955
Views
66
CrossRef citations to date
0
Altmetric
Original Articles

An enhanced possibilistic programming approach for reliable closed-loop supply chain network design

, , &
Pages 1358-1387 | Received 01 Nov 2014, Accepted 16 Jun 2015, Published online: 24 Jul 2015

References

  • Ben-Tal, A., and A. Nemirovski. 2000. “Robust Solutions of Linear Programming Problems Contaminated with Uncertain Data.” Mathematical Programming 88 (3): 411–424.10.1007/PL00011380
  • Berman, O., D. Krass, and M. B. Menezes. 2007. “Facility Reliability Issues in Network p-Median Problems: Strategic Centralization and Co-location Effects.” Operations Research 55 (2): 332–350.10.1287/opre.1060.0348
  • Berman, O., D. Krass, and M. B. Menezes. 2009. “Locating Facilities in the Presence of Disruptions and Incomplete Information.” Decision Sciences 40 (4): 845–868.10.1111/deci.2009.40.issue-4
  • Bertsimas, D., and M. Sim. 2003. “Robust Discrete Optimization and Network Flows.” Mathematical Programming 98 (1–3): 49–71.10.1007/s10107-003-0396-4
  • Chongvilaivan, A. 2011. Managing Global Supply Chain Disruptions: Experience from Thailand’s 2011 Flooding. http://web1.iseas.edu.sg/wp.../08/Managing-Global-Supply-Aekapol.pdf/.
  • Cui, T., Y. Ouyang, and Z. J. M. Shen. 2010. “Reliable Facility Location Design under the Risk of Disruptions.” Operations Research 58: 998–1011.10.1287/opre.1090.0801
  • Dekker, R., M. Fleischmann, and K. Inderfurth, 2004. Reverse Logistics: Quantitative Models for Closed-loop Supply Chains. Berlin Heidelberg: Springer-Verlag.
  • Drezner, Z. 1987. “Heuristic Solution Methods for Two Location Problems with Unreliable Facilities.” Journal of the Operational Research Society 38: 509–514.10.1057/jors.1987.88
  • Dubois, D., H. M. Prade, H. Farreny, R. Martin-Clouaire, and C. Testemale. 1988. Possibility Theory: An Approach to Computerized Processing of Uncertainty. Vol. 2. New York: Plenum press.10.1007/978-1-4684-5287-7
  • Easwaran, G., and H. Üster. 2010. “A Closed-loop Supply Chain Network Design Problem with Integrated Forward and Reverse Channel Decisions.” IIE Transactions 42 (11): 779–792.10.1080/0740817X.2010.504689
  • El-Sayed, M., N. Afia, and A. El-Kharbotly. 2010. “A Stochastic Model for Forward–Reverse Logistics Network Design under Risk.” Computers & Industrial Engineering 58 (3): 423–431.
  • Erol, I., S. Sencer, and R. Sari. 2011. “A New Fuzzy Multi-criteria Framework for Measuring Sustainability Performance of a Supply Chain.” Ecological Economics 70 (6): 1088–1100.10.1016/j.ecolecon.2011.01.001
  • Fleischmann, M., P. Beullens, J. M. Bloemhof-Ruwaard, and L. N. Wassenhove. 2001. “The Impact of Product Recovery on Logistics Network Design.” Production and Operations Management 10: 156–173.
  • Ghodratnama, A., S. A. Torabi, and R. Tavakkoli-Moghaddam. 2012. “Credibility-based Fuzzy Programming Models to Solve the Budget-constrained Flexible Flow Line Problem.” Iranian Journal of Fuzzy Systems 9 (6): 1–29.
