References
- Bartz-Beielstein, Thomas. 2010. “SPOT: An R Package for Automatic and Interactive Tuning of Optimization Algorithms by Sequential Parameter Optimization.” arXiv preprint arXiv:1006.4645.
- Bartz-Beielstein, Thomas. 2014. “Package SPOT. Reference Manual.” http://cran.r-project.org/web/packages/SPOT/index.html. Cited 11 January 2015.
- Bierwirth, Christian, and Frank Meisel. 2009. “A Fast Heuristic for Quay Crane Scheduling with Interference Constraints.” Journal of Scheduling 12 (4): 345–360.
- Bierwirth, Christian, and Frank Meisel. 2010. “A Survey of Berth Allocation and Quay Crane Scheduling Problems in Container Terminals.” European Journal of Operational Research 202 (3): 615–627.
- Bierwirth, Christian, and Frank Meisel. 2015. “A Follow-up Survey of Berth Allocation and Quay Crane Scheduling Problems in Container Terminals.” European Journal of perational Research 244 (3): 675–689.
- Cheng, Xu, Lixin Tang, and Panos M. Pardalos. 2015. “A Branch-and-Cut Algorithm for Factory Crane Scheduling Problem.” Journal of Global Optimization 63 (4): 729–755.
- Chung, S. H., and Felix T. S. Chan. 2013. “A Workload Balancing Genetic Algorithm for the Quay Crane Scheduling Problem.” International Journal of Production Research 51 (16): 4820–4834.
- Chung, Sai Ho , and Choy, King Lun. 2012. “A Modified Genetic Algorithm for Quay Crane Scheduling Operations." Expert Systems with Applications 39: 4123–4221.
- da Silva Neto, Jose Paulo. 2013. “Loading and Scheduling Trucks in a Distribution Center.” Master’s Thesis, Post-Graduate Program in Production Engineering, Federal University of Minas Gerais, Brazil (in portuguese).
- Diabat, Ali, and Effrosyni Theodorou. 2014. “An Integrated Quay Crane Assignment and Scheduling Problem.” Computers & Industrial Engineering 73: 115–123.
- Dohn, Anders, and Jens Clausen. 2010. “Optimising the Slab Yard Planning and Crane Scheduling Problem using a Two-stage Heuristic.” International Journal of Production Research 48 (15): 4585–4608.
- Fu, Yi-Min, Ali Diabat, and I-TsungTsai. 2014. “A Multi-vessel Quay Crane Assignment and Scheduling Problem: Formulation and Heuristic Solution Approach.” Expert Systems with Applications 41 (15): 6959–6965.
- Gen, Mitsuo, Cheng Runwei. 2000. “Genetic Algorithms and Engineering Optimization.” Vol. 7. New York: John Wiley & Sons.
- Guan, Yongpei, Kang-Hung Yang, and Zhili Zhou. 2013. “The Crane Scheduling Problem: Models and Solution Approaches.” Annals of Operations Research 203 (1): 119–139.
- Hirsch, Patrick, Andreas Palfi, and Manfred Gronalt. 2012. “Solving a Time Constrained Two-crane Routing Problem for Material Handling with an Ant Colony Optimisation Approach: An Application in the Roof-Tile Industry.” International Journal of Production Research 50 (20): 6005–6021.
- Kim, Kap Hwan, and Young-Man Park. 2004. “A Crane Scheduling Method for Port Container Terminals.” European Journal of Operational Research 156 (3): 752–768.
- Kung, Yiheng, Yoshimasa Kobayashi, Toshimitsu Higashi, Masao Sugi, and Jun Ota. 2014. “Order Scheduling of Multiple Stacker Cranes on Common Rails in an Automated Storage/Retrieval System.” International Journal of Production Research 52 (4): 1171–1187.
- Lee, Der-Horng, Hui Qiu Wang, and Lixin Miao. 2008. “Quay Crane Scheduling with Non-Interference Constraints in Port Container Terminals.” Transportation Research Part E: Logistics and Transportation Review 44 (1): 124–135.
- Maschietto, G. N. 2015. “Scheduling Problem in a Distribution Center with Two Cranes Subject to Non-interference Constraints." Master’s Thesis, Post-Graduate Program in Production Engineering, Federal University of Minas Gerais, Brazil.
- Maschietto, Gabriela Naves, Yassine Ouazene, Farouk Yalaoui, Maurício Cardoso de Souza, and Martín Gómez Ravetti. 2015. “Two Formulations for Non-Interference Parallel Machine Scheduling Problems.” IFAC-Papers OnLine 48 (3): 272–276.
- Ng, W. C. 2005. “Crane Scheduling in Container Yards with Inter-Crane Interference.” European Journal of Operational Research 164 (1): 64–78.
- Peterson, Ben, Iiro Harjunkoski, Samid Hoda, and John N. Hooker. 2014. “Scheduling Multiple Factory Cranes on a Common Track.” Computers & Operations Research 48: 102–112.
- Song, Liying, Tom Cherrett, and Wei Guan. 2012. “Study on Berth Planning Problem in a Container Seaport: Using an Integrated Programming Approach.” Computers & Industrial Engineering 62 (1): 119–128.
- Tang, Lixin, Xie Xie, and Jiyin Liu. 2014. “Crane Scheduling in a Warehouse Storing Steel Coils.” IIE Transactions 46 (3): 267–282.
- Tavakkoli-Moghaddam, Reza, A. Makui, S. Salahi, M. Bazzazi, and F. Taheri. 2009. “An Efficient Algorithm for Solving a New Mathematical Model for a Quay Crane Scheduling Problem in Container Ports.” Computers & Industrial Engineering 56 (1): 241–248.
- Theodorou, Effrosyni, and Ali Diabat. 2015. “A Joint Quay Crane Assignment and Scheduling Problem: Formulation, Solution Algorithm and Computational Results.” Optimization Letters 9 (4): 799–817.
- Xie, Xie, Yongyue Zheng, and Yanping Li. 2014. “Multi-crane Scheduling in Steel Coil Warehouse.” Expert Systems with Applications 41 (6): 2874–2885.
- Xie, Xie, Yongyue Zheng, and Yanping Li. 2015. “Genetic Algorithm and its Performance Analysis for Scheduling a Single Crane". In Discrete Dynamics in Nature and Society. doi: http://dx.doi.org/10.1155/2015/618436,
- Zäpfel, Günther, and Michael Wasner. 2006. “Warehouse Sequencing in the Steel Supply Chain as a Generalized Job Shop Model.” International Journal of Production Economics 104 (2): 482–501.