1,725
Views
31
CrossRef citations to date
0
Altmetric
Original Articles

Improving production planning through finite-capacity MRP

, , &
Pages 377-391 | Received 05 Oct 2015, Accepted 06 Apr 2016, Published online: 05 May 2016

References

  • Agrawal, A., I. Minis, and R. Nagi. 2000. “Cycle Time Reduction by Improved MRP-based Production Planning.” International Journal of Production Research 38 (18): 4823–4841.10.1080/00207540050205659
  • Aouam, T., and R. Uzsoy. 2015. “Zero-order Production Planning Models with Stochastic Demand and Workload-dependent Lead times.” International Journal of Production Research 53 (6): 1661–1679.10.1080/00207543.2014.935514
  • Billington, P. J., J. O. Mcclain, and L. J. Thomas. 1983. “Mathematical Programming Approaches to Capacity-constrained MRP Systems: Review, Formulation and Problem Reduction.” Management Science 29 (10): 1126–1141.10.1287/mnsc.29.10.1126
  • Chase, R. B., N. J. Aquilano, and F. R. Jacobs. 1998. Production and Operations Management: Manufacturing and Services. New York: Irwin McGraw-Hill Ed.
  • Chen, K., and P. Ji. 2007. “A Mixed-integer Programming Model for Advanced Planning and Scheduling (APS).” European Journal of Operational Research 181 (1): 515–522.10.1016/j.ejor.2006.06.018
  • Cigolini, R., and T. Rossi. 2008. “Evaluating Supply Chain Integration: A Case Study Using Fuzzy Logic.” Production Planning and Control 19 (3): 242–255.10.1080/09537280801916249
  • Creazza, A., F. Dallari, and T. Rossi. 2012a. “An Integrated Model for Designing and Optimising an International Logistics Network.” International Journal of Production Research 50 (11): 2925–2939.
  • Creazza, A., F. Dallari, and T. Rossi. 2012b. “Applying an Integrated Logistics Network Design and Optimisation Model: The Pirelli Tyre Case.” International Journal of Production Research 50 (11): 3021–3038.
  • Dolgui, A., O. Ben Ammar, F. Hnaien, and M. A. Louly. 2013. “A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty.” Studies in Informatics and Control 22 (3): 255–268.
  • Enns, S. T. 2001. “MRP Performance Effects due to Lot Size and Planned Lead-time Settings.” International Journal of Production Research 39 (3): 461–480.10.1080/00207540010002810
  • Gansterer, M., C. Almeder, and R. F. Harti. 2014. “Simulation-based Optimization Methods for Setting Production Planning Parameters.” International Journal of Production Economics 151: 206–213.
  • Godin, V., and C. Jones. 1969. The Interactive Shop Supervisor, Industrial Engineering, November, 16–22.
  • Goldratt, E. 1980. Optimized Production Timetable: A Revolutionary Program for Industry. In APICS 23rd Annual Conference Proceedings, Los Angeles.
  • Horiguchi, K., N. Raghavan, R. Uzsoy, and S. Venkateswaran. 2001. “Finite-capacity Production Planning Algorithms for a Semiconductor Wafer Fabrication Facility.” International Journal of Production Research 39 (5): 825–842. doi:10.1080/00207540010010253.
  • Ioannou, G., and S. Dimitriou. 2012. “Lead Time Estimation in MRP/ERP for Make-to-order Manufacturing Systems.” International Journal of Production Economics 139 (2): 551–563.10.1016/j.ijpe.2012.05.029
  • Jodlbauer, H., and S. Reitner. 2012. “Material and Capacity Requirements Planning with Dynamic Lead times.” International Journal of Production Research 50 (16): 4477–4492. doi:10.1080/00207543.2011.603707.
  • Jonsson, P., and S. Mattsson. 2006. “A Longitudinal Study of Material Planning Applications in Manufacturing Companies.” International Journal of Operations & Production Management 26: 971–995.10.1108/01443570610682599
  • Kacar, N. B., and R. Uzsoy. 2014. “A Comparison of Multiple Linear Regression Approaches for Fitting Clearing Functions to Empirical Data.” International Journal of Production Research 52 (11): 3164–3184. doi:10.1080/00207543.2013.864052.
