550
Views
13
CrossRef citations to date
0
Altmetric
Original Articles

Increasing accuracy and robustness of order promises

&
Pages 656-670 | Received 25 Dec 2015, Accepted 23 May 2016, Published online: 08 Jun 2016

References

  • Altendorfer, K., and S. Minner. 2014. “A Comparison of Make-to-stock and Make-to-order in Multi-product Manufacturing Systems with Variable Due Dates.” IIE Transactions 46 (3): 197–212. doi:10.1080/0740817X.2013.803638.
  • Ball, M. O., C. Y. Chen, and Z. Y. Zhao. 2004. “Available to Promise.” In Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era, edited by D. Simchi-Levi, D. D. Wu, and Z.-J. Shen, 447–483. New York: Springer.10.1007/978-1-4020-7953-5
  • Brahimi, N., T. Aouam, and E.-H. Aghezzaf. 2014. “Integrating Order Acceptance Decisions with Flexible Due Dates in a Production Planning Model with Load-dependent Lead times.” International Journal of Production Research 53 (12): 3810–3822. doi:10.1080/00207543.2014.993045.
  • Buzacott, J. A., and J. G. Shanthikumar. 1994. “Safety Stock Versus Safety Time in MRP Controlled Production Systems.” Management Science 40 (12): 1678–1689. doi:10.1287/mnsc.40.12.1678.
  • Cederborg, O., and M. Rudberg. 2009. “Customer Segmentation and Capable-to-promise in a Capacity Constrained Manufacturing Environment.” In Proceedings of the 16th International Annual EurOMA Conference. Göteborg, June 14–17.
  • Chatterjee, A., M. Cohen, W. Maxwell, and L. Miller. 1984. “Manufacturing Flexibility: Models and Measurements.” In Proceedings of the 1st ORSA/TIMS Special Interest Conference on FMS, 49–64. Amsterdam: Elsevier.
  • Chen, J., and M. Dong. 2014. “Available-to-promise-Based Flexible Order Allocation in ATO Supply Chains.” International Journal of Production Research 52 (22): 6717–6738. doi:10.1080/00207543.2014.911419.
  • Chen, C. Y., Z. Y. Zhao, and M. O. Ball. 2002. “A Model for Batch Advanced Available-to-promise.” Production and Operations Management 11 (4): 424–440. doi:10.1111/j.1937-5956.2002.tb00470.x.
  • Cheng, T. C. E., and M. C. Gupta. 1989. “Survey of Scheduling Research Involving Due Date Determination Decisions.” European Journal of Operational Research 38 (2): 156–166. doi:10.1016/0377-2217(89)90100-8.
  • Dickersbach, J. T. 2009. Supply Chain Management with SAP APO™: Structures, Modelling Approaches and Implementation of SAP SCM™. Berlin: Springer.10.1007/978-3-540-92942-0
  • Fleischmann, B., and S. Geier. 2012. “Global Available-to-promise (Global ATP).” In Advanced Planning in Supply Chains, edited by H. Stadtler, B. Fleischmann, M. Grunow, H. Meyr, and C. Sürie, 195–215. Berlin: Springer.10.1007/978-3-642-24215-1
  • Fleischmann, B., and H. Meyr. 2004. “Customer Orientation in Advanced Planning Systems.” In Supply Chain Management and Reverse Logistics, edited by H. Dyckhoff, R. Lackes, and J. Reese, 297–321. Berlin: Springer.10.1007/978-3-540-24815-6
  • Framinan, J. M., and R. Leisten. 2010. “Available-to-promise (ATP) Systems: A Classification and Framework for Analysis.” International Journal of Production Research 48 (11): 3079–3103. doi:10.1080/00207540902810544.
  • Geier, S. 2014. Demand Fulfillment Bei Assemble-to-Order-Fertigung. Produktion und Logistik [Demand Fulfilment in Assemble-To-Order Production]. Wiesbaden: Springer Fachmedien.10.1007/978-3-658-04879-2
  • Gordon, V., V. Strusevich, and A. Dolgui. 2012. “Scheduling with Due Date Assignment under Special Conditions on Job Processing.” Journal of Scheduling 15 (4): 447–456. doi:10.1007/s10951-011-0240-2.
  • Hariharan, R., and P. Zipkin. 1995. “Customer-order Information, Leadtimes, and Inventories.” Management Science 41 (10): 1599–1607. doi:10.1287/mnsc.41.10.1599.
  • Janiak, A., W. A. Janiak, T. Krysiak, and T. Kwiatkowski. 2015. “A Survey on Scheduling Problems with Due Windows.” European Journal of Operational Research 242 (2): 347–357. doi:10.1016/j.ejor.2014.09.043.
