594
Views
33
CrossRef citations to date
0
Altmetric
Articles

A manufacturing resource allocation method with knowledge-based fuzzy comprehensive evaluation for aircraft structural parts

, , , &
Pages 3239-3258 | Received 28 May 2013, Accepted 18 Nov 2013, Published online: 16 Dec 2013

References

  • Asady, B., and A. Zendehnam. 2007. “Ranking Fuzzy Numbers by Distance Minimization.” Applied Mathematical Modelling 31 (11): 2589–2598.
  • Chowdary, B. V., and S. Muthineni. 2012. “Selection of a Flexible Machining Centre through a Knowledge Based Expert System.” Global Journal of Flexible Systems Management 13 (1): 3–10.
  • Cristofolini, I., S. Filippi, and C. Bander. 2009. “The Role of Product Feature Relations in a Knowledge Based Methodology to Manage Design Modifications for Product Measurability.” International Journal of Production Research 47 (9): 2373–2389.
  • Gao, H. J., X. M. Liu, and J. Lam. 2009. “Stability Analysis and Stabilization for Discrete-time Fuzzy Systems with Time-varying Delay.” IEEE Trans System Man and Cybernetics Part B – Cybernetics 39 (2): 306–317.
  • Jardim-Goncalves, R., J. Sarraipa, C. Agostinho, and H. Panetto. 2011. “Knowledge Framework for Intelligent Manufacturing Systems.” Journal of Intelligent Manufacturing 22 (5): 725–735.
  • Kahraman, C., A. Beskese, and I. Kaya. 2010. “Selection among ERP Outsourcing Alternatives Using a Fuzzy Multi-criteria Decision Making Methodology.” International Journal of Production Research 48 (2): 547–566.
  • Kingsly, D., J. Singh, and C. Jebaraj. 2008. “Feature-based Design for Process Planning of the Forging Process.” International Journal of Production Research 46 (3): 675–701.
  • Laili, Y. J., F. Tao, L. Zhang, and B. R. Sarker. 2012. “A Study of Optimal Allocation of Computing Resources in Cloud Manufacturing Systems.” The International Journal of Advanced Manufacturing Technology 63 (5–8): 671–690.
  • Lee, H. 2004. “Rule-based Process Planning by Grouping Features.” KSME International Journal 18 (12): 2095–2103.
  • Li, Y. G., Y. F. Ding, W. P. Mou, and H. Guo. 2010. “Feature Recognition Technology for Aircraft Structural Parts Based on a Holistic Attribute Adjacency Graph.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 224 (2): 271–278.
  • Lim, M. K., and Z. Zhang. 2012. “A Multi-agent System Using Iterative Bidding Mechanism to Enhance Manufacturing Agility.” Expert Systems with Applications 39 (9): 8259–8273.
  • Liu, Z. K., and L. H. Wang. 2007. “Sequencing of Interacting Prismatic Machining Features for Process Planning.” Computers in Industry 58 (4): 295–303.
  • Liu, C. Q., Y. G. Li, W. Wang, and Y. Lin. 2011. “Feature Based Man-hour Forecasting Model for Aircraft Structure Parts NC Machining.” Computer Integrated Manufacturing Systems 17 (10): 2156–2162.
  • Liu, S., M. Leat, J. Moizer, P. Megicks, and D. Kasturiratne. 2013. “A Decision-focused Knowledge Management Framework to Support Collaborative Decision Making for Lean Supply Chain Management.” International Journal of Production Research 51 (7): 2123–2137.
  • Lyons, A. C., L. Everington, J. Hernandez, D. Li, R. Michaelides, and J. Um. 2013. “The Application of a Knowledge-based Reference Framework to Support the Provision of Requisite Variety and Customisation across Collaborative Networks.” International Journal of Production Research 51 (7): 2019–2033.
  • Mak, K. L., and Y. S. Wong. 2000. “Product Grouping and Resource Allocation in Multiline Manufacturing Systems.” The International Journal of Advanced Manufacturing Technology 16 (12): 917–926.
  • McCormack, A. D., and R. N. Ibrahim. 2002. “Process Planning Using Adjacency-based Feature Extraction.” International Journal of Advanced Manufacturing Technology 20 (11): 817–823.
  • Mohapatra, P., L. Benyoucef, and M. K. Tiwari. 2013. “Realising Process Planning and Scheduling Integration through Adaptive Setup Planning.” International Journal of Production Research 51 (8): 2301–2323.
