755
Views
14
CrossRef citations to date
0
Altmetric
Articles

An integer linear programming model to support customer-driven material planning in synchronised, multi-tier supply chains

, , &
Pages 4267-4278 | Received 30 Jul 2012, Accepted 16 Dec 2013, Published online: 17 Jan 2014

References

  • Alemany, M. M. E., J. J. Boj, J. Mula, and F. C. Lario. 2010. “Mathematical Programming Model for Centralized Master Planning in Ceramic Tile Supply Chains.” International Journal of Production Research 48 (17): 5053–5074.10.1080/00207540903055701
  • Anne, K. R., J. C. Chedjou, and K. Kyamakia. 2009. “Bifurcation Analysis and Synchronisation Issues in a Three-echelon Supply Chain.” International Journal of Logistics Research and Applications 12 (5): 347–362.10.1080/13675560903181527
  • Billington, P. J., J. O. McClain, and L. J. Thomas. 1983. “Mathematical Programming Approaches to Capacity-constrained MRP Systems: Review, Formulation and Problem Reduction.” Management Science 29 (10): 1126–1141.10.1287/mnsc.29.10.1126
  • Chatfield, D. C. 2009. “The Bullwhip Effect – Impact of Stochastic Lead Time, Information Quality, and Information Sharing: A Simulation Study.” Production and Operations Management 13 (4): 340.10.1111/j.1937-5956.2004.tb00222.x
  • Chen, C. L., and W. C. Lee. 2004. “Multi-objective Optimization of Multi-echelon Supply Chain Networks with Uncertain Product Demand and Prices.” Computers and Chemical Engineering 28: 1131–1144.10.1016/j.compchemeng.2003.09.014
  • Clark, A. R. 2003. “Optimization Approximations for Capacity Constrained Material Requirements Planning.” International Journal of Production Economics 84 (2): 115–131.10.1016/S0925-5273(02)00400-0
  • Coronado, A. E., and A. C. Lyons. 2008. “Investigating the Implications of Extending Synchronized Sequencing in Automotive Supply Chains: The Case of Suppliers in the European Automotive Sector.” International Journal of Production Research 46 (11): 2867–2888.10.1080/00207540601055466
  • Coronado, A. E., C. Lalwani, and C. E. Coronado. 2011. “Measures for Auditing Performance and Integration in Closed-loop Supply Chains.” Supply Chain Management: An International Journal 16 (1): 43–56.
  • Escudero, L. F., and P. V. Kamesam. 1993. “MRP Modelling via Scenarios.” In Optimization in Industry, edited by T. A. Ciriani and R. C. Leachman, 101–111. New York: John Wiley and Sons.
  • Giglio, D., and R. Minciardi. 2003. “Modelling and Optimization of Multi-site Production Systems in Supply Chain Networks.” Proceedings IEEE International Conference on Systems, Man and Cybernetics 3: 2678–2683.
  • Holweg, M. 2003. “The Three-day Car Challenge-investigating the Inhibitors of Responsive Order Fulfillment in New Vehicle Supply Systems.” International Journal of Logistics Research and Applications 6 (3): 165–183.10.1080/1367556031000123106
  • Holweg, M., and J. Bicheno. 2002. “Supply Chain Simulation: A Tool for Education, Enhancement and Endeavor.” International Journal of Production Economics 78: 163–175.10.1016/S0925-5273(00)00171-7
  • Holweg, M., S. M. Disney, P. Hines, and M. Naim. 2005. “Towards Responsive Vehicle Supply: A Simulation-based Investigation into Automotive Scheduling Systems.” Journal of Operations Management 23: 507–530.10.1016/j.jom.2004.10.009
  • Jaksic, M., and B. Rusjan. 2008. “The Effect of Replenishment Policies on the Bullwhip Effect: A Transfer Function Approach.” European Journal of Operational Research 184 (3): 946–961.10.1016/j.ejor.2006.12.018
  • Karni, R. 1981. “Integer Linear Programming Formulation of the Material Requirements Planning Problem.” Journal of Optimization Theory and Applications 35 (2): 217–230.10.1007/BF00934577
  • Kreipl, S., and M. Pinedo. 2004. “Planning and Scheduling in Supply Chains: An Overview of Issues in Practice.” Production and Operations Management 13 (1): 77–92.
  • Lin, C., and Y. T. Lin. 2005. “Mitigating the Bullwhip Effect by Reducing Demand Variance in the Supply Chain.” The International Journal of Advanced Manufacturing Technology 28 (3–4): 328–336.
  • Liu, S., R. I. M. Young, and L. Ding. 2011. “An Integrated Decision Support System for Global Manufacturing Co-ordination in the Automotive Industry.” International Journal of Computer Integrated Manufacturing 24 (4): 285–301.10.1080/0951192X.2011.554869