  • Gutiérrez, G. J., P. Kouvelis, and A. A. Kurawarwala. 1996. “A Robustness Approach to Uncapacitated Network Design Problems.” European Journal of Operational Research 94 (2): 362–376.10.1016/0377-2217(95)00160-3
  • Hasani, A., S. H. Zegordi, and E. Nikbakhsh. 2012. “Robust Closed-loop Supply Chain Network Design for Perishable Goods in Agile Manufacturing under Uncertainty.” International Journal of Production Research 50 (16): 4649–4669.10.1080/00207543.2011.625051
  • Hatefi, S. M., and F. Jolai. 2014. “Robust and Reliable Forward–Reverse Logistics Network Design under Demand Uncertainty and Facility Disruptions.” Applied Mathematical Modelling 38 (9): 2630–2647.10.1016/j.apm.2013.11.002
  • Hatefi, S. M., F. Jolai, S. A. Torabi, and R. Tavakkoli-Moghaddam. 2015. “A Credibility-constrained Programming for Reliable Forward–Reverse Logistics Network Design under Uncertainty and Facility Disruptions.” International Journal of Computer Integrated Manufacturing 28 (6): 664–678.10.1080/0951192X.2014.900863
  • Kannan, G., P. Sasikumar, and K. Devika. 2010. “A Genetic Algorithm Approach for Solving a Closed Loop Supply Chain Model: A Case of Battery Recycling.” Applied Mathematical Modelling 34: 655–670.10.1016/j.apm.2009.06.021
  • Kara, S. S., and S. Onut. 2010. “A Two-stage Stochastic and Robust Programming Approach to Strategic Planning of a Reverse Supply Network: The Case of Paper Recycling.” Expert Systems with Applications 37 (9): 6129–6137.10.1016/j.eswa.2010.02.116
  • Keyvanshokooh, E., M. Fattahi, S. Seyed-Hosseini, and R. Tavakkoli-Moghaddam. 2013. “A Dynamic Pricing Approach for Returned Products in Integrated Forward/Reverse Logistics Network Design.” Applied Mathematical Modelling 37: 10182–10202.10.1016/j.apm.2013.05.042
  • Kilgore, M. 2003. Mitigating Supply Chain Risks. White paper. Atlanta: Chainalytics LLC.
  • Kleindorfer, P. R., and G. H. Saad. 2005. “Managing Disruption Risks in Supply Chains.” Production and Operations Management 14 (1): 53–68.
  • Klibi, W., A. Martel, and A. Guitouni. 2010. “The Design of Robust Value-creating Supply Chain Networks: A Critical Review.” European Journal of Operational Research 203: 283–293.10.1016/j.ejor.2009.06.011
  • Lee, D. H., and M. Dong. 2008. “A Heuristic Approach to Logistics Network Design for End-of-lease Computer Products Recovery.” Transportation Research Part E: Logistics and Transportation Review 44 (3): 455–474.10.1016/j.tre.2006.11.003
  • Li, X., and Y. Ouyang. 2010. “A Continuum Approximation Approach to Reliable Facility Location Design under Correlated Probabilistic Disruptions.” Transportation Research Part B: Methodological 44 (4): 535–548.10.1016/j.trb.2009.09.004
  • Liberatore, F., M. P. Scaparra, and M. S. Daskin. 2011. “Analysis of Facility Protection Strategies against an Uncertain Number of Attacks: The Stochastic R-interdiction Median Problem with Fortification.” Computers & Operations Research 38 (1): 357–366.
  • Lim, M. K., M. S. Daskin, A. Bassamboo, and S. Chopra. 2010. “A Facility Reliability Problem: Formulation, Properties, and Algorithm.” Naval Research Logistics (NRL) 57 (1): 58–70.
  • Listeş, O., and R. Dekker. 2005. “A Stochastic Approach to a Case Study for Product Recovery Network Design.” European Journal of Operational Research 160 (1): 268–287.10.1016/j.ejor.2001.12.001
  • Liu, B. 2009. “Fuzzy Programming.” In Theory and Practice of Uncertain Programming,  57–82. Berlin Heidelberg: Springer.10.1007/978-3-540-89484-1
  • Massey, R. 2011. “Tsunami Forces Sunderland Nissan Plant to Shut down for Three Days because of Shortage of Parts from Japan.” Daily Mail, April 7.