  • Jung, H. 2012. “An Available-to-promise Process Considering Production and Transportation Uncertainties and Multiple Performance Measures.” International Journal of Production Research 50 (7): 1780–1798. doi:10.1080/00207543.2011.561373.
  • Kaminsky, P., and D. Hochbaum. 2004. “Due Date Quotation Models and Algorithms.” In Handbook of Scheduling: Algorithms, Models, and Performance Analysis, edited by J. Y-T. Leung, 20-1–20-22. Boca Raton, FL: CRC Press.
  • Kaminsky, P., and O. Kaya. 2008. “Scheduling and Due-date Quotation in a Make-to-order Supply Chain.” Naval Research Logistics 55 (5): 444–458. doi:10.1002/nav.20297.
  • Kaminsky, P., and O. Kaya. 2009. “Combined Make-to-order/Make-to-stock Supply Chains.” IIE Transactions 41 (2): 103–119. doi:10.1080/07408170801975065.
  • Karrer, C., K. Alicke, and H.-O. Günther. 2012. “A Framework to Engineer Production Control Strategies and Its Application in Electronics Manufacturing.” International Journal of Production Research 50 (22): 6595–6611. doi:10.1080/00207543.2012.658479.
  • Kilger, C., and H. Meyr. 2015. “Demand Fulfilment and ATP.” In Supply Chain Management and Advanced Planning: Concepts, Models, Software, and Case Studies, edited by H. Stadtler, C. Kilger, and H. Meyr, 177–194. Berlin: Springer.
  • Klein, O. 2009. Fehlmengenverteilung Im Demand Fulfillment. Göttingen: Cuvillier.
  • Leachman, R. C. 1993. “Modeling Techniques for Automated Production Planning in the Semiconductor Industry.” In Optimization in Industry, edited by T. A. Ciriani and R. C. Leachman, 1–30. Chichester: Wiley.
  • Meyr, H. 2009. “Customer Segmentation, Allocation Planning and Order Promising in Make-to-stock Production.” In Supply Chain Planning, edited by H. Meyr and H.-O. Günther, 1–28. Berlin: Springer.
  • Mönch, L., J. W. Fowler, and S. J. Mason. 2013. Production Planning and Control for Wafer Fabrication Facilities: Modeling, Analysis, and Systems. New York: Springer.10.1007/978-1-4614-4472-5
  • Moses, S., H. Grant, L. Gruenwald, and S. Pulat. 2004. “Real-time Due-date Promising by Build-to-order Environments.” International Journal of Production Research 42 (20): 4353–4375. doi:10.1080/00207540410001716462.
  • Oracle, and Capgemini. 2013. From Customer Orders through Fulfillment: Challenges and Opportunities in Manufacturing, High-tech and Retail. Accessed October 30, 2015. https://www.capgemini.com/resource-file-access/resource/pdf/from_customer_orders_through_fulfillment_study_english_final_0.pdf.
  • Ouyang, Y. 2014. “Experimental Study on Using Advance Demand Information to Mitigate the Bullwhip Effect via Decentralised Negotiations.” Transportmetrica B: Transport Dynamics 2 (3): 169–187. doi:10.1080/21680566.2014.921428.
  • Ouyang, Y., and C. F. Daganzo. 2006. “Counteracting the Bullwhip Effect with Decentralized Negotiations and Advance Demand Information.” Physica A 363 (1): 14–23. doi:10.1016/j.physa.2006.01.044.
  • Pibernik, R. 2005. “Advanced Available-to-promise: Classification, Selected Methods and Requirements for Operations and Inventory Management.” International Journal of Production Economics 93: 239–252. doi:10.1016/j.ijpe.2004.06.023.
  • Quante, R., H. Meyr, and M. Fleischmann. 2009. “Revenue Management and Demand Fulfillment: Matching Applications, Models, and Software.” OR Spectrum 31 (1): 31–62. doi:10.1007/s00291-008-0125-8.
  • Tsai, K. M., and S. C. Wang. 2009. “Multi-site Available-to-promise Modeling for Assemble-to-order Manufacturing: An Illustration on TFT-LCD Manufacturing.” International Journal of Production Economics 117 (1): 174–184. doi:10.1016/j.ijpe.2008.10.010.
  • Yang, W., and Y. K. R. Fung. 2014. “An Available-to-promise Decision Support System for a Multi-site Make-to-order Production System.” International Journal of Production Research 52 (14): 4253–4266. doi:10.1080/00207543.2013.877612.
  • Zhao, Z., M. O. Ball, and M. Kotake. 2005. “Optimization-based Available-to-promise with Multi-stage Resource Availability.” Annals of Operations Research 135 (1): 65–85. doi:10.1007/s10479-005-6235-7.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.