Integrating order acceptance decisions with flexible due dates in a production planning model with load-dependent lead times

, &
Pages 3810-3822 | Received 03 Mar 2014, Accepted 21 Nov 2014, Published online: 16 Dec 2014

References

  • Akartunalı, K., and Andrew J. Miller. 2009. “A Heuristic Approach for Big Bucket Multi-level Production Planning Problems.” European Journal of Operational Research 193 (2): 396–411.10.1016/j.ejor.2007.11.033
  • Aouam, T., and N. Brahimi. 2013. “Integrated Production Planning and Order Acceptance under Uncertainty: A Robust Optimization Approach.” European Journal of Operational Research 228 (3): 504–515.10.1016/j.ejor.2013.02.010
  • Aouam, T., and R. Uzsoy. 2012. “Chance-constraint-based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-dependent Lead Times.” In Decision Policies for Production Networks, edited by Dieter Armbruster and Karl G. Kempf, 173–208. Boston, MA: Springer.10.1007/978-0-85729-644-3
  • Aouam, T., and R. Uzsoy. Forthcoming. “Zero-order Production Planning Models with Stochastic Demand and Workload-dependent Lead Times.” International Journal of Production Research 1–19. doi:10.1080/00207543.2014.935514.
  • Asmundsson, J. M., R. L. Rardin, and R. Uzsoy. 2006. “Tractable Nonlinear Production Planning Models for Semiconductor Wafer Fabrication Facilities.” IEEE Transactions on Semiconductor Manufacturing 19: 95–111.10.1109/TSM.2005.863214
  • Asmundsson, J. M., R. L. Rardin, C. H. Turkseven, and R. Uzsoy. 2009. “Production Planning with Resources Subject to Congestion.” Naval Research Logistics 56: 142–157.10.1002/nav.v56:2
  • Beraldi, Patrizia, Gianpaolo Ghiani, Antonio Grieco, and Emanuela Guerriero. 2008. “Rolling-horizon and Fix-and-relax Heuristics for the Parallel Machine Lot-sizing and Scheduling Problem with Sequence-dependent Set-up Costs.” Computers & Operations Research 35 (11): 3644–3656.
  • Brahimi, N. 2014. “A Relax-and-fix Heuristic for a Production Planning Problem with Order Acceptance and Flexible Due Dates.” Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management, Bali, Indonesia, January 7–9.
  • Buzacott, John A., and J. George Shanthikumar. 1993. Stochastic Models of Manufacturing Systems. New York: Prentice Hall.
  • Charnsirisakskul, Kasarin, Paul M. Griffin, and Pinar Keskinocak. 2004. “Order Selection and Scheduling with Leadtime Flexibility.” IIE Transactions 36 (7): 697–707. doi:10.1080/07408170490447366.10.1080/07408170490447366
  • Defregger, F., and H. Kuhn. 2005. “Markov Decision Models for Order Acceptance/Rejection Problems.” Fifth International Conference on Analysis of Manufacturing Systems – Production Management, May, S.265–272.
  • Ettl, M., G. Feigin, G. Y. Lin, and D. D. Yao. 2000. “A Supply Network Model with Base-Stock Control and Service Requirements.” Operations Research 48: 216–232.10.1287/opre.48.2.216.12376
  • Federgruen, Awi, and Michal Tzur. 1999. “Time-partitioning Heuristics: Application to One Warehouse, Multiitem, Multiretailer Lot-sizing Problems.” Naval Research Logistics 46 (5): 463–486.10.1002/(ISSN)1520-6750
  • Federgruen, A., J. Meissner, and M. Tzur. 2007. “Progressive Interval Heuristics for Multi-item Capacitated Lot-sizing Problems.” Operations Research 55 (3): 490–502.10.1287/opre.1070.0392
  • Ferreira, D., R. Morabito, and S. Rangel. 2010. “Relax and Fix Heuristics to Solve One-stage One-machine Lot-scheduling Models for Small-scale Soft Drink Plants.” Computers & Operations Research 37 (4): 684–691.
  • Geunes, J., K. Taaffe, and H. E. Romeijn. 2002. “Models for Integrated Production Planning and Order Selection.” Proceedings of the 2002 Industrial Engineering Research Conference (IERC), Orlando.
