References
- Apple. 2012. “Powering Our Facilities with Clean and Renewable Energy.” Accessed February 4. http://www.apple.com/environment/renewable-energy/
- Ashok, S. 2006. “Peak-load Management in Steel Plants.” Applied Energy 83 (5): 413–424.10.1016/j.apenergy.2005.05.002
- Baldick, R., S. Kolos, and S. Tompaidis. 2006. “Interruptible Electricity Contracts from an Electricity Retailer’s Point of View: Valuation and Optimal Interruption.” Operations Research 54 (4): 627–642.10.1287/opre.1060.0303
- Cai, T., S. Duan, and C. Chen. 2010. “Forecasting Power Output for Photovoltaic Grid-connected Power Systems without Using Solar Radiation Measurement.” In Proceedings of Power Electronics for Distributed Generation Systems Symposium, 773–777. Hefei.
- Chao, X., and P. H. Zipkin. 2008. “Optimal Policy for a Periodic-review Inventory System under a Supply Capacity Contract.” Operations Research 56 (1): 59–68.10.1287/opre.1070.0478
- Chun, Y., and B. Bidanda. 2013. “Sustainable Manufacturing and the Role of the International Journal of Production Research.” International Journal of Production Research 51 (23–24): 7448–7455.10.1080/00207543.2012.762135
- Eberling, B. 2014. “Fairfield Brewery Gets Mammoth Wind Turbine to Power Plant.” Accessed January 19. http://www.dailyrepublic.com/featured-stories/fairfield-brewery-gets-mammoth-wind-turbine-to-power-plant
- Fernandez, M., L. Li, and Z. Sun. 2013. “Just-for-peak Buffer Inventory for Peak Electricity Demand Reduction of Manufacturing Systems.” International Journal of Production Economics 146 (1): 178–184.10.1016/j.ijpe.2013.06.020
- Gaussin, M., G. Hu, S. Abolghasem, S. Basu, M. R. Shankar, and B. Bidanda. 2013. “Assessing the Environmental Footprint of Manufactured Products: A Survey of Current Literature.” International Journal of Production Economics 146 (2): 515–523.10.1016/j.ijpe.2011.12.002
- Guerrero, C. A., J. Wang, J. Li, J. Arinez, S. Biller, N. Huang, and G. Xiao. 2011. “Production System Design to Achieve Energy Savings in an Automotive Paint Shop.” International Journal of Production Research 49 (22): 6769–6785.10.1080/00207543.2010.535042
- Honda. 2013. “Honda to Install Wind Turbines at Its Russels Point Plant.” Accessed December 4. http://cleantechnica.com/2013/01/28/honda-to-install-wind-turbines-at-its-russels-point-plant/
- Karki, R., P. Hu, and R. Billinton. 2006. “A Simplified Wind Power Generation Model for Reliability Evaluation.” IEEE Transactions on Energy Conversion 21 (2): 533–540.10.1109/TEC.2006.874233
- Lave, M., and J. Kleissl. 2011. “Optimum Fixed Orientations and Benefits of Tracking for Capturing Solar Radiation in the Continental United States.” Renewable Energy 36 (3): 1145–1152.10.1016/j.renene.2010.07.032
- Lopez, P., A. Terry, D. Daniely, and A. Kalir. 2005. “Effective Utilization (Ue) – A Breakthrough Performance Indicator for Machine Efficiency Improvement.” In Proceeding of IEEE International Symposium on Semiconductor Manufacturing, 63–66. San Jose, CA.
- Moon, J.-Y., and J. Park. 2014. “Smart Production Scheduling with Time-dependent and Machine-Dependent Electricity Cost by Considering Distributed Energy Resources and Energy Storage.” International Journal of Production Research 52 (13): 3922–3939.
- NCDC (National Climate Data Center). 2014. Accessed January 18. http://www.ncdc.noaa.gov/cdo-web/search
- REC (Renewable Energy Certificates). 2013. Accessed February 4. http://apps3.eere.energy.gov/greenpower/markets/certificates.shtml?page=2&companyid=283
- Shafer, B. 2009. “Electrical Wind Generation for Cement Manufacturing, a Case Study: CalPortland Mojave Plant’s 24MW Wind Project.” In Proceedings of 2009 IEEE Cement Industry Technical Conference, 1–9. Palm Desert, CA.10.1109/CITCON.2009.5116171
- State-Ease, Inc. 2014. “Design Expert, Version 9 (Software).” Accessed January 26. http://www.statease.com
- Taboada, H., Z. Xiong, T. Jin, and J. Jimenez. 2012. “Exploring a Solar Photovoltaic-based Energy Solution for a Green Manufacturing Environment.” In Proceedings of IEEE Conference on Automation and Science Engineering, 40–45. Seoul.
- Villarreal, S., J. A. Jimenez, T. Jin, and M. Cabrera-Rios. 2013. “Designing a Sustainable and Distributed Generation System for Semiconductor Wafer Fabs.” IEEE Transactions on Automation Science and Engineering 10 (1): 10–16.
- Wang, Y., and L. Li. 2013. “Time-of-use Based Electricity Demand Response for Sustainable Manufacturing Systems.” Energy 63 (12): 233–244.10.1016/j.energy.2013.10.011
- WSB (Weather Spark Beta). 2013. Accessed January 18. http://weatherspark.com/about
- Weekes, S. M., and A. S. Tomlin. 2014. “Comparison between the Bivariate Weibull Probability Approach and Linear Regression for Assessment of the Long-term Wind Energy Resource Using MCP.” Renewable Energy 68: 529–539.10.1016/j.renene.2014.02.020
- Xu, D., and A. A. Girgis. 2001. “Optimal Load Shedding Strategy in Power Systems with Distributed Generation.” In Proceedings of IEEE on Power Engineering Society Winter Meeting, Vol. 2, 788–793. Columbus, OH.