610
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

A service-oriented simulation integration platform for hierarchical manufacturing planning and control

, &
Pages 7212-7230 | Received 30 Oct 2015, Accepted 29 Jul 2016, Published online: 18 Aug 2016

References

  • Adams, D., and R. McNamara. 2006. Service-oriented Architecture and Best Practices. Accessed March 15, 2015. http://www.omg.org/news/meetings/workshops/soa-bpm-mda-2006/00-T2_Adams.pdf
  • Alvares, A. J., J. L. N. de Souza Jr., E. L. S. Teixeira, and J. C. E. Ferreira. 2008. “A Methodology for Web-based Manufacturing Management and Control.” In 4th IEEE Conference on Automation Science and Engineering, 668–673. Washington, DC: Key Bridge Marriott.
  • Arsanjani, A. 2004. “How to Identify, Specify, and Realize Services for your SOA.” Service-oriented Modeling and Architecture. Accessed March 15, 2015. http://www.ibm.com/developerworks/webservices/library/ws-soa-design1
  • Bieberstein, N., S. Bose, L. Walker, and A. Lynch. 2005. “Impact of Service-oriented Architecture on Enterprise Systems, Organizational Structures, and Individuals.” IBM Systems Journal 44 (4): 691–708.10.1147/sj.444.0691
  • Bozkurt, M., M. Harman, and Y. Hassoun. 2009. “Testing & Verification in Service-oriented Architecture: A Survey.” Software Testing, Verification and Reliability 23 (4): 261–313.
  • Chandy, K. M., and J. Misra. 1979. “Distributed Simulation: A Case Study in Design and Verification of Distributed Programs.” IEEE Transactions on Software Engineering 5 (5): 440–452.10.1109/TSE.1979.230182
  • Cho, H., Y. J. Son, and A. Jones. 2006. “Design and Conceptual Development of Shop Floor Controllers through the Manipulation of Process Plans.” International Journal of Computer Integrated Manufacturing 19 (4): 359–376.10.1080/09511920500312238
  • Dahmann, J. S., F. R. Kuhl, and R. Weatherly. 1998. “Standards for Simulation: As Simple as Possible but Not Simpler the High Level Architecture for Simulation.” SIMULATION-Transactions of the Society for Modeling and Simulation International 71 (6): 378–387.10.1177/003754979807100603
  • Ferrari, B. 2011. “Boeing’s 787 Program and Another Supply Chain Delay.” Bob Ferrari’s Blog on Global Supply Chain Business Process and Technology. Accessed March 15, 2015. http://www.theferrarigroup.com/supply-chain-matters/2011/07/15/boeings-787-program-and-another-supply-chain-delay/
  • Fujimoto, R. M. 1998. “Time Management in the High Level Architecture.” SIMULATION-Transactions of the Society for Modeling and Simulation International 71 (6): 388–400.10.1177/003754979807100604
  • Fujimoto, R. M. 2001. “Parallel and Distributed Simulation Systems.” In Proceedings of the 2001 Winter Simulation Conference, 147–157. Arlington, VA.
  • Gunsalus, J. 2007. “Boeing Delays 787’s First Flight to November–December.” Bloomberg. Accessed March 15, 2015. http://www.bloomberg.com/apps/news?pid=newsarchive&sid=aUs7S1JX0HuI
  • Guo, S. 2012. “Simulation Software as a Service and Service-oriented Simulation Experiment.” PhD diss., Georgia State University.
  • Huang, J., M. C. Tung, K. M. Wang, and M. C. Lee. 2005. “Smart Time Management – The Unified Time Synchronization Interface for the Distributed Simulation.” Computer Standards & Interfaces 27 (2): 149–161.
  • Jacobi, S., C. Hahn, and D. Raber. 2010. “Integration of Multiagent Systems and Service Oriented Architectures in the Steel Industry.” In IEEE/WIC/ACM International Conference on Web Intelligence and Intelligent Agent Technology, Toronto, 479–482.10.1109/WI-IAT.2010.218
  • Karnouskos, S., O. Baecker, L. M. S. de Souza, and P. Spieb. 2007. “Integration of SOA-ready Networked Embedded Devices in Enterprise Systems via a Cross-Layered Web Service Infrastructure.” In IEEE Conference on Emerging Technologies and Factory Automation, Patras, 293–300.
  • Koh, S. C. L., and S. M. Saad. 2002. “Development of a Business Model for Diagnosing Uncertainty in ERP Environments.” International Journal of Production Research 40 (13): 3015–3039.10.1080/00207540210140077
  • Kuhl, F. R., R. Weatherly, and J. Dahmann. 1999. Creating Computer Simulation Systems: An Introduction to the High Level Architecture. New Jersey: Prentice Hall PTR.
  • Lee, S., Y. J. Son, and R. A. Wysk. 2007. “Simulation-based Planning and Control: From Shop Floor to Top Floor.” Journal of Manufacturing Systems 26 (2): 85–98.10.1016/j.jmsy.2007.07.001
  • Lendermann, P., N. Julka, B. P. Gan, D. Chen, L. F. McGinnis, and J. P. McGinnis. 2003. “Distributed Supply Chain Simulation as a Decision Support Tool for the Semiconductor Industry.” SIMULATION: Transactions of the Society for Modeling and Simulation 79 (3): 126–138.10.1177/0037549703255635
  • Lutz, R., R. Scrudder, and J. Graffagnini. 1998. “High Level Architecture Object Model Development and Supporting Tools.” SIMULATION-Transactions of the Society for Modeling and Simulation International 71 (6): 401–409.10.1177/003754979807100605
  • Mendes, J. M., P. Leitão, A. W. Colombo, and F. Restivo. 2012. “High-level Petri Nets for the Process Description and Control in Service-oriented Manufacturing Systems.” International Journal of Production Research 50 (6): 1650–1665.10.1080/00207543.2011.575892
  • Misra, J. 1986. “Distributed Discrete-event Simulation.” Computer Surveys 18 (1): 39–65.
  • Misra, S., J. Venkateswaran, and Y. J. Son. 2003. “Framework for Adaptive Time Synchronization Method for Integration of Distributed, Heterogeneous, Supply Chain Simulations.” In Proceedings of the 2003 American Society of Engineering Management Conference, St Louis, MO.
  • Ollinger¸ L., J. Schlick, and S. Hodek. 2011. Leveraging the Agility of Manufacturing Chains by Combining Process-oriented Production Planning and Service-oriented Manufacturing Automation. In 18th International Federation of Automatic Control (IFAC) World Congress, 5231–5236. Milano.
  • Ostrower, J. 2011. “Boeing Holding 787 Line for a Month, to Update 2011 Delivery Guidance.” Flightglobal Blog. Accessed March 15, 2015. http://www.flightglobal.com/blogs/flightblogger/2011/07/boeing_holding_787_line_for_a/
  • Papazoglou, M. P., and W.-J. van den Heuvel. 2007. “Service Oriented Architectures: Approaches, Technologies and Research Issues.” The VLDB Journal 16: 389–415.10.1007/s00778-007-0044-3
  • Rathore, A., B. Balaraman, X. Zhao, J. Venkateswaran, Y. J. Son, and R. A. Wysk. 2005. “Development and Benchmarking of an Epoch Time Synchronization Method for Distributed Simulation.” Journal of Manufacