257
Views
4
CrossRef citations to date
0
Altmetric
Articles

An optimal stocking policy for machining tools with stochastically distributed lifespan and demand

, &
Pages 6175-6191 | Received 22 Nov 2013, Accepted 31 Mar 2014, Published online: 23 May 2014

References

  • Adhitya, A., I. Halim, and R. Srinivasan. 2011. “Decision Support for Green Supply Chain Operations by Integrating Dynamic Simulation and LCA Indicators: Diaper Case Study.” Environmental Science & Technology 45 (23): 10178–10185.
  • Alves de Albuquerque, Gabriel, Paulo Maciel, Ricardo Massa Ferreira Lima, F. Magnani, and R. Massa. 2013. “Strategic and Tactical Evaluation of Conflicting Environment and Business Goals in Green Supply Chains.” IEEE Transactions on Systems, Man, and Cybernetics: Systems 43 (5): 1013–1027.10.1109/TSMCA.2012.2227311
  • Amin, S. H., and G. Zhang. 2012. “An Integrated Model for Closed-loop Supply Chain Configuration and Supplier Selection: Multi-objective Approach.” Expert Systems with Applications 39 (8): 6782–6791.10.1016/j.eswa.2011.12.056
  • Bonvoisin, J., S. Thiede, and D. Brissaud. 2013. “An Implemented Framework to Estimate Manufacturing-related Energy Consumption in Product Design.” International Journal of Computer Integrated Manufacturing 26 (9): 866–880.10.1080/0951192X.2013.799782
  • Cobb, B. R., R. Rumi, and A. Salmeron. 2013. “Inventory Management with Log-normal Demand per Unit Time.” Computer & Operation Research 40 (7): 1842–1851.
  • El Wardany, T. I., and M. A. Elbestawi. 1997. “Prediction of Tool Failure Rate in Turning Hardened Steels.” International Journal of Advanced Manufacturing Technology 13 (1): 1–16.10.1007/BF01179225
  • Geismar, H. N., G. Laporte, L. Lei, and C. Sriskandarajah. 2008. “The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan.” INFORMS Journal on Computing 20 (1): 21–33.10.1287/ijoc.1060.0208
  • Hirvikorpi, M., T. Knuutila, and T. Leipälä. 2007. “Job Scheduling and Management of Wearing Tools with Stochastic Tool Lifetimes.” International Journal of Flexible Manufacturing Systems 19 (4): 443–462.10.1007/s10696-008-9043-y
  • Hsu, P. H., H. M. Teng, and Y. T. Jou. 2008. “Coordinated Ordering Decisions for Products with Short Lifecycle and Variable Selling Price.” Computers & Industrial Engineering 54 (3): 602–612.
  • Inderfurth, K., P. Kelle, and R. Kleber. 2013. “Dual Sourcing Using Capacity Reservation and Spot Market: Optimal Procurement Policy and Heuristic Parameter Determination.” European Journal of Operational Research 225 (2): 289–309.
  • Karimi-Nasab, M., S. Dowlatshahi, and H. Heidari. 2013. “A Multiobjective Distribution-pricing Model for Multiperiod Price-sensitive Demands.” IEEE Transactions on Engineering Management 60 (3): 640–654.10.1109/TEM.2012.2223822
  • Kim, H., J. Lee, and C. Jung. 2013. “Scheduling Cluster Tools with Ready Time Constraints for Consecutive Small Lots.” IEEE Transactions on Automation Science and Engineering 10 (1): 145–159.10.1109/TASE.2012.2220355
  • Li, C. R., and B. R. Sarker. 2013. “Lifespan Prediction of Cutting Tools for High-value-added Products.” International Journal of Advanced Manufacturing Technology 69 (5–8): 1887–1894.10.1007/s00170-013-5160-1
  • Minguez Gabiña, R., S. Zamora de la Fuente, and L. Barrenetxea Apraiz. 2013. “Life Cycle Assessment in Switchgears for Primary Electrical Distribution.” DYNA 88 (3): 543–550.10.6036/dynaii
  • Mungan, D., J. Yu, and B. R. Sarker. 2010. “Manufacturing Lot-sizing, Procurement and Delivery Schedules over a Finite Planning Horizon.” International Journal of Production Research 48 (12): 3619–3636.10.1080/00207540902878228
  • Naeem, M. A., D. J. Dias, and R. Tibrewal. 2013. “Production Planning Optimization for Manufacturing and Remanufacturing System in Stochastic Environment.” Journal of Intelligent Manufacturing 24 (4): 717–728.10.1007/s10845-011-0619-0
  • Nair, A., and D. J Closs. 2006. “An Examination of the Impact of Coordinating Supply Chain Policies and Price Markdowns on Short Lifecycle Product Retail Performance.” International Journal of Production Economics 102 (2): 379–392.10.1016/j.ijpe.2005.04.009
  • Parija, G. R., and B. R. Sarker. 1999. “Operations Planning in a Supply Chain System with Fixed-interval Deliveries of Finished Goods to Multiple Customers.” IIE Transactions 31 (11): 1075–1082.
  • Sarker, B. R. 1989. “Simulating a Just-in-time Production System.” Computers & Industrial Engineering 16 (1): 127–137.
  • Shaw, M. C. 2005. Metal Cutting Principles. New York: Oxford University Press.
  • Shen, Y., and S. P. Willems. 2012. “Strategic Sourcing for the Short-lifecycle Products.” International Journal of Production Economics 139 (2): 575–585.10.1016/j.ijpe.2012.05.032
  • Taleizadeh, A. A., S. T. A. Niaki, and H. Wee. 2013. “Joint Single Vendor–Single Buyer Supply Chain Problem with Stochastic Demand and Fuzzy Lead-time.” Knowledge-Based Systems 48: 1–9.10.1016/j.knosys.2013.03.011
  • Ventura, J. A., V. A. Valdebenito, and B. Golany. 2013. “A Dynamic Inventory Model with Supplier Selection in a Serial Supply Chain Structure.” European Journal of Operational Research 230 (2): 258–271.10.1016/j.ejor.2013.03.012
  • Yu, J., D. Mungan, and B. R. Sarker. 2011. “An Integrated Multi-stage Supply Chain Inventory Model under an Infinite Planning Horizon and Continuous Price Decrease.” Computers & Industrial Engineering 61 (1): 118–130.
  • Yu, J., B. R. Sarker, Q. Duan, and B. Wu. 2012. “Single-manufacturer, Multi-retailer Consignment Policy for Retailers’ Generalized Demand Distributions.” Journal of the Operational Research Society 63 (12): 1708–1719.10.1057/jors.2012.13

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.