  • Lyons, A. C., A. E. Coronado-Mondragon, F. Piller, and R. Poler. 2012. Customer-driven Supply Chains: From Glass Pipelines to Open Innovation Networks. London: Springer.10.1007/978-1-84628-876-0
  • Lyons, A. C., A. E. Coronado Mondragon, A. Bremang, D. F. Kehoe, and J. Coleman. 2005. “Prototyping an Information system’s Requirements Architecture for Customer-driven, Supply-chain Operations.” International Journal of Production Research 43 (20): 4289–4319.10.1080/00207540500142365
  • McDonald, C. M., and I. A. Karimi. 1997. “Planning and Scheduling of Parallel Semicontinuous Processes. 1. Production Planning.” Industrial Engineering Chemical Research 36: 2691–2700.10.1021/ie960901+
  • Mula, J., D. Peidro, M. Díaz-Madroñero, and E. Vicens. 2010. “Mathematical Programming Models for Supply Chain Production and Transport Planning.” European Journal of Operational Research 204: 377–390.10.1016/j.ejor.2009.09.008
  • Mula, J., D. Peidro, and R. Poler. 2010. “The Effectiveness of a Fuzzy Mathematical Programming Approach for Supply Chain Production Planning with Fuzzy Demand.” International Journal of Production Economics 128: 136–143.10.1016/j.ijpe.2010.06.007
  • Mula, J., R. Poler, and J. P. Garcia. 2006. “MRP with Flexible Constraints: A Fuzzy Mathematical Programming Approach.” Fuzzy Sets and Systems 157 (1): 74–97.10.1016/j.fss.2005.05.045
  • Mula, J., R. Poler, and J. P. Garcia. 2007. “Material Requirement Planning with Fuzzy Constraints and Fuzzy Coefficients.” Fuzzy Sets and Systems 158 (7): 783–793.10.1016/j.fss.2006.11.003
  • Mula, J., R. Poler, and J. P. Garcia-Sabater. 2008. “Capacity and Material Requirement Planning Modelling by Comparing Deterministic and Fuzzy Models.” International Journal of Production Research 46: 5589–5606.10.1080/00207540701413912
  • Noori, S., M. R. Feylizadeh, M. Bagherpour, F. Zorriassatine, and R. M. Parkin. 2008. Optimization of Material Requirement Planning by Fuzzy Multi-objective Linear Programming. Proceedings of the Institution of Mechanical Engineers. Part B. Engineering Manufacture 222 (7): 887–900.10.1243/09544054JEM1014
  • Park, Y. B. 2005. “An Integrated Approach for Production and Distribution Planning in Supply Chain Management.” International Journal of Production Research 43 (6): 1205–1224.10.1080/00207540412331327718
  • Parra-Peña, J., J. Mula, and F. Campuzano-Bolarin. 2012. “A Formulation for Measuring the Bullwhip Effect within Spreadsheets.” Dirección Y Organización 48: 29–33.
  • Peidro, D., J. Mula, R. Poler, and F. C. Lario. 2009. “Quantitative Models for Supply Chain Planning under Uncertainty: A Review.” International Journal of Advanced Manufacturing Technology 43: 400–420.10.1007/s00170-008-1715-y
  • Peidro, D., J. Mula, R. Poler, and J. L. Verdegay. 2009. “Fuzzy Optimization for Supply Chain Planning under Supply, Demand and Process Uncertainties.” Fuzzy Sets and Systems 160: 2640–2657.10.1016/j.fss.2009.02.021
  • Peidro, D., J. Mula, M. Jiménez, and M. M. Botella. 2010. “A Fuzzy Linear Programming Based Approach for Tactical Supply Chain Planning in An Uncertainty Environment.” European Journal of Operational Research 205 (1): 65–80.10.1016/j.ejor.2009.11.031
  • Peidro, D., J. Mula, M. M. E. Alemany, and F. C. Lario. 2012. “Fuzzy Multi-objective Optimisation for Master Planning in a Ceramic Supply Chain.” International Journal of Production Research 50 (11): 3011–3020.10.1080/00207543.2011.588267
  • Rota, K., C. Thierry, and G. Bel. 1997. Capacity-constrained MRP System: A Mathematical Programming Model Integrating Firm Orders, Forecasts and Suppliers. Toulouse: Université Toulouse II Le Mirail. Départament d’Automatique.
  • von Lanzenauer, Ch., and H. K. Pilz-Glombik. 2002. “Coordinating Supply Chain Decisions: An Optimization Model.” OR Spectrum 24 (1): 59–78.10.1007/s291-002-8200-3
  • Yenisey, M. M. 2006. “A Flow-network Approach for Equilibrium of Material Requirements Planning.” International Journal of Production Economics 102 (2): 317–332.10.1016/j.ijpe.2005.04.002

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.