  • Meade, L., J. Sarkis, and A. Presley. 2007. “The Theory and Practice of Reverse Logistics.” International Journal of Logistics Systems and Management 3 (1): 56–84.10.1504/IJLSM.2007.012070
  • Mousazadeh M., S. A. Torabi, and M. S. Pishvaee. 2014. “Green and Reverse Logistics Management under Fuzziness.” In Supply Chain Management under Fuzziness, Studies in Fuzziness and Soft Computing. Vol. 313, edited by C. Kahraman and B. Öztaysi, 607–637. Berlin Heidelberg: Springer-Verlag.
  • Mulvey, J. M., R. J. Vanderbei, and S. A. Zenios. 1995. “Robust Optimization of Large-scale Systems.” Operations Research 43 (2): 264–281.10.1287/opre.43.2.264
  • Pawlak, Z. 1982. “Rough Sets.” International Journal of Computer & Information Sciences 11 (5): 341–356.
  • Peng, P., L. V. Snyder, A. Lim, and Z. Liu. 2011. “Reliable Logistics Networks Design with Facility Disruptions.” Transportation Research Part B: Methodological 45 (8): 1190–1211.10.1016/j.trb.2011.05.022
  • Pishvaee, M. S., and S. A. Torabi. 2010. “A Possibilistic Programming Approach for Closed-loop Supply Chain Network Design under Uncertainty.” Fuzzy Sets and Systems 161 (20): 2668–2683.10.1016/j.fss.2010.04.010
  • Pishvaee, M. S., F. Jolai, and J. Razmi. 2009. “A Stochastic Optimization Model for Integrated Forward/Reverse Logistics Network Design.” Journal of Manufacturing Systems 28 (4): 107–114.10.1016/j.jmsy.2010.05.001
  • Pishvaee, M. S., M. Rabbani, and S. A. Torabi. 2011. “A Robust Optimization Approach to Closed-loop Supply Chain Network Design under Uncertainty.” Applied Mathematical Modelling 35 (2): 637–649.10.1016/j.apm.2010.07.013
  • Pishvaee, M. S., S. A. Torabi, and J. Razmi. 2012. “Credibility-based Fuzzy Mathematical Programming Model for Green Logistics Design under Uncertainty.” Computers & Industrial Engineering 62 (2): 624–632.
  • Pishvaee, M. S., J. Razmi, and S. A. Torabi. 2014. “An Accelerated Benders Decomposition Algorithm for Sustainable Supply Chain Network Design under Uncertainty: A Case Study of Medical Needle and Syringe Supply Chain.” Transportation Research Part E: Logistics and Transportation Review 67: 14–38.10.1016/j.tre.2014.04.001
  • Qi, L., Z. J. M. Shen, and L. V. Snyder. 2010. “The Effect of Supply Disruptions on Supply Chain Design Decisions.” Transportation Science 44 (2): 274–289.10.1287/trsc.1100.0320
  • Ramezani, M., M. Bashiri, and R. Tavakkoli-Moghaddam. 2013. “A New Multi-objective Stochastic Model for a Forward/Reverse Logistic Network Design with Responsiveness and Quality Level.” Applied Mathematical Modelling 37 (1): 328–344.10.1016/j.apm.2012.02.032
  • Sahebjamnia, N., S. A. Torabi, and S. A. Mansouri. 2015. “Integrated Business Continuity and Disaster Recovery Planning: Towards Organizational Resilience.” European Journal of Operational Research 242 (1): 261–273.10.1016/j.ejor.2014.09.055
  • Salehi, N., S. A. Torabi, and N. Sahebjamnia. 2015. “Retail Supply Chain Network Design under Operational and Disruption Risks.” Transportation Research Part E: Logistics and Transportation Review 75: 95–114.10.1016/j.tre.2014.12.015
  • Salema, M. I. G., A. P. Barbosa-Povoa, and A. Q. Novais. 2007. “An Optimization Model for the Design of a Capacitated Multi-product Reverse Logistics Network with Uncertainty.” European Journal of Operational Research 179 (3): 1063–1077.10.1016/j.ejor.2005.05.032
  • Scaparra, M. P., and R. L. Church. 2008. “An Exact Solution Approach for the Interdiction Median Problem with Fortification.” European Journal of Operational Research 189 (1): 76–92.10.1016/j.ejor.2007.05.027
  • Snyder, L. V., and M. S. Daskin. 2005. “Reliability Models for Facility Location: The Expected Failure Cost Case.” Transportation Science 39 (3): 400–416.10.1287/trsc.1040.0107
  • Snyder, L. V., and M. S. Daskin. 2006a. “A Random-key Genetic Algorithm for the Generalized Traveling Salesman Problem.” European Journal of Operational Research 174 (1): 38–53.10.1016/j.ejor.2004.09.057
  • Snyder, L. V., and M. S. Daskin. 2006b. “Stochastic p-robust Location Problems.” IIE Transactions 38 (11): 971–985.10.1080/07408170500469113
  • Snyder, L. V., Z. Atan, P. Peng, Y. Rong, A. J. Schmitt, and B. Sinsoysal. 2012. OR/MS Models for Supply Chain Disruptions: A Review. SSRN 1689882 (Working Paper). http://ssrn.com/abstract=1689882.