  • Geunes, J., H. E. Romeijn, and K. Taaffe. 2006. “Requirements Planning with Pricing and Order Selection Flexibility.” Operations Research 54 (2): 394–401.10.1287/opre.1050.0255
  • Graves, S. C. 1986. “A Tactical Planning Model for a Job Shop.” Operations Research 34: 552–533.
  • Hackman, Steven T. 2008. Production Economics: Integrating the Microeconomic and Engineering Perspectives. Berlin: Springer.
  • Hopp, W. J., and M. L. Spearman. 2001. Factory Physics: Foundations of Manufacturing Management. Boston, MA: Irwin/McGraw-Hill.
  • Ivanescu, C. V., J. C. Fransoo, and J. M. Bertrand. 2002. “Makespan Estimation and Order Acceptance in Batch Process Industries When Processing times Are Uncertain.” OR Spectrum 24 (4): 467–495.10.1007/s00291-002-0108-0
  • Jacobs, F. Robert, D. William Berry, Clay Whybark, and Thomas Vollmann. 2011. Manufacturing Planning and Control for Supply Chain Management. McGrawHill. eISBN 9780071750325.
  • Karmarkar, U. S. 1989. “Capacity Loading and Release Planning with Work-in-progress (Wip) and Lead-times.” Journal of Manufacturing and Operations Management 2: 105–123.
  • Kefeli, A., R. Uzsoy, Y. Fathi, and M. Kay. 2011. “Using a Mathematical Programming Model to Examine the Marginal Price of Capacitated Resources.” International Journal of Production Economics 131 (1): 383–391.10.1016/j.ijpe.2010.03.018
  • Lee, Chung-Yee, Sila Çetinkaya, and Albert P. M. Wagelmans. 2001. “A Dynamic Lot-sizing Model with Demand Time Windows.” Management Science 47 (10): 1384–1395.10.1287/mnsc.47.10.1384
  • Merzifonluoğlu, Yasemin, and Joseph Geunes. 2006. “Uncapacitated Production and Location Planning Models with Demand Fulfillment Flexibility.” International Journal of Production Economics 102 (2): 199–216.10.1016/j.ijpe.2005.02.011
  • Missbauer, H. 2002. “Aggregate Order Release Planning for Time-varying Demand.” International Journal of Production Research 40: 688–718.
  • Missbauer, H., and R. Uzsoy. 2011. “Optimization Models for Production Planning.” In Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook, edited by K. G. Kempf, P. Keskinocak and R. Uzsoy, 437–507. New York: Springer.10.1007/978-1-4419-6485-4
  • Pahl, J., S. Voß, and D. L. Woodruff. 2005. “Production Planning with Load Dependent Lead times.” 4OR 3: 257–302.10.1007/s10288-005-0083-9
  • Pahl, J., S. Voß, and D. L. Woodruff. 2007. “Production Planning with Load Dependent Lead times: An Update of Research.” Annals of Operations Research 153: 297–345.10.1007/s10479-007-0173-5
  • Pochet, Yves, and Laurence A. Wolsey. 2006. Production Planning by Mixed Integer Programming. New York: Springer.
  • Slotnick, S. A. 2011. “Order Acceptance and Scheduling: A Taxonomy and Review.” European Journal of Operational Research 212 (1): 1–11.10.1016/j.ejor.2010.09.042
  • Srinivasan, A., M. Carey, and T. E. Morton. 1988. Resource Pricing and Aggregate Scheduling in Manufacturing Systems. Pittsburgh, PA: Graduate School of Industrial Administration, Carnegie-Mellon University.
  • Stadtler, Hartmut. 2003. “Multilevel Lot Sizing with Setup times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-sizing Windows.” Operations Research 51 (3): 487–502.10.1287/opre.51.3.487.14949
  • Taha, Hamdy A. 2010. Operations Research: An Introduction. 9th ed. Prentice Hall.
  • Toso, E. A. V., R. Morabito, and A. R. Clark. 2009. “Lot Sizing and Sequencing Optimisation at an Animal-feed Plant.” Computers & Industrial Engineering 57 (3): 813–821.
  • Voss, S., and D. L. Woodruff. 2003. Introduction to Computational Optimization Models for Production Planning in a Supply Chain. Berlin: Springer.10.1007/978-3-540-24764-7
  • Wolsey, Laurence A. 1998. Integer Programming. New York: Wiley.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.