390
Views
10
CrossRef citations to date
0
Altmetric
Original Articles

An activity-list-based nested partitions algorithm for resource-constrained project scheduling

, &
Pages 4744-4758 | Received 31 Dec 2014, Accepted 17 Jun 2015, Published online: 27 Jul 2015

References

  • Alcaraz, J., and C. Maroto. 2001. “A Robust Genetic Algorithm for Resource Allocation in Project Scheduling.” Annals of Operations Research 102 (1–4): 83–109.10.1023/A:1010949931021
  • Alcaraz, J., C. Maroto, and R. Ruiz. 2004. “Improving the Performance of Genetic Algorithms for the RCPS Problem.” Proceedings of the ninth international workshop on project management and scheduling,  Nancy, 40–43.
  • Artigues, C., S. Demassey, and E. Neron. eds. 2013. Resource-constrained Project Scheduling: Models, Algorithms, Extensions and Applications. Hoboken, NJ: John Wiley.
  • Blazewicz, J., J. K. Lenstra, and A. H. G. Kan. 1983. “Scheduling Subject to Resource Constraints: Classification and Complexity.” Discrete Applied Mathematics 5 (1): 11–24.10.1016/0166-218X(83)90012-4
  • Boctor, F. F. 1996. “Resource-constrained Project Scheduling by Simulated Annealing.” International Journal of Production Research 34 (8): 2335–2351.10.1080/00207549608905028
  • Bouffard, V., and J. A. Ferland. 2007. “Improving Simulated Annealing with Variable Neighborhood Search to Solve the Resource-constrained Scheduling Problem.” Journal of Scheduling 10 (6): 375–386.10.1007/s10951-007-0043-7
  • Brucker, P. 2002. “Scheduling and Constraint Propagation.” Discrete Applied Mathematics 123 (1): 227–256.10.1016/S0166-218X(01)00342-0
  • Chen, W., Y. J. Shi, and H. F. Teng. 2010. “An Efficient Hybrid Algorithm for Resource-constrained Project Scheduling.” Information Sciences 180 (6): 1031–1039.10.1016/j.ins.2009.11.044
  • Chen, W., L. Pi, and L. Shi. 2011. “An Enhanced Nested Partitions Algorithm Using Solution Value Prediction.” IEEE Transactions on Automation Science and Engineering 8 (2): 412–419.10.1109/TASE.2010.2090655
  • Chen, W., S. Gao, C. H. Chen, and L. Shi. 2014. “An Optimal Sample Allocation Strategy for Partition-based Random Search.” IEEE Transactions on Automation Science and Engineering 11 (1): 177–186.10.1109/TASE.2013.2251881
  • Debels, D., B. De Reyck, R. Leus, and M. Vanhoucke. 2006. “A Hybrid Scatter Search/Electromagnetism Meta-heuristic for Project Scheduling.” European Journal of Operational Research 169 (2): 638–653.10.1016/j.ejor.2004.08.020
  • Demeulemeester, E., and W. Herroelen. 2002. Project Scheduling-A Research Handbook. Boston, MA: Kluwer Academic.
  • Depuy, G. W., and G. E. Whitehouse. 2001. “A Simple and Effective Heuristic for the Resource Constrained Project Scheduling Problem.” International Journal of Production Research 39 (14): 3275–3287.10.1080/00207540110060608
  • Fahmy, A., T. M. Hassan, and H. Bassioni. 2014. “Improving RCPSP Solutions Quality with Stacking Justification-application with Particle Swarm Optimization.” Expert Systems with Applications 41 (13): 5870–5881.10.1016/j.eswa.2014.03.027
  • Gonçalves, J. F., M. G. Resende, and J. J. Mendes. 2011. “A Biased Random-key Genetic Algorithm With Forward-Backward Improvement For The Resource Constrained Project Scheduling Problem.” Journal of Heuristics 17 (5): 467–486.10.1007/s10732-010-9142-2
  • Hartmann, S. 2002. “A Self-adapting Genetic Algorithm for Project Scheduling under Resource Constraints.” Naval Research Logistics 49 (5): 433–448.10.1002/(ISSN)1520-6750
  • Hartmann, S., and R. Kolisch. 2000. “Experimental Evaluation of State-of-the-art Heuristics for the Resource-constrained Project Scheduling Problem.” European Journal of Operational Research 127 (2): 394–407.10.1016/S0377-2217(99)00485-3
  • Kelley, J. E. 1963. “The Critical-path Method: Resources Planning and Scheduling.” Industrial Scheduling 13: 347–365.
  • Kochetov, Y., and A. Stolyar. 2003. “Evolutionary Local Search with Variable Neighborhood for the Resource Constrained Project Scheduling Problem.” In Proceedings of the 3rd Iternational Workshop of Computer Science and Information Technologies, Vol. 132, Ufa, Russia.
  • Kolisch, R. 1996a. “Efficient Priority Rules for the Resource-constrained Project Scheduling Problem.” Journal of Operations Management 14 (3): 179–192.10.1016/0272-6963(95)00032-1
  • Kolisch, R. 1996b. “Serial and Parallel Resource-constrained Project Scheduling Methods Revisited: Theory and Computation.” European Journal of Operational Research 90 (2): 320–333.10.1016/0377-2217(95)00357-6
