187
Views
8
CrossRef citations to date
0
Altmetric
Original Articles

The effect of work content imbalance and its interaction with scheduling method on sequential flow line performance

&
Pages 2791-2805 | Received 03 Nov 2015, Accepted 18 May 2016, Published online: 13 Jun 2016

References

  • Askin, R. G., and C. R. Standridge. 1993. Modeling and Analysis of Manufacturing Systems. Chap. 2. New York: Wiley.
  • Averbakh, I. 2000. “Minmax Regret Solutions for Minimax Optimization Problems with Uncertainty.” Operations Research Letters 27 (2): 57–65.10.1016/S0167-6377(00)00025-0
  • Botta-Genoulaz, V. 2000. “Hybrid Flow Shop Scheduling with Precedence Constraints and Time Lags to Minimize Maximum Lateness.” International Journal of Production Economics 64 (1–3): 101–111.10.1016/S0925-5273(99)00048-1
  • Boysen, N., M. Fliedner, and A. Scholl. 2006. “A Classification of Assembly Line Balancing Problems.” European Journal of Operational Research 183 (2): 674–693.
  • Braun, O., T. C. Lai, G. Schmidt, and Y. N. Sotskov. 2002. “Stability of Johnson’s Schedule with Respect to Limited Machine Availability.” International Journal of Production Research 40 (17): 4381–4400.10.1080/00207540210159527
  • Campbell, H. G., R. A. Dudek, and M. L. Smith. 1970. “A Heuristic Algorithm for the n Job, m Machine Sequencing Problem.” Management Science 16 (10): B-630–B-637.10.1287/mnsc.16.10.B630
  • Chow, V. S., M. L. Puterman, N. Salehirad, W. Huang, and D. Atkins. 2011. “Reducing Surgical Ward Congestion through Improved Surgical Scheduling and Uncapacitated Simulation.” Production and Operations Management 20 (3): 418–430.10.1111/poms.2011.20.issue-3
  • Christensen, H., K. Søgaard, M. Pilegaard, and H. B. Olsen. 2000. “The Importance of the Work/Rest Pattern as a Risk Factor in Repetitive Monotonous Work.” International Journal of Industrial Ergonomics 25 (4): 367–373.10.1016/S0169-8141(99)00025-6
  • Conway, R., W. Maxwell, J. O. McClain, and L. J. Thomas. 1988. “The Role of Work-in-Process Inventory in Serial Production Lines.” Operations Research 36 (2): 229–241.10.1287/opre.36.2.229
  • Framinan, J. M., R. Leisten, and C. Rajendran. 2003. “Different Initial Sequences for the Heuristic of Nawaz, Enscore and Ham to Minimize Makespan, Idletime or Flowtime in the Static Permutation Flowshop Sequencing Problem.” International Journal of Production Research 41 (1): 121–148.10.1080/00207540210161650
  • Hinkle, D. E., W. Wiersma, and S. G. Jurs. 2003. Applied Statistics for the Behavioral Sciences. 5th ed., 109. Boston, MA: Houghton Mifflin.
  • Kasperski, A. 2005. “Minimizing Maximal Regret in the Single Machine Sequencing Problem with Maximum Lateness Criterion.” Operations Research Letters 33 (4): 431–436.10.1016/j.orl.2004.07.004
  • Lai, T. C., and Y. N. Sotskov. 1999. “Sequencing with Uncertain Numerical Data for Makespan Minimisation.” Journal of the Operational Research Society 50 (3): 230–243.10.1057/palgrave.jors.2600690
  • Lebedev, V., and I. Averbakh. 2006. “Complexity of Minimizing the Total Flow Time with Interval Data and Minmax Regret Criterion.” Discrete Applied Mathematics 154 (15): 2167–2177.10.1016/j.dam.2005.04.015
  • Li, W., and T. Freiheit. (2015). An Effective Heuristic for Adaptive Control of Job Sequences Subject to Variation in Processing times. International Journal of Production Research 54 (12): 3491–3507. doi:10.1080/00207543.2015.1073403.
  • Li, W., B. R. Nault, D. Xue, and Y. L. Tu. 2011. “An Efficient Heuristic for Adaptive Production Scheduling and Control in One-of-a-Kind Production.” Computers & Operations Research 38 (1): 267–276.
  • Li, W., V. L. Mitchell, and B. R. Nault. (Jan. 2014). “Inconsistent Objectives in Operating Room Scheduling.” In IIE Annual Conference. Proceedings. 727. Montreal, Quebec: Institute of Industrial Engineers-Publisher.
  • Moodie, C. L., and H. H. Young. 1965. “A Heuristic Method of Assembly Line Balancing for Assumptions of Constant or Variable Work Element times.” Journal of Industrial Engineering 16 (1): 23–29.
  • Nawaz, M., E. E. Enscore, Jr., and I. Ham. 1983. “A Heuristic Algorithm for the m-Machine, n-Job Flow-shop Sequencing Problem.” OMEGA-International Journal of Management Science 11 (1): 91–95.10.1016/0305-0483(83)90088-9
  • Panneerselvam, R. 2005. Production and Operations Management. 2nd ed. New Delhi: PHI Learning.
  • Pinedo, M. L. 2012. Scheduling: Theory, Algorithms, and Systems. New York: Springer.10.1007/978-1-4614-2361-4
  • Ponnambalam, S. G., P. Aravindan, and G. M. Naidu. 1999. “A Comparative Evaluation of Assembly Line Balancing Heuristics.” The International Journal of Advanced Manufacturing Technology 15 (8): 577–586.10.1007/s001700050105
  • Rachamadugu, R., and B. Talbot. 1991. “Improving the Equality of Workload Assignments in Assembly Lines.” International Journal of Production Research 29 (3): 619–633.10.1080/00207549108930092
  • Rajakumar, S., V. P. Arunachalam, and V. Selladurai. 2004. “Workflow Balancing Strategies in Parallel Machine Scheduling.” The International Journal of Advanced Manufacturing Technology 23 (5–6): 366–374.10.1007/s00170-003-1603-4
  • Raman, N., F. B. Talbot, and R. V. Rachamadugu. 1989. “Due Date Based Scheduling in a General Flexible Manufacturing System.” Journal of Operations Management 8 (2): 115–132.10.1016/0272-6963(89)90015-6
  • Ruiz, R., and C. Maroto. 2005. “A Comprehensive Review and Evaluation of Permutation Flowshop Heuristics.” European Journal of Operational Research 165 (2): 479–494.10.1016/j.ejor.2004.04.017
  • Sotskov, Y. N., V. S. Tanaev, and F. Werner. (1998). “Stability Radius of an Optimal Schedule: A Survey and Recent Developments.” Industrial Applications of Combinatorial Optimization, edited by Yu, Gang, 72–108. Vol. 16. Springer.
  • Taillard, E. 1993. “Benchmarks for Basic Scheduling Problems.” European Journal of Operational Research 64 (2): 278–285.10.1016/0377-2217(93)90182-M
  • Yavuz, I. H., and A. Satir. 1995. “A Kanban-based Simulation Study of a Mixed Model Just-in-Time Manufacturing Line.” International Journal of Production Research 33 (4): 1027–1048.10.1080/00207549508930192

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.