332
Views
2
CrossRef citations to date
0
Altmetric
Articles

Integrated scheduling and self-reconfiguration for assembly job shop in knowledgeable manufacturing

&
Pages 1746-1760 | Received 30 Jan 2014, Accepted 19 Aug 2014, Published online: 23 Sep 2014

References

  • Adam, N. R., J. W. M. Bertrand, and J. Surkis. 1987. “Priority Assignment Procedures in Multi-level Assembly Job Shops.” IIE Transactions 19 (3): 317–328.10.1080/07408178708975402
  • Allahverdi, A., and F. S. Al-Anzi. 2006a. “A PSO and a Tabu Search Heuristics for the Assembly Scheduling Problem of the Two-stage Distributed Database Application.” Computers & Operations Research 33 (4): 1056–1080.
  • Allahverdi, A., and F. S. Al-Anzi. 2006b. “Evolutionary Heuristics and an Algorithm for the Two-stage Assembly Scheduling Problem to Minimize Makespan with Setup Times.” International Journal of Production Research 44 (22): 4713–4735.10.1080/00207540600621029
  • Anzanello, M. J., and F. S. Fogliatto. 2010. “Scheduling Learning Dependent Jobs in Customised Assembly Lines.” International Journal of Production Research 48 (22): 6683–6699.10.1080/00207540903307599
  • Belmokhtar, S., A. Dolgui, N. Guschinsky, and G. Levin. 2006. “Integer Programming Models for Logical Layout Design of Modular Machining Lines.” Computers & Industrial Engineering 51 (3): 502–518.
  • Blum, C., and C. Miralles. 2011. “On Solving the Assembly Line Worker Assignment and Balancing Problem via Beam Search.” Computers & Operations Research 38 (1): 328–339.
  • Bukchin, Y., and Y. Cohen. 2013. “Minimising Throughput Loss in Assembly Lines due to Absenteeism and Turnover via Work-sharing.” International Journal of Production Research 51 (20): 6140–6151.10.1080/00207543.2013.807374
  • Costa, A., F. A. Cappadonna, and S. Fichera. 2014. “Joint Optimization of a Flow-Shop Group Scheduling with Sequence Dependent Set-up Times and Skilled Workforce Assignment.” International Journal of Production Research 52 (9): 2696–2728.10.1080/00207543.2014.883469
  • Dolgui, A., N. Guschinsky, and G. Levin. 2012. “Enhanced Mixed Integer Programming Model for a Transfer Line Design Problem.” Computers & Industrial Engineering 62 (2): 570–578.
  • ElMaraghy, H. A. 2006. “Flexible and Reconfigurable Manufacturing Systems Paradigms.” International Journal of Flexible Manufacturing Systems 17 (4): 261–276.
  • Essafi, I., Y. Mati, and S. Dauzère-Pérès. 2008. “A Genetic Local Search Algorithm for Minimizing Total Weighted Tardiness in the Job-shop Scheduling Problem.” Computers & Operations Research 35 (8): 2599–2616.
  • Essafi, M., X. Delorme, and A. Dolgui. 2012. “A Reactive GRASP and Path Relinking for Balancing Reconfigurable Transfer Lines.” International Journal of Production Research 50 (18): 5213–5238.10.1080/00207543.2012.677864
  • Fry, T. D., M. D. Oliff, E. D. Minor, and G. K. Leong. 1989. “The Effects of Product Structure and Sequencing Rule on Assembly Shop Performance.” International Journal of Production Research 27 (4): 671–686.10.1080/00207548908942575
  • Ghosh, J. 2013. “Distributed Task Scheduling and Human Resource Distribution in Industrial Service Solution Production: A Simulation Application.” International Journal of Production Research 51 (10): 2900–2914.10.1080/00207543.2012.748229
  • Hnaien, F., X. Delorme, and A. Dolgui. 2009. “Genetic Algorithm for Supply Planning in Two-level Assembly Systems with Random Lead Times.” Engineering Applications of Artificial Intelligence 22 (6): 906–915.10.1016/j.engappai.2008.10.012
  • Hu, P. C. 2004. “Minimising Total Tardiness for the Worker Assignment Scheduling Problem in Identical Parallel-machine Models.” The International Journal of Advanced Manufacturing Technology 23 (5–6): 383–388.10.1007/s00170-003-1716-9
  • Huang, P. Y. 1984. “A Comparative Study of Priority Dispatching Rules in a Hybrid Assembly/Job Shop.” International Journal of Production Research 22 (3): 375–387.10.1080/00207548408942460
  • Kher, H. V. 2000. “Examination of Worker Assignment and Dispatching Rules for Managing Vital Customer Priorities in Dual Resource Constrained Job Shop Environments.” Computers & Operations Research 27 (6): 525–537.
  • Kim, J. U., and Y. D. Kim. 1996. “Simulated Annealing and Genetic Algorithms for Scheduling Products with Multi-level Product Structure.” Computers & Operations Research 23 (9): 857–868.
  • Kristianto, Y., A. Gunasekaran, and J. Jiao. 2014. “Logical Reconfiguration of Reconfigurable Manufacturing Systems with Stream of Variations Modelling: A Stochastic Two-stage Programming and Shortest Path Model.” International Journal of Production Research 52 (5): 1401–1418.10.1080/00207543.2013.843798
