333
Views
7
CrossRef citations to date
0
Altmetric
Articles

Segment set-based part input sequencing in flexible manufacturing systems

, , &
Pages 5106-5117 | Received 21 Sep 2013, Accepted 09 Nov 2014, Published online: 07 Jan 2015

References

  • Berrada, M., and K. E. Stecke. 1986. “A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems.” Management Science 32: 1316–1335.10.1287/mnsc.32.10.1316
  • Choi, R. H., and E. M. Malstrom. 1988. “Evaluation of Traditional Work Scheduling Rules in a Flexible Manufacturing System with a Physical Simulator.” Journal of Manufacturing Systems 7: 33–45.10.1016/0278-6125(88)90031-3
  • Conover, W. J. 1980. Practical Nonparametric Statistics. New York: John Wiley.
  • Coronado, A. E., A. C. Lyons, D. F. Kehoe, and J. Coleman. 2004. “Enabling Mass Customization: Extending Build-to-order Concepts to Supply Chains.” Production Planning and Control 15: 398–411.10.1080/0953728042000238809
  • Ebadian, M., M. Rabbani, S. A. Torabi, and F. Jolai. 2009. “Hierarchical Production Planning and Scheduling in Make-to-order Environments: Reaching Short and Reliable Delivery Dates.” International Journal of Production Research 47: 5761–5789.10.1080/00207540802010799
  • Feitzinger, E., and H. L. Lee. 1997. “Mass Customization at Hewlett-Packard: The Power of Postponement.” Harvard Business Review, January–February, 116–121.
  • Fernandes, N. O., and S. do Carmo-Silva. 2006. “Generic POLCA – A Production and Materials Flow Control Mechanism for Quick Response Manufacturing.” International Journal of Production Economics 104: 74–84.10.1016/j.ijpe.2005.07.003
  • Gusikhin, O., R. Caprihan, and K. E. Stecke. 2008. “Least in-Sequence Probability Heuristic for Mixed-volume Production Lines.” International Journal of Production Research 46: 647–673.10.1080/00207540600824300
  • He, Y., and M. L. Smith. 2007. “A Dynamic Heuristic-based Algorithm to Part Input Sequencing in Flexible Manufacturing Systems for Mass Customization Capability.” International Journal of Flexible Manufacturing Systems 19: 392–409.10.1007/s10696-008-9045-9
  • He, Y., M. L. Smith, and R. A. Dudek. 2010. “Robotic Material Handler Scheduling in Flexible Manufacturing Systems for Mass Customization.” Robotics and Computer-integrated Manufacturing 26: 671–676.10.1016/j.rcim.2010.02.002
  • Jeong, K.-C., and Y.-D. Kim. 1998. “A Real-Time Scheduling Mechanism for a Flexible Manufacturing System: Using Simulation and Dispatching Rules.” International Journal of Production Research 36: 2609–2626.10.1080/002075498192733
  • Johnsonbaugh, R. 2004. Discrete Mathematics. Pearson Education Asia Limited and Publishing House of Electronics Industry, 55–111.
  • Kim, Y.-D., and C. A. Yano. 1992. “An Iterative Approach to System Setup Problems in Flexible Manufacturing Systems.” International Journal of Flexible Manufacturing Systems 4: 183–209.10.1007/BF01313699
  • Kim, Y.-D., and C. A. Yano. 1994. “A New Branch and Bound Algorithm for Loading Problems in Flexible Manufacturing Systems.” International Journal of Flexible Manufacturing Systems 6: 361–381.10.1007/BF01324801
  • Kim, Y.-D., D.-H. Lee, and C.-M. Yoon. 2001. “Two Stage Heuristic Algorithms for Part Input Sequencing in Flexible Manufacturing Systems.” European Journal of Operational Research 133: 625–634.
  • Kingsman, B. G., L. C. Hendry, A. Mercer, and A. de Souza. 1996. “Responding to Customer Enquiries in Make-to-order Companies Problems and Solutions.” International Journal of Production Economics 46–47: 219–231.10.1016/0925-5273(95)00199-9
  • Kumar, A. 2004. “Mass Customization: Metrics and Modularity.” International Journal of Flexible Manufacturing Systems 16: 287–311.10.1007/s10696-005-5169-3