  • Souza, G. C. 2013. “Closed-loop Supply Chains: A Critical Review and Future Research.” Decision Sciences 44 (1): 7–38.10.1111/deci.2013.44.issue-1
  • Tang, C. S. 2006. “Perspectives in Supply Chain Risk Management.” International Journal of Production Economics 103 (2): 451–488.10.1016/j.ijpe.2005.12.006
  • Torabi, S. A., H. Rezaei Soufi, and N. Sahebjamnia. 2014. “A New Framework for Business Impact Analysis in Business Continuity Management (with a Case Study).” Safety Science 68: 309–323.10.1016/j.ssci.2014.04.017
  • Torabi, S. A., M. Baghersad, and S. A. Mansouri. 2015. “Resilient Supplier Selection and Order Allocation under Operational and Disruption Risks.” Transportation Research Part E: Logistics and Transportation Review 79: 22–48.10.1016/j.tre.2015.03.005
  • Üster, H., G. Easwaran, E. Akçali, and S. Çetinkaya. 2007. “Benders Decomposition with Alternative Multiple Cuts for a Multi-product Closed-loop Supply Chain Network Design Model.” Naval Research Logistics 54 (8): 890–907.
  • Vahdani, B., R. Tavakkoli-Moghaddam, M. Modarres, and A. Baboli. 2012. “Reliable Design of a Forward/Reverse Logistics Network under Uncertainty: A Robust-M/M/C Queuing Model.” Transportation Research Part E: Logistics and Transportation Review 48 (6): 1152–1168.10.1016/j.tre.2012.06.002
  • Vahdani, B., R. Tavakkoli-Moghaddam, F. Jolai, and A. Baboli. 2013. “Reliable Design of a Closed Loop Supply Chain Network under Uncertainty: An Interval Fuzzy Possibilistic Chance-constrained Model.” Engineering Optimization 45 (6): 745–765.10.1080/0305215X.2012.704029
  • Xu, J., and Z. Zeng. 2012. “A Discrete Time Optimal Control Model with Uncertainty for Dynamic Machine Allocation Problem and Its Application to Manufacturing and Construction Industries.” Applied Mathematical Modelling 36 (8): 3513–3544.10.1016/j.apm.2011.10.031
  • Xu, J., and Z. Zeng. 2014. Fuzzy-like Multiple Objective Multistage Decision Making. Heidelberg: Springer.10.1007/978-3-319-03398-3
  • Xu, J., and X. Zhou. 2013. “Approximation Based Fuzzy Multi-objective Models with Expected Objectives and Chance Constraints: Application to Earth-rock Work Allocation.” Information Sciences 238: 75–95.10.1016/j.ins.2013.02.011
  • Zhang, Y., and G. Huang, 2010. Fuzzy Robust Credibility-constrained Programming for Environmental Management and Planning. Journal of the Air & Waste Management Association 60 (6): 711–721.
  • Zhang, Y. M., G. H. Huang, Q. G. Lin, and H. W. Lu, 2012. Integer Fuzzy Credibility Constrained Programming for Power System Management. Energy 38 (1): 398–405.10.1016/j.energy.2011.11.035

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.