  • Lu, H. L., G. Q. Huang, and H. D. Yang. 2011. “Integrating Order Review/Release and Dispatching Rules for Assembly Job Shop Scheduling Using a Simulation Approach.” International Journal of Production Research 49 (3): 647–669.10.1080/00207540903524490
  • Luh, P. B., D. J. Hoitomt, E. Max, and K. R. Pattipati. 1990. “Schedule Generation and Reconfiguration for Parallel Machines.” IEEE Transactions on Robotics and Automation 6 (6): 687–696.10.1109/70.63271
  • Moon, I., R. Logendran, and J. Lee. 2009. “Integrated Assembly Line Balancing with Resource Restrictions.” International Journal of Production Research 47 (19): 5525–5541.10.1080/00207540802089876
  • Musharavati, F., and A. S. M. Hamouda. 2011. “Modified Genetic Algorithms for Manufacturing Process Planning in Multiple Parts Manufacturing Lines.” Expert Systems with Applications 38 (9): 10770–10779.10.1016/j.eswa.2011.01.129
  • Na, H., and J. Park. 2014. “Multi-level Job Scheduling in a Flexible Job Shop Environment.” International Journal of Production Research 52 (13): 3877–3887.10.1080/00207543.2013.848487
  • Nembhard, D. A. 2001. “Heuristic Approach for Assigning Workers to Tasks Based on Individual Learning Rates.” International Journal of Production Research 39 (9): 1955–1968.10.1080/00207540110036696
  • Nembhard, D. A., and F. Bentefouet. 2012. “Parallel System Scheduling with General Worker Learning and Forgetting.” International Journal of Production Economics 139 (2): 533–542.10.1016/j.ijpe.2012.05.024
  • Noorul Haq, A., T. R. Ramanan, K. S. Shashikant, and R. Sridharan. 2010. “A Hybrid Neural Network–Genetic Algorithm Approach for Permutation Flow Shop Scheduling.” International Journal of Production Research 48 (14): 4217–4231.10.1080/00207540802404364
  • Pathumnakul, S., and P. J. Egbelu. 2006. “An Algorithm for Minimizing Weighted Earliness Penalty in Assembly Job Shops.” International Journal of Production Economics 103 (1): 230–245.10.1016/j.ijpe.2005.08.002
  • Pereira, M. T., and M. C. Santoro. 2011. “An Integrative Heuristic Method for Detailed Operations Scheduling in Assembly Job Shop Systems.” International Journal of Production Research 49 (20): 6089–6105.10.1080/00207543.2010.527385
  • Philipoom, P. R., R. S. Russell, and T. D. Fry. 1991. “A Preliminary Investigation of Multi-attribute Based Sequencing Rules for Assembly Shops.” International Journal of Production Research 29 (4): 739–753.10.1080/00207549108930099
  • Pongcharoen, P., C. Hicks, P. M. Braiden, and D. J. Stewardson. 2002. “Determining Optimum Genetic Algorithm Parameters for Scheduling the Manufacturing and Assembly of Complex Products.” International Journal of Production Economics 78 (3): 311–322.10.1016/S0925-5273(02)00104-4
  • Reeja, M. K., and C. Rajendran. 2000a. “Dispatching Rules for Scheduling in Assembly Jobshops – Part 1.” International Journal of Production Research 38 (9): 2051–2066.10.1080/002075400188492
  • Reeja, M. K., and C. Rajendran. 2000b. “Dispatching Rules for Scheduling in Assembly Jobshops – Part 2.” International Journal of Production Research 38 (10): 2349–2360.10.1080/00207540050028133
  • Thiagarajan, S., and C. Rajendran. 2005. “Scheduling in Dynamic Assembly Job-shops to Minimize the Sum of Weighted Earliness, Weighted Tardiness and Weighted Flowtime of Jobs.” Computers & Industrial Engineering 49 (4): 463–503.
  • Tsai, C. Y., J. J. H. Liou, and T. M. Huang. 2008. “Using a Multiple-GA Method to Solve the Batch Picking Problem: Considering Travel Distance and Order Due Time.” International Journal of Production Research 46 (22): 6533–6555.10.1080/00207540701441947
  • Yan, H. S. 2006. “A New Complicated-knowledge Representation Approach Based on Knowledge Meshes.” IEEE Transactions on Knowledge and Data Engineering 18 (1): 47–62.
  • Yan, H. S., and F. Liu. 2001. “Knowledgeable Manufacturing System – A New Kind of Advanced Manufacturing System.” Computer Integrated Manufacturing Systems 7 (8): 7–11 (in Chinese).
  • Yan, H. S., and C. G. Xue. 2007. “Decision-making in Self-reconfiguration of a Knowledgeable Manufacturing System.” International Journal of Production Research 45 (12): 2735–2758.10.1080/00207540600711895
  • Yan, H. S., and C. G. Xue. 2012. “Automatic Construction and Optimization of Knowledge Mesh for Self-reconfiguration of Knowledgeable Manufacturing System.” Expert Systems with Applications 39 (2): 1799–1810.10.1016/j.eswa.2011.08.072

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.