486
Views
41
CrossRef citations to date
0
Altmetric
Articles

Partial disassembly sequencing considering acquired end-of-life product age distributions

&
Pages 7496-7512 | Received 18 Oct 2013, Accepted 20 Jun 2014, Published online: 30 Jul 2014

References

  • Bentaha, M. L., B. Olga, A. Dolgui, and S. J. Hu. 2014. “Dealing with Uncertainty in Disassembly Line Design.” CIRP Annals-Manufacturing Technology 63 (1): 21–24.
  • Brown-West, B. M., J. R. Gregory, and R. E. Kirchain. 2010. “Modeling Electronic Waste Recovery Systems under Uncertainty.” In IEEE International Symposium on Sustainable Systems and Technology (ISSST) 2010, 1–6. Arlington, VA.10.1109/ISSST.2010.5507689
  • Caccia, C., and A. Pozzetti. 2001. “Genetic Algorithm for Disassembly Strategy Definition.” Proceedings of SPIE 4193: Environmentally Conscious Manufacturing 68–77.10.1117/12.417250
  • Galantucci, L. M., G. Percoco, and R. Spina. 2004. “Assembly and Disassembly Planning by Using Fuzzy Logic & Genetic Algorithms.” International Journal of Advanced Robotic Systems 1 (2): 67–74.
  • Gao, M., M. C. Zhou, and Y. Tang. 2004. “Intelligent Decision Making in Disassembly Process Based on Fuzzy Reasoning Petri Nets.” IEEE Transactions on Systems, Man and Cybernetics, Part B (Cybernetics) 34 (5): 2029–2034.10.1109/TSMCB.2004.833331
  • Giudice, F., and G. Fargione. 2007. “Disassembly Planning of Mechanical Systems for Service and Recovery: A Genetic Algorithms Based Approach.” Journal of Intelligent Manufacturing 18 (3): 313–329.10.1007/s10845-007-0025-9
  • Guide Jr, V. D., and V. Jayaraman. 2000. “Product Acquisition Management: Current Industry Practice and a Proposed Framework.” International Journal of Production Research 38 (16): 3779–3800.
  • Guide Jr, V. D., and L. N. Wassenhove. 2001. “Managing Product Returns for Remanufacturing.” Production and Operations Management 10 (2): 142–155.
  • Gupta, S. M., and M. A. Ilgin. 2012. Remanufacturing Modeling and Analysis. Boca Raton, FL: CRC Press.
  • Ilgin, M. A., and S. M. Gupta. 2010. “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the Art.” Journal of Environmental Management 91 (3): 563–591.10.1016/j.jenvman.2009.09.037
  • Inderfurth, K., and I. M. Langella. 2006. “Heuristics for Solving Disassemble-to-order Problems with Stochastic Yields.” OR Spectrum 28 (1): 73–99.10.1007/s00291-005-0007-2
  • Kongar, E., and S. M. Gupta. 2005. “Disassembly Sequencing Using Genetic Algorithm.” The International Journal of Advanced Manufacturing Technology 30 (5–6): 497–506.
  • Kumar, V., P. S. Shirodkar, J. A. Camelio, and J. Sutherland. 2007. “Value Flow Characterization during Product Lifecycle to Assist in Recovery Decisions.” International Journal of Production Research 45 (18–19): 4555–4572.10.1080/00207540701474633
  • Lambert, A. 2003. “Disassembly Sequencing: A Survey.” International Journal of Production Research 41 (16): 3721–3759.10.1080/0020754031000120078
  • Meacham, A., R. Uzsoy, and U. Venkatadri. 1999. “Optimal Disassembly Configurations for Single and Multiple Products.” Journal of Manufacturing Systems 18 (5): 311–322.10.1016/S0278-6125(00)87634-7
  • Murata, T., and H. Ishibuchi. 1995. “MOGA: Multi-objective Genetic Algorithms.” IEEE International Conference on Evolutionary Computation 1: 289–294.
  • Percoco, G., and M. Diella. 2013. “Preliminary Evaluation of Artificial Bee Colony Algorithm When Applied to Multi-objective Partial Disassembly Planning.” Research Journal of Applied Sciences, Engineering and Technology 6 (17): 3234–3243.
  • Reveliotis, S. A. 2007. “Uncertainty Management in Optimal Disassembly Planning through Learning-based Strategies.” IIE Transactions 39 (6): 645–658.10.1080/07408170600897536
  • Rickli, J. L., and J. A. Camelio. 2013. “Multi-objective Partial Disassembly Optimization Based on Sequence Feasibility.” Journal of Manufacturing Systems 32 (1): 281–293.10.1016/j.jmsy.2012.11.005
  • Savaskan, R. C., S. Bhattacharya, and L. N. Van Wassenhove. 2004. “Closed-loop Supply Chain Models with Product Remanufacturing.” Management Science 50 (2): 239–252.10.1287/mnsc.1030.0186
  • Seo, K.-K., J.-H. Park, and D.-S. Jang. 2001. “Optimal Disassembly Sequence Using Genetic Algorithms Considering Economic and Environmental Aspects.” The International Journal of Advanced Manufacturing Technology 18 (5): 371–380.10.1007/s001700170061
  • Tang, Y., M. C. Zhou, E. Zussman, and R. Caudill. 2000. “Disassembly Modeling, Planning and Application: A Review.” Proceedings of IEEE International Conference on Robotics and Automation 3: 2197–2202.
  • Teunter, R. H., and S. D. P. Flapper. 2011. “Optimal Core Acquisition and Remanufacturing Policies under Uncertain Core Quality Fractions.” European Journal of Operational Research 210 (2): 241–248.10.1016/j.ejor.2010.06.015
  • Tian, G., Y. Liu, Q. Tian, and J. Chu. 2011. “Evaluation Model and Algorithm of Product Disassembly Process with Stochastic Feature.” Clean Technologies and Environmental Policy 14 (2): 345–356.
  • Tripathi, M., S. Agrawal, M. K. Pandey, R. Shankar, and M. K. Tiwari. 2009. “Real World Disassembly Modeling and Sequencing Problem: Optimization by Algorithm of Self-guided Ants (ASGA).” Robotics and Computer Integrated Manufacturing 25 (3): 483–496.10.1016/j.rcim.2008.02.004
  • Ullerich, C., and Udo Buscher. 2013. “Flexible Disassembly Planning Considering Product Conditions.” International Journal of Production Research 51 (20): 6209–6228.10.1080/00207543.2013.825406
  • Wan, H., and V. K. Krishna Gonnuru. 2013. “Disassembly Planning and Sequencing for End-of-life Products with RFID Enriched Information.” Robotics and Computer Integrated Manufacturing 29 (3): 112–118.10.1016/j.rcim.2012.05.001
  • Wang, H., D. Xiang, Y. Rong, and L. Zhang. 2013. “Intelligent Disassembly Planning: A Review on Its Fundamental Methodology.” Assembly Automation 33 (1): 78–85.10.1108/01445151311294801

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.