor. 2003. “A Tabu-enhanced Genetic Algorithm Approach for Assembly Process Planning.” Journal of Intelligent Manufacturing 14 (2): 197–208.10.1023/A:1022903514179
  • Liu, H. C., L. Gao. 2010. “A Discrete Electromagnetism-like Mechanism for Solving Distributed Permutation Flowshop Scheduling Problem.” In Proceeding of International Conference on Manufacturing Automation, 156–163. December 13–15, Hong Kong.
  • Naji-Azimi, Z., P. Toth, and L. Galli. 2010. “An Electromagnetism Metaheuristic for the Unicost Set Covering Problem.” European Journal of Operational Research 205 (2): 290–300.10.1016/j.ejor.2010.01.035
  • Qu, B., and K. Weng. 2009. “Path Relinking Approach for Multiple Allocation Hub Maximal Covering Problem.” Computers and Mathematics with Applications 57 (11–12): 1890–1894.10.1016/j.camwa.2008.10.004
  • Romeo, M. M., H. L. Lee, and A. Kazem. 2003. “Assembly Sequence Planning and Optimization Using Genetic Algorithms: Part I. Automatic Generation of Feasible Assembly Sequences.” Applied Soft Computing 2 (3): 223–253.
  • Shan, H. B., S. X. Li, D. G. Gong, P. Lou. 2006. “Genetic Simulated Annealing Algorithm-based Assembly Sequence Planning.” International Technology and Innovation Conference 2006 (ITIC 2006) CP 524: 1573–1579.10.1049/cp:20061017
  • Su, C. T., and H. C. Lin. 2011. “Applying Electromagnetism-like Mechanism for Feature Selection.” Information Sciences 181 (5): 972–986.10.1016/j.ins.2010.11.008
  • Swaminnathan, A., and K. S. Barber. 1996. “An Experience-based Assembly Sequence Planner for Mechanical Assemblies.” IEEE Transactions on Robotics and Automation 12 (2): 252–267.10.1109/70.488945
  • Tavakkoli-Moghaddam, R., M. Khalili, and B. Naderi. 2009. “A Hybridization of Simulated Annealing and Electromagnetic-like Mechanism for Job Shop Problems with Machine Availability and Sequence-dependent Setup Times to Minimize Total Weighted Tardiness.” Soft Computing 13 (10): 995–1006.10.1007/s00500-008-0367-z
  • Tseng, H. E. 2006. “Guided Genetic Algorithms for Solving the Larger Constraint Assembly Problem.” International Journal of Production Research 44 (3): 601–625.10.1080/00207540500270513
  • Tseng, Y. J., J. Y. Chen, and F. Y. Huang. 2010a. “A Particle Swarm Optimisation Algorithm for Multi-plant Assembly Sequence Planning with Integrated Assembly Sequence Planning and Plant Assignment.” International Journal of Production Research 48 (10): 2765–2791.10.1080/00207540902791835
  • Tseng, Y. J., J. Y. Chen, and F. Y. Huang. 2010b. “Integrated Assembly and Disassembly Sequence Planning Using a GA Approach.” International Journal of Production Research 48 (20): 5991–6013.10.1080/00207540903229173
  • Tseng, H. E., and R. K. Li. 1999. “A Novel Means of Generating Assembly Sequences Using the Connector Concept.” Journal of Intelligent Manufacturing 10 (5): 423–435.10.1023/A:1008971030395
  • Tseng, H. E., J. D. Li, and Y. H. Chang. 2004. “Connector-based Approach to Assembly Planning using Genetic Algorithms.” International Journal Production Research 42 (11): 2243–2261.10.1080/0020754042000203894
  • Tseng, H. E., W. P. Wang, and H. Y. Shih. 2007. “Using Memetic Algorithms with Guided Local Search to Solve Assembly Sequence Planning.” Expert Systems with Applications 33 (2): 451–467.10.1016/j.eswa.2006.05.025
  • Vallada, E., and R. Ruiz. 2010. “Genetic Algorithms with Path Relinking for the Minimum Tardiness Permutation.” Omega 38 (1–2): 57–67.10.1016/j.omega.2009.04.002
  • Wu, Q., C. J. Zhang, L. Gao, and X. Y. Li. September 2010. “Training Neural Networks by Electromagnetism-like Mechanism Algorithm for Tourism Arrivals Forecasting.” In Proceeding of the IEEE Fifth International Conference on Bio-Inspired Computing: Theories and Applications, 679–688. Changsha.
  • Xing, Y. F., and Y. S. Wang. 2012. “Assembly Sequence Planning Based on a Hybrid Particle Swarm Optimisation and Genetic Algorithm.” International Journal of Production Research 50 (24): 7303–7312.10.1080/00207543.2011.648276
  • Yuan, K., S. Henequin, X. J. Wang, L. Gao. May 2006. “A New Heuristic – EM for Permutation Flowshop Scheduling.” In Proceedings of the 12th IFAC Symposium on Information Control Problems in Manufacturing. Saint-Etienne.
  • Zha, X. F., Y. Samuel, and S. C. Fok. 1998. “Integrated Knowledge-based Assembly Sequence Planning.” International Journal of Advanced Manufacturing Technology 14 (1): 50–64.10.1007/BF01179417

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.