  • Kanet, J., and M. Stößlein. 2010. “Integrating Production Planning and Control: Towards a Simple Model for Capacitated ERP.” Production Planning and Control 21 (3): 286–300.10.1080/09537280903363209
  • Lee, H.-G., N. Park, and J. Park. 2009. “A High Performance Finite Capacitated MRP Using a Computational Grid.” International Journal of Production Research 47 (8): 2109–2123.10.1080/00207540802132775
  • Little, J. G. 1961. “A Proof for the Queuing Formula: L= λ W.” Operations Research 9 (3): 383–387.
  • Milne, R. J., C. T. Wang, C. K. Yen, and K. Fordyce. 2012. “Optimized Material Requirements Planning for Semiconductor Manufacturing.” Journal of the Operational Research Society 63 (11): 1566–1577. doi:10.1057/jors.2012.1.
  • Milne, R. J., S. Mahapatra, and C. T. Wang. 2015. “Optimizing Planned Lead times for Enhancing Performance of MRP Systems.” International Journal of Production Economics 167: 220–231.10.1016/j.ijpe.2015.05.013
  • Miltenburg, J. 2001. “Computational Complexity of Algorithms for MRP and JIT Production Planning Problems in Enterprise Resource Planning Systems.” Production Planning and Control 12 (2): 198–209. doi:10.1080/09537280150501293.
  • Molinder, A., and J. Olhager. 1998. “The Effect of MRP Lot Sizing on Actual Cumulative Lead times in Multi-level Systems.” Production Planning and Control 9 (3): 293–302.10.1080/095372898234271
  • Mula, J., R. Poler, and J. P. Garcia. 2006. “MRP with Flexible Constraints: A Fuzzy Mathematical Programming Approach.” Fuzzy Sets and Systems 157 (1): 74–97.10.1016/j.fss.2005.05.045
  • Nagendra, P. B., and S. K. Das. 2001. “Finite Capacity Scheduling Method for MRP with Lot Size Restrictions.” International Journal of Production Research 39 (8): 1603–1623.10.1080/00207540010023600
  • Orlicky, J. A. 1976. Materials Requirement Planning. New York: McGraw-Hill.
  • Ornek, M., and O. Cengiz. 2006. “Capacitated Lot Sizing with Alternative Routings and Overtime Decisions.” International Journal of Production Research 44 (24): 5363–5389.10.1080/00207540600600106
  • Öztürk, C., and A. M. Örnek. 2012. “A MIP Based Heuristic for Capacitated MRP Systems.” Computers and Industrial Engineering 63 (4): 926–942. doi:10.1016/j.cie.2012.06.005.
  • Pandey, P. C., P. Yenradee, and S. Archriyapruek. 2000. “A Finite Capacity Material Requirements Planning System.” Production Planning and Control 11 (2): 113–121.10.1080/095372800232315
  • Reiter, S. 1966. A System for Managing Job Shop Production. Journal of Business 3: 371–393.
  • Rossi, T., and M. Pero. 2011. “A Simulation-based Finite Capacity MRP Procedure Not Depending on Lead-time Estimation.” International Journal of Operational Research 11 (3): 237–261.10.1504/IJOR.2011.041343
  • Segerstedt, A. 1996. “Formulas of MRP.” International Journal of Production Economics 46–47: 127–136. doi:10.1016/0925-5273(95)00163-8.
  • Sun, L., S. S. Heragu, L. Chen, and M. L. Spearman. 2012. “Comparing Dynamic Risk-based Scheduling Methods with MRP via Simulation.” International Journal of Production Research 50 (4): 921–937. doi:10.1080/00207543.2011.556152.
  • Taal, M., and J. C. Wortmann. 1997. “Integrating MRP and Finite Capacity Planning.” Production Planning and Control 8 (3): 245–254.10.1080/095372897235307
  • Weintraub, A. J., A. Zozom, Jr., T. J. Hodgson, and D. Cormier 1997. A Simulation Based Finite Capacity Scheduling System. In Proceedings of the 1997 Winter Simulation Conference, Atlanta, 838–844.
  • Wight, O. W. 1995. The Executive’s Guide to Successful MRP II. Vol. 6. New York: Wiley.
  • Wuttipornpun, T., and P. Yenradee. 2004. “Development of Finite Capacity Material Requirement Planning System for Assembly Operations.” Production Planning and Control 15 (5): 534–549.10.1080/09537280412331270797

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.