910
Views
63
CrossRef citations to date
0
Altmetric
Original Articles

Application of interpretive structural modelling for analysis of factors influencing lean remanufacturing practices

, &
Pages 7439-7452 | Received 22 Sep 2015, Accepted 16 May 2016, Published online: 01 Jun 2016

References

  • Amezquita, T., and B. Bras. 1996. “Lean Remanufacture of an Automobile Clutch.” Proceedings of First International Working Seminar on Reuse, 6. Eindhoven.
  • Andrew-Munot, M., and R. N. Ibrahim. 2013. “Development and Analysis of Mathematical and Simulation Models of Decision-making Tools for Remanufacturing.” Production Planning & Control 24 (12): 1081–1100.
  • Attri, R., S. Grover, N. Dev, and D. Kumar. 2013. “An ISM Approach for Modelling the Enablers in the Implementation of Total Productive Maintenance (TPM).” International Journal of System Assurance Engineering and Management 4 (4): 313–326.10.1007/s13198-012-0088-7
  • Bouzon, M., C. M. T. Rodriguez, and A. A. de Queiroz. 2012. “Cell Layout Application in Product Recovery: A Lean Proposal to Increase Efficiency in Remanufacturing.” Chinese Business Review 11 (5): 467–475.
  • Bras, B. 2012. “Remanufacturing: Design Principles.” Encyclopedia of Supply Chain Management. doi:10.1081/E-ESCM-120048182.
  • Charter, M., and C. Gray. 2007. “Remanufacturing and Product Design.” International Journal of Product Development 6 (3–4): 375–392.
  • Cheah, A. C. H., W. P. Wong, and Q. Deng. 2012. Challenges of Lean Manufacturing Implementation, a Hierarchical Model. Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management. Istanbul.
  • Choudhary, N., and Singh, N. K. 2011. “Remanufacturing in India: Approaches, Potentials & Technical Challenges.” International Journal of Industrial Engineering and Technology 3 (3): 223–227.
  • Daniel, V., R. Guide Jr., and M. S. Spencer. 1997. “Rough-cut Capacity Planning for Remanufacturing Firms.” Production Planning & Control 8 (3): 237–244.
  • DePuy, G. W., J. S. Usher, R. L. Walker, and G. D. Taylor. 2007. “Production Planning for Remanufactured Products.” Production Planning and Control 18 (7): 573–583.10.1080/09537280701542210
  • Global Industry Analysts. 2006. Automotive Remanufacturing: A Global Strategic Business Report. San Jose, CA: Global Industry Analysts, Inc.
  • Govindan, K., K. M. Shankar, and D. Kannan. 2015. “Application of Fuzzy Analytic Network Process for Barrier Evaluation in Automotive Parts Remanufacturing towards Cleaner Production – A Study in an Indian Scenario.” Journal of Cleaner Production 114: 199–213.
  • Grubbström, R. W., and O. Tang. 2006. “Optimal Production Opportunities in a Remanufacturing System.” International Journal of Production Research 44 (18–19): 3953–3966.10.1080/00207540600806406
  • Hammond, R., T. Amezquita, and B. Bras. 1998. “Issues in the Automotive Parts Remanufacturing Industry: A Discussion of Results from Surveys Performed among Remanufacturers.” Engineering Design and Automation 4: 27–46.
  • Johnson, M. R., and M. H. Wang. 1998. “Economical Evaluation of Disassembly Operations for Recycling, Remanufacturing and Reuse.” International Journal of Production Research 36 (12): 3227–3252.10.1080/002075498192049
  • Jose, P. D. 2008. “Getting Serious about Green.” Real CIO World 3: 26–28.
  • Kang, C. M., and Y. S. Hong. 2012. “Dynamic Disassembly Planning for Remanufacturing of Multiple Types of Products.” International Journal of Production Research 50 (22): 6236–6248.10.1080/00207543.2011.616231
  • Kannan, G., S. Pokharel, and P. S. Kumar. 2009. “A Hybrid Approach Using ISM and Fuzzy TOPSIS for the Selection of Reverse Logistics Provider.” Resources, Conservation and Recycling 54 (1): 28–36.10.1016/j.resconrec.2009.06.004
  • Kucner, R. J. 2008. A Socio-technical Study of Lean Manufacturing Deployment in the Remanufacturing Context.  PhD diss.,  Industrial and Operations Engineering, The University of Michigan.
  • Kumar, N., S. Kumar, A. Haleem, and P. Gahlot. 2013. “Implementing Lean Manufacturing System: ISM Approach.” Journal of Industrial Engineering and Management 6 (4): 996–1012.
  • Kurilova-Palisaitiene, J., and E. Sundin. 2014a. “Challenges and Opportunities of Lean Remanufacturing.” International Journal of Automation Technology 8 (5): 644–652.