  • Kumar, A. 2007. “From Mass Customization to Mass Personalization: A Strategic Transformation.” International Journal of Flexible Manufacturing Systems 19: 533–547.10.1007/s10696-008-9048-6
  • Kumar, A., and K. E. Stecke. 2007. “Measuring the Effectiveness of a Mass Customization and Personalization Strategy: A Market- and Organizational-capability-based Index.” International Journal of Flexible Manufacturing Systems 19: 548–569.10.1007/s10696-008-9047-7
  • Lacomme, P., A. Moukrim, and N. Tchernev. 2005. “Simultaneous Job Input Sequencing and Vehicle Dispatching in a Single Vehicle Automated Guided Vehicle System: A Heuristic Branch-and-bound Approach Coupled with a Discrete Events Simulation Model.” International Journal of Production Research 43: 1911–1942.10.1080/13528160412331326450
  • Land, M., M. Stevenson, and M. Thürer. 2014. “Integrating Load-based Order Release and Priority Dispatching.” International Journal of Production Research 52: 1059–1073.10.1080/00207543.2013.836614
  • Leu, B.-Y. 1999. “Comparative Analysis of Order–Input Sequencing Heuristics in a Cellular Flexible Assembly System for Large Products.” International Journal of Production Research 37: 2861–2873.10.1080/002075499190554
  • Mikkola, J. H., and T. Skjøtt-Larsen. 2004. “Supply-chain Integration: Implications for Mass Customization, Modularization and Postponement Strategies.” Production Planning and Control 15: 352–361.10.1080/0953728042000238845
  • Moreira, M. R. A., and R. A. F. S. Alves. 2009. “A Methodology for Planning and Controlling Workload in a Job-shop: A Four-way Decision-making Problem.” International Journal of Production Research 47: 2805–2821.10.1080/00207540701725083
  • O’Keefe, R. M., and R. Rao. 1992. “Part Input into a Flexible Flow System: An Evaluation of Look-ahead Simulation and a Fuzzy Rule Base.” International Journal of Flexible Manufacturing Systems 4: 113–127.10.1007/BF01313696
  • Özbayrak, M., T. C. Papadopoulou, and E. Samaras. 2006. “A Flexible and Adaptable Planning and Control System for an MTO Supply Chain System.” Robotics and Computer-Integrated Manufacturing 22: 557–565.10.1016/j.rcim.2005.12.011
  • Pine II, B. J., B. Victor, and A. C. Boynton. 1993. “Making Mass Customization Work.” Harvard Business Review September–October, 108–119.
  • Rachamadugu, R., and K. E. Stecke. 1994. “Classification and Review of FMS Scheduling Procedures.” Production Planning and Control 5: 2–20.10.1080/09537289408919468
  • Sabuncuoglu, I. 1998. “A Study of Scheduling Rules of Flexible Manufacturing Systems: A Simulation Approach.” International Journal of Production Research 36: 527–546.10.1080/002075498193877
  • Sabuncuoglu, I., and D. L. Hommertzheim. 1993. “Experimental Investigation of an FMS Due-date Scheduling Problem: Evaluation of Machine and AGV Scheduling Rules.” International Journal of Flexible Manufacturing Systems 5: 301–323.10.1007/BF01325033
  • Sabuncuoglu, I., and S. Karabuk. 1999. “Rescheduling Frequency in an FMS with Uncertain Processing Times and Unreliable Machines.” Journal of Manufacturing Systems 18: 268–283.10.1016/S0278-6125(00)86630-3
  • Sabuncuoglu, I., and O. B. Kizilisik. 2003. “Reactive Scheduling in a Dynamic and Stochastic FMS Environment.” International Journal of Production Research 41: 4211–4231.10.1080/0020754031000149202
  • Sabuncuoglu, I., and M. Lahmar. 2003. “An Evaluative Study of Operation Grouping Policies in an FMS.” International Journal of Flexible Manufacturing Systems 15: 217–239.10.1023/A:1026369010026
