301
Views
6
CrossRef citations to date
0
Altmetric
Articles

Assessing scheduling policies in a permutation flowshop with common due dates

&
Pages 5742-5754 | Received 26 Aug 2014, Accepted 27 Nov 2014, Published online: 24 Dec 2014

References

  • Agnetis, A., J. C. Billaut, S. Gawiejnowicz, D. Pacciarelli, and A. Soukhal. 2014. Multiagent Scheduling: Models and Algorithms. Berlin: Springer-Verlag.
  • Akkan, C. 1997. “Finite-capacity Scheduling-based Planning for Revenue-based Capacity Management.” European Journal of Operational Research 100 (1): 170–179.
  • Armentano, V. A., and D. P. Ronconi. 1999. “Tabu Search for Total Tardiness Minimization in Flowshop Scheduling Problems.” Computers & Operations Research 26 (3): 219–235.
  • Birman, M., and G. Mosheiov. 2004. “A Note on a Due-date Assignment on a Two-machine Flow-shop.” Computers & Operations Research 31 (3): 473–480.
  • Blazewicz, J., E. Pesch, M. Sterna, and F. Werner. 2004. “Flow Shop Scheduling with Late Work Criterion -- Choosing the Best Solution Strategy.” In Proceedings, Applied Computing. Second Asian Applied Computing Conference, AACC 2004, Kathmandu, Nepal, October 29-31, 2004. Vol. 3285/2004, Lecture Notes in Computer Science, 68–75. Berlin/Heidelberg: Springer.
  • Blazewicz, J., E. Pesch, M. Sterna, and F. Werner. 2008. “Metaheuristic Approaches for the Two-machine Flow-shop Problem with Weighted Late Work Criterion and Common Due Date.” Computers & Operations Research 35 (2): 574–599.
  • Della Croce, F., J. N. D. Gupta, and R. Tadei. 2000. “Minimizing Tardy Jobs in a Flowshop with Common Due Date.” European Journal of Operational Research 120 (2): 375–381.
  • Fernandez-Viagas, V., and J. M. Framinan. 2014. “On Insertion Tie-breaking Rules in Heuristics for the Permutation Flowshop Scheduling Problem.” Computers & Operations Research 45: 60–67.
  • Framinan, J. M., and R. Leisten. 2008. “Total Tardiness Minimisation in Permutations Flow Shops: A Simple Approach Based on a Variable Greedy Algorithm.” International Journal of Production Research 46 (22): 6479–6498.
  • Framinan, J. M., and R. Leisten. 2010. “Available-to-promise (ATP) Systems: A Classification and Framework for Analysis.” International Journal of Production Research 48 (11): 3079–3103.
  • Frederix, F. 2001. “An Extended Enterprise Planning Methodology for the Discrete Manufacturing Industry.” European Journal of Operational Research 129 (2): 317–325.
  • Garey, M. R., D. S. Johnson, and R. Sethi. 1976. “The Complexity of Flowshop and Jobshop Scheduling.” Mathematics of Operations Research 1 (2): 117–129.
  • Gelders, L. F., and N. Sambandam. 1978. “Four Simple Heuristics for Scheduling a Flowshop.” International Journal of Production Research 16 (3): 221–231.
  • Graham, R., E. L. Lawler, J. Lenstra, and A. H. G. Rinnooy Kan. 1979. “Optimization and Approximation in Deterministic Sequencing and Scheduling: A Survey.” Annals of Discrete Mathematics 5: 287–326.
  • Gupta, J. N. D., and E. F. Stafford. 2006. “Flowshop Scheduling Research After Five Decades.” European Journal of Operational Research 169 (3): 699–711.
  • Hasija, S., and C. Rajendran. 2004. “Scheduling in Flowshops to Minimize Total Tardiness of Jobs.” International Journal of Production Research 42 (11): 2289–2301.
  • Huynh-Tuong, N., and A. Soukhal. 2009. “Interfering Job Set Scheduling on Two-operation Three-machine Flowshop.” In IEEE-RIVF International Conference on Computing and Communication Technologies: Research, Innovation and Vision for the Future, RIVF 2009, Da Nang, 1–5.
  • Johnson, S. M. 1954. “Optimal Two-stages and Three-stage Production Schedules with Setup Times Included.” Naval Research Logistics Quarterly 1: 61–67.
  • Khelifati, S. L., and F. Bouzid-Sitayeb. 2011a. “A Multi-agent Scheduling Approach for the Joint Scheduling of Jobs and Maintenance Operations in the Flow Shop Sequencing Problem.” Lecture Notes in Computer Science 6923 LNAI (PART 2): 60–69.