  • Kurilova-Palisaitiene, J., and E. Sundin. 2014b. “Minimum Time for Material and Information Flows Analysis (Minimifa)-a Method to Identify Challenges and Improvement Opportunities.” The 6th Swedish Production Symposium, Götegorg, Sweden, September 16–18.
  • Kurilova-Palisaitiene, J., and E. Sundin. 2015. “Toward Pull Remanufacturing: A Case Study on Material and Information Flow Uncertainties at a German Engine Remanufacturer.” Procedia CIRP 26: 270–275.10.1016/j.procir.2014.07.187
  • Mathiyazhagan, K., and A. N. Haq. 2013. “Analysis of the Influential Pressures for Green Supply Chain Management Adoption—an Indian Perspective using Interpretive Structural Modeling.” The International Journal of Advanced Manufacturing Technology 68 (1–4): 817–833.
  • Mukherjee, K., and S. Mondal. 2009. “Analysis of Issues Relating to Remanufacturing Technology – A Case of an Indian Company.” Technology Analysis & Strategic Management 21 (5): 639–652.
  • Östlin, J.. 2008. “On Remanufacturing Systems: Analysing and Managing Material Flows and Remanufacturing Processes.” Linköping Studies in Science and Technology, Thesis No. 1192. Production Systems, Department of Management and Engineering, Institute of Technology, Linköpings Universitet. SE-58 183.
  • Östlin, J., and E. Ekholm. 2007. “Lean Production Principles in Remanufacturing a Case Study at a Toner Cartridge Remanufacturer.” Proceedings of the IEEE International Symposium on Electronics & the Environment 2007, 216–221. Orlando, FL: IEEE.
  • Raj, T., R. Shankar, and M. Suhaib. 2008. “An ISM Approach for Modelling the Enablers of Flexible Manufacturing System: The Case for India.” International Journal of Production Research 46 (24): 6883–6912.10.1080/00207540701429926
  • Rubio, S., and A. Corominas. 2008. “Optimal Manufacturing – Remanufacturing Policies in a Lean Production Environment.” Computers & Industrial Engineering 55 (1): 234–242.
  • Shi, W., and K. J. Min. 2015. “Remanufacturing Decisions and Implications under Material Cost Uncertainty.” International Journal of Production Research 53 (21): 6421–6435.
  • Steinhilper, R., and F. Weiland. 2015. “Exploring New Horizons for Remanufacturing an Up-to-date Overview of Industries, Products and Technologies.” Procedia CIRP 29: 769–773.10.1016/j.procir.2015.02.041
  • Subramoniam, R., G. Abusamra, and D. Hostetler. 2009. Lean Engineering Implementation Challenges for Automotive Remanufacturing (No. 2009-01-1188). SAE Technical Paper.  doi:10.4271/2009-01-1188.10.4271/2009-01-1188
  • Sundin, E. 2004. Product and Process Design for Successful Remanufacturing, Linköping Studies in Science and Technology Dissertation No. 906, Production Systems, Department of Mechanical Engineering, Linköpings Universitet, SE-581 83 Linköping, Sweden.
  • Sundin, E. 2006. “How Can Remanufacturing Processes Become Leaner.” CIRP International Conference on Life Cycle Engineering. Vol. 31, 2006. Leuven.
  • Sundin, E., and B. Bras. 2005. “Making Functional Sales Environmentally and Economically Beneficial through Product Remanufacturing.” Journal of Cleaner Production 13 (9): 913–925.10.1016/j.jclepro.2004.04.006
  • Sutherland, J. W., D. P. Adler, K. R. Haapala, and V. Kumar. 2008. “A Comparison of Manufacturing and Remanufacturing Energy Intensities with Application to Diesel Engine Production.” CIRP Annals-Manufacturing Technology 57 (1): 5–8.10.1016/j.cirp.2008.03.004
  • Terkar, R., D. H. Vasudevan, and D. V. Kalamkar. 2013. “Enhancing Productivity through Cost and Lead Time Reduction in Remanufacturing.” International Journal of Mechanical Engineering & Technology 4: 286–297.
  • Thakkar, J., S. G. Deshmukh, A. D. Gupta, and R. Shankar. 2005. “Selection of Third-party Logistics (3PL): a Hybrid Approach Using Interpretive Structural Modeling (ISM) and Analytic Network Process (ANP).” Supply Chain Forum: An International Journal 6 (1): 32–46.
  • Vinodh, S., C. V. Kumar, and K. J. Manjunatheshwara. 2015. “Development of a Methodology to Evaluate Lean Remanufacturing Characteristics in a Manufacturing Organisation.” International Journal of Services and Operations Management 21 (2): 187–199.10.1504/IJSOM.2015.069379
  • Vinodh, S., K. Ramesh, and C. S. Arun. 2016. “Application of Interpretive Structural Modelling for Analysing the Factors Influencing Integrated Lean Sustainable System.” Clean Technologies and Environmental Policy 18 (2): 413–428.10.1007/s10098-015-1025-7

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.