  • Salvador, F., M. Rungtusanatham, and C. Forza. 2004. “Supply Chain Configurations for Mass Customization.” Production Planning & Control 15: 381–397.
  • Schriber, T. J. 1985. “A GPSS/H Model for a Hypothetical Flexible Manufacturing System.” Annals of Operations Research 3: 171–188.
  • Schriber, T. J., and K. E. Stecke. 1988. “Machine Utilizations Achieved Using Balanced FMS Production Ratios in a Simulated Setting.” Annals of Operations Research 15: 229–267.
  • Shapiro, B. P., V. K. Rangan, and J. J. Sviokla. 2004. “Staple Yourself to an Order.” Harvard Business Review July–August, 62–171.
  • Smith, T. M., and K. E. Stecke. 1996. “On the Robustness of Using Balanced Part Mix Ratios to Determine Cyclic Part Input Sequences into Flexible Flow Systems.” International Journal of Production Research 34: 2925–2941.10.1080/00207549608905066
  • Stecke, K. E. 1983. “Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems.” Management Science 29: 273–288.10.1287/mnsc.29.3.273
  • Stecke, K. E. 1986. “A Hierarchical Approach to Solving Machine Grouping and Loading Problems of Flexible Manufacturing Systems.” European Journal of Operational Research 24: 369–378.10.1016/0377-2217(86)90030-5
  • Stecke, K. E. 1989. “Algorithms for Efficient Planning and Operation of a Particular FMS.” International Journal of Flexible Manufacturing Systems 1: 287–324.
  • Stecke, K. E. 1992. “Procedures to Determine Part Mix Ratios for Independent Demands in Flexible Manufacturing Systems.” IEEE Transactions on Engineering Management 39: 359–369.10.1109/17.165418
  • Stecke, K. E., and I. Kim. 1991. “A Flexible Approach to Part Type Selection in Flexible Flow Systems Using Part Mix Ratios.” International Journal of Production Research 29: 53–75.10.1080/00207549108930048
  • Stecke, K. E., and T. L. Morin. 1985. “The Optimality of Balancing Workloads in Certain Types of Flexible Manufacturing Systems.” European Journal of Operational Research 20: 68–82.10.1016/0377-2217(85)90285-1
  • Stecke, K. E., and N. Raman. 1994. “Production Planning Decisions in Flexible Manufacturing Systems with Random Material Flows.” IIE Transactions 26: 2–17.10.1080/07408179408966624
  • Stecke, K. E., and J. J. Solberg. 1981. “Loading and Control Policies for a Flexible Manufacturing System.” International Journal of Production Research 19: 481–490.10.1080/00207548108956679
  • Steger-Jensen, K., and C. Svensson. 2004. “Issues of Mass Customisation and Supporting IT-Solutions.” Computers in Industry 54: 83–103.10.1016/j.compind.2003.07.007
  • Stevenson, M., and C. Silva. 2008. “Theoretical Development of a Workload Control Methodology: Evidence from Two Case Studies.” International Journal of Production Research 46: 3107–3131.10.1080/00207540601039791
  • Suri, R. 1998. Quick Response Manufacturing: A Company-wide Approach to Lead Time Reduction. Portland, ME: Productivity Press.
  • Thürer, M., M. Stevenson, and C. Silva. 2011. “Three Decades of Workload Control Research: A Systematic Review of the Literature.” International Journal of Production Research 49: 6905–6935.10.1080/00207543.2010.519000
  • Thürer, M., C. Silva, M. Stevenson, and M. Land. 2012. “Improving the Applicability of Workload Control (WLC): The Influence of Sequence-dependent Set-up times on Workload Controlled Job Shops.” International Journal of Production Research 50: 6419–6430.10.1080/00207543.2011.648275
  • Weng, M. X., Z. Wu, G. Qi, and L. Zheng. 2008. “Multi-agent-based Workload Control for Make-to-order Manufacturing.” International Journal of Production Research 46: 2197–2213.10.1080/00207540600969758

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.