  • Khelifati, S. L., and F. Bouzid-Sitayeb. 2011b. “A Sequantial Distributed Approach for the Joint Scheduling of Jobs and Maintenance Operations in the Flowshop Sequencing Problem.” In International Conference on Intelligent Systems Design and Applications, ISDA, Cordoba, 420–425.
  • Lee, C. Y. 1997. “Minimizing the Makespan in the Two-machine Flowshop Scheduling Problem with an Availability Constraint.” Operations Research Letters 20 (3): 129–139.
  • Lee, W. C., S. K. Chen, C. W. Chen, and C. C. Wu. 2011. “A Two-machine Flowshop Problem with Two Agents.” Computers and Operations Research 38 (1): 98–104.
  • Luo, W., L. Chen, and G. Zhang. 2012. “Approximation Schemes for Two-machine Flowshop Scheduling with Two Agents.” Journal of Combinatorial Optimization 24 (3): 229–239.
  • Montgomery, D. C. 2005. Design and Analysis of Experiments. 6th ed. New York: John Wiley and Sons.
  • Mor, B., and G. Mosheiov. 2014. “Polynomial Time Solutions for Scheduling Problems on a Proportionate Flowshop with Two Competing Agents.” Journal of the Operational Research Society 65 (1): 151–157.
  • Nagano, M. S., R. Ruiz, and L. A. Nogueira Lorena. 2008. “A Constructive Genetic Algorithm for Permutation Flowshop Scheduling.” Computers & Industrial Engineering 55 (1): 195–207.
  • Perez-Gonzalez, P., and J. M. Framinan. 2009. “Scheduling Permutation Flowshops with Initial Availability Constraint: Analysis of Solutions and Constructive Heuristics.” Computers & Operations Research 36 (10): 2866–2876.
  • Perez-Gonzalez, P., and J. M. Framinan. 2014. “A Common Framework and Taxonomy for Multicriteria Scheduling Problems with Interfering and Competing Jobs: Multi-agent Scheduling Problems.” European Journal of Operational Research 235 (1): 1–16.
  • Ribas, I., R. Companys, and X. Tort-Martorell. 2010. “Comparing Three-step Heuristics for the Permutation Flow Shop Problem.” Computers and Operations Research 37 (12): 2062–2070.
  • Sakuraba, S., D. P. Ronconi, and F. Sourd. 2009. “Scheduling in a Two-machine Flowshop for the Minimization of the Mean Absolute Deviation from a Common Due Date.” Computers & Operations Research 36 (1): 60–72.
  • Sarper, H. 1995. “Minimizing the Sum of Absolute Deviations About a Common Due Date for the Two-machine Flow Shop Problem.” Applied Mathematical Modelling 19 (3): 153–161.
  • Taillard, E. D. 1990. “Some Efficient Heuristic Methods for the Flow Shop Sequencing Problem.” European Journal of Operational Research 47 (1): 65–74.
  • Taillard, E. D. 1993. “Benchmarks for Basic Scheduling Problems.” European Journal of Operational Research 64 (2): 278–285.
  • Taillard, E. D.. 2014. “Scheduling Instances: Summary of Best Known Lower and Upper Bounds of Taillard’s Instances.” http://mistic.heig-vd.ch/taillard.
  • T’kindt, V., and J. C. Billaut. 2002. Multicriteria Scheduling: Theory, Models and Algorithms. 2nd ed. Berlin: Springer.
  • Tzeng, Y. R., and C. L. Chen. 2012. “A Hybrid EDA with ACS for Solving Permutation Flow Shop Scheduling.” The International Journal of Advanced Manufacturing Technology 60 (9--12): 1139–1147.
  • Unal, A. T., R. Uzsoy, and A. S. Kiran. 1997. “Rescheduling on a Single Machine with Part-type Dependent Setup Times and Deadlines.” Annals of Operations Research 70: 93–113.
  • Vallada, E., R. Ruiz, and J. M. Framinan. 2015. “New Hard Benchmark for Flowshop Scheduling Problems Minimising Makespan.” European Journal of Operational Research 240 (3): 666–677.
  • Vig, M. M., and K. J. Dooley. 1991. “Dynamic Rules for Due-date Assignment.” International Journal of Production Research 29 (7): 1361–1377.
  • Xu, X. Q., and D. M. Lei. 2014. “A Parallel Iterated Local Search for Two-agent Flow Shop Scheduling.” Advanced Materials Research 926--930: 3476–3484.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.