  • Muniz, J., E. D. Batista Jr., and G. Loureiro. 2010. “Knowledge-based Integrated Production Management Model.” Global Journal of Knowledge Management 14 (6): 858–871.
  • Phanden, R. K., A. Jain, and R. Verma. 2013. “An Approach for Integration of Process Planning and Scheduling.” International Journal of Computer Integrated Manufacturing 26 (4): 284–302.
  • Piorkowski, B. A., J. X. Gao, R. D. Evans, and N. Martin. 2013. “A Dynamic Knowledge Management Framework for the High Value Manufacturing Industry.” International Journal of Production Research 51 (7): 2176–2185.
  • Prakash, A., F. T. S. Chan, and S. G. Deshmukh. 2011. “FMS Scheduling with Knowledge Based Genetic Algorithm Approach.” Expert Systems with Applications 38 (4): 3161–3171.
  • Sadiq, R., and S. Tesfamariam. 2009. “Environmental Decision-making under Uncertainty Using Intuitionistic Fuzzy Analytic Hierarchy Process (IF-AHP).” Stochastic Environmental Research and Risk Assessment 23 (1): 75–91.
  • Schnaitter, K., J. Spiegel, and N. Polyzotics. 2009. “Depth Estimation for Ranking Query Optimization.” The VLDB Journal 18 (2): 521–542.
  • Shen, W. 2002. “Distributed Manufacturing Scheduling Using Intelligent Agents.” IEEE Intelligent Systems 17 (1): 88–94.
  • Shen, W., L. Wang, and Q. Hao. 2006. “Agent-based Distributed Manufacturing Process Planning and Scheduling: A State-of-the-art Survey.” IEEE Transactions on Systems, Man, and Cybernetics, Part C 36 (4): 563–577.
  • Solidifier, A., and E. Pasha. 2009. “The Possibilistic Moments of Fuzzy Numbers and Their Applications.” Journal of Computational and Applied Mathematics 223 (2): 1028–1042.
  • Stefanini, L., L. Sorini, and M. L. Guerra. 2006. “Parametric Representation of Fuzzy Numbers and Application to Fuzzy Calculus.” Fuzzy Sets Systems 157 (18): 2423–2455.
  • Tesfamariam, S., and R. Sadiq. 2006. “Risk-based Environmental Decision-making Using Fuzzy Analytic Hierarchy Process (F-AHP).” Stochastic Environmental Research and Risk Assessment 21 (1): 35–50.
  • Tharumarajah, A. 2001. “Survey of Resource Allocation Methods for Distributed Manufacturing Systems.” Production Planning & Control 12 (1): 58–68.
  • Thavaneneswarn, A., S. S. Appadoo, and A. Paseka. 2009. “Weighted Possibilistic Moments of Fuzzy Numbers with Applications to GARCH Modeling and Option Pricing.” Mathematical and Computer Modelling 49 (1–2): 352–368.
  • Thiagarajah, K., S. S. Appadoo, and A. Thavaneswaran. 2007. “Option Valuation Model with Adaptive Fuzzy Numbers.” Computers & Mathematics with Applications 53 (5): 831–841.
  • Wang, C., K. Li, H. Ghenniwa, and W. Shen. 2008. “Real Time Distributed Shop Floor Scheduling Using an Agent-based Service-oriented Architecture.” International Journal of Production Research 46 (9): 2433–2452.
  • Wu, J., W. Y. Zhang, S. Zhang, Y. N. Liu, and X. H. Meng. 2013. “A Matrix-based Bayesian Approach for Manufacturing Resource Allocation Planning in Supply Chain Management.” International Journal of Production Research 51 (5): 1451–1463.
  • Zeballos, L. J., O. D. Quiroga, and G. P. Henning. 2010. “A Constraint Programming Model for the Scheduling of Flexible Manufacturing Systems with Machine and Tool Limitations.” Engineering Applications of Artificial Intelligence 23 (2): 229–248.
  • Zhang, W. Y., S. Zhang, M. Cai, and J. X. Huang. 2011. “A New Manufacturing Resource Allocation Method for Supply Chain Optimization Using Extended Genetic Algorithm.” The International Journal of Advanced Manufacturing Technology 53 (9): 1247–1260.
  • Zhu, Y. G., and B. D. Liu. 2005. “Some Inequalities of Random Fuzzy Variables with Application to Moment Convergence.” Computers & Mathematics with Applications 50 (5–6): 719–727.
  • Zhu, J., X. Li, and W. Shen. 2012. “A Divide and Conquer Based Greedy Algorithm for Two-machine No-wait Job Shop Problems with Makespan Minimization.” International Journal of Production Research 50 (10): 2692–2704.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.