References
- Aytug, H., M. A. Lawley, K. Mckay, S. Mohan, and R. Uzsoy. 2005. “Executing Production Schedules in the Face of Uncertainties: A Review and Some Future Directions.” European Journal of Operational Research 161 (1): 86–110.10.1016/j.ejor.2003.08.027
- Banks, J., J. S. Carson II, B. Nelson, and D. M. Nicol. 2010. Discrete-event System Simulation. 5th ed. Upper Saddle River, NJ: Prentice Hall.
- Cowling, P., and M. Johansson. 2002. “Using Real Time Information for Effective Dynamic Scheduling.” European Journal of Operational Research 139 (2): 230–244.10.1016/S0377-2217(01)00355-1
- D'Amours, S., M. Rönnqvist, and A. Weintraub 2008. “Using Operational Research for Supply Chain Planning in the Forest Products Industry.” INFOR: Information Systems and Operational Research 46 (4), 265–281.10.3138/infor.46.4.265
- Duenas, A., and D. Petrovic. 2008. “An Approach to Predictive-reactive Scheduling of Parallel Machines Subject to Disruptions.” Annals of Operations Research 159 (1): 65–82.10.1007/s10479-007-0280-3
- Frantzén, M., A. H. C. Ng, and P. Moore. 2011. “A Simulation-based Scheduling System for Real-time Optimization and Decision Making Support.” Robotics and Computer-Integrated Manufacturing 27 (4): 696–705.10.1016/j.rcim.2010.12.006
- Gholami, M., and M. Zandieh. 2009. “Integrating Simulation and Genetic Algorithm to Schedule a Dynamic Flexible Job Shop.” Journal of Intelligent Manufacturing 20 (4): 481–498.10.1007/s10845-008-0150-0
- Gupta, A., and C. D. Maranas. 2003. “Managing Demand Uncertainty in Supply Chain Planning.” Computers & Chemical Engineering 27 (8–9): 1219–1227.
- Kazemi Zanjani, M., M. Nourelfath, and D. Ait-Kadi. 2009. “A Multi-stage Stochastic Programming Approach for Production Planning with Uncertainty in the Quality of Raw Materials and Demand.” International Journal of Production Research 48 (16): 4701–4723.
- Kazemi Zanjani, M., D. Ait-Kadi, and M. Nourelfath. 2010. “Robust Production Planning in a Manufacturing Environment with Random Yield: A Case in Sawmill Production Planning.” European Journal of Operational Research 201 (3): 882–891.10.1016/j.ejor.2009.03.041
- Kazemi Zanjani, M., M. Nourelfath, and D. Ait-Kadi. 2011. “Production Planning with Uncertainty in the Quality of Raw Materials: A Case in Sawmills.” Journal of the Operational Research Society 62 (7): 1334.10.1057/jors.2010.30
- Law, A. M., and W. D. Kelton. 2007. Simulation Modeling and Analysis. 4th ed. Boston, MA: McGraw-Hill.
- Li, Z. K., and M. Ierapetritou. 2008. “Process Scheduling under Uncertainty: Review and Challenges.” Computers & Chemical Engineering 32 (4–5): 715–727.
- Lou, P., Q. Liu, Z. Zhou, H. Wang, and S. Sun. 2012. “Multi-agent-based Proactive–reactive Scheduling for a Job Shop.” The International Journal of Advanced Manufacturing Technology 59 (1-4): 311–324.10.1007/s00170-011-3482-4
- Ouelhadj, D., and S. Petrovic. 2009. “A Survey of Dynamic Scheduling in Manufacturing Systems.” Journal of Scheduling 12 (4): 417–431.10.1007/s10951-008-0090-8
- Rönnqvist, M. 2003. “Optimization in Forestry.” Mathematical Programming 97 (1–2): 267–284.
- Sabuncuoglu, I., and M. Bayız. 2000. “Analysis of Reactive Scheduling Problems in a Job Shop Environment.” European Journal of Operational Research 126 (3): 567–586.10.1016/S0377-2217(99)00311-2
- Sun, J., and D. Xue. 2001. “A Dynamic Reactive Scheduling Mechanism for Responding to Changes of Production Orders and Manufacturing Resources.” Computers in Industry 46 (2): 189–207.10.1016/S0166-3615(01)00119-1
- Vieira, G. E., J. W. Herrmann, and E. Lin. 2003. “Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods.” Journal of Scheduling 6 (1): 39–62.10.1023/A:1022235519958
- Wan, Y. W. 1995. “Which is better, off-line or real-time scheduling?.” International Journal of Production Research 33 (7): 2053–2059.10.1080/00207549508904799
- Wang, Y., L. Luangkesorn, and L. J. Shuman. 2011. “Best-subset Selection Procedure. Proceedings of the Winter Simulation Conference.” Phoenix, AZ: Winter Simulation Conference, 4315–4323.