  • Kolisch, R., and A. Drexl. 1996. “Adaptive Search for Solving Hard Project Scheduling Problems.” Naval Research Logistics 43 (1): 23–40.10.1002/(ISSN)1520-6750
  • Kolisch, R., and S. Hartmann. 1999. Heuristic Algorithms for the Resource-constrained Project Scheduling Problem: Classification and Computational Analysis. New York: Springer.
  • Kolisch, R., and S. Hartmann. 2006. “Experimental Investigation of Heuristics for Resource-constrained Project Scheduling: An Update.” European Journal of Operational Research 174 (1): 23–37.10.1016/j.ejor.2005.01.065
  • Kolisch, R., and A. Sprecher. 1997. “PSPLIB – a Project Scheduling Problem Library.” European Journal of Operational Research 96 (1): 205–216.10.1016/S0377-2217(96)00170-1
  • Kolisch, R., A. Sprecher, and A. Drexl. 1995. “Characterization and Generation of a General Class of Resource-constrained Project Scheduling Problems.” Management Science 41 (10): 1693–1703.10.1287/mnsc.41.10.1693
  • Koné, O., C. Artigues, P. Lopez, and M. Mongeau. 2011. “Event-based MILP Models for Resource-constrained Project Scheduling Problems.” Computers and Operations Research 38 (1): 3–13.10.1016/j.cor.2009.12.011
  • Laborie, P. 2005. “Complete MCS-based Search: Application to Resource Constrained Project Scheduling.” In IJCAI, edited by  L. P. Kaelbling and  A. Saffiotti, 181–186, Gentilly Cedex: Professional Book Center.
  • Nasiri, M. M. 2013. “A Pseudo Particle Swarm Optimization for the RCPSP.” The International Journal of Advanced Manufacturing Technology 65 (5–8): 909–918.10.1007/s00170-012-4227-8
  • Palpant, M., C. Artigues, and P. Michelon. 2004. “LSSPER: Solving the Resource-constrained Project Scheduling Problem with Large Neighbourhood Search.” Annals of Operations Research 131 (1–4): 237–257.10.1023/B:ANOR.0000039521.26237.62
  • Patterson, J. H., and W. D. Huber. 1974. “A Horizon-varying, Zero-one Approach to Project Scheduling.” Management Science 20 (6): 990–998.10.1287/mnsc.20.6.990
  • Shi, L., and S. Ólafsson. 2000. “Nested Partitions Method for Global Optimization.” Operations Research 48 (3): 390–407.10.1287/opre.48.3.390.12436
  • Shukla, S. K., Y. J. Son, and M. K. Tiwari. 2008. “Fuzzy-based Adaptive Sample-sort Simulated Annealing for Resource-constrained Project Scheduling.” The International Journal of Advanced Manufacturing Technology 36 (9–10): 982–995.10.1007/s00170-006-0907-6
  • Tormos, P., and A. Lova. 2003a. “An Efficient Multi-pass Heuristic for Project Scheduling with Constrained Resources.” International Journal of Production Research 41 (5): 1071–1086.10.1080/0020754021000033904
  • Tormos, P., and A. Lova. 2003b. “Integrating Heuristics for Resource Constrained Project Scheduling: One Step Forward.” Technical Report, Department of Statistics and Operations Research, Universidad Politecnica De Valencia.
  • Valls, V., and F. Ballestı́n, and S. Quintanilla. 2005. “Justification and RCPSP: A Technique That Pays.” European Journal of Operational Research 165 (2): 375–386.10.1016/j.ejor.2004.04.008
  • Valls, V., and F. Ballestı́n, and S. Quintanilla. 2008. “A Hybrid Genetic Algorithm for the Resource-constrained Project Scheduling Problem.” European Journal of Operational Research 185 (2): 495–508.10.1016/j.ejor.2006.12.033
  • Wu, T., L. Shi, and N. A. Duffie. 2010. “An HNP-MP Approach for the Capacitated Multi-item Lot Sizing Problem with Setup times.” IEEE Transactions on Automation Science and Engineering 7 (3): 500–511.
  • Wu, T., L. Shi, J. Geunes, and K. Akartunalı. 2011. “An Optimization Framework for Solving Capacitated Multi-level Lot-sizing Problems with Backlogging.” European Journal of Operational Research 214 (2): 428–441.10.1016/j.ejor.2011.04.029
  • Wu, W., J. Wei, X. Guan, and L. Shi. 2012. “A Hybrid Nested Partitions Algorithm for Scheduling Flexible Resource in Flow Shop Problem.” International Journal of Production Research 50 (10): 2555–2569.10.1080/00207543.2010.539278
  • Zamani, R. 2013. “A Competitive Magnet-based Genetic Algorithm for Solving the Resource-constrained Project Scheduling Problem.” European Journal of Operational Research 229 (2): 552–559.10.1016/j.ejor.2013.03.005
  • Zhang, H. H., L. Shi, R. R. Meyer, D. Nazareth, and W. D. D'Souza. 2009. “Solving Beam-angle Selection and Dose Optimization Simultaneously via High-throughput Computing.” INFORMS Journal on Computing 21 (3): 427–444.10.1287/ijoc.1080.0297
  • Zheng, H. Y., and L. Wang. 2014. “An Effective Teaching–Learning-based Optimisation Algorithm for RCPSP with Ordinal Interval Numbers.” International Journal of Production Research. 53 (6): 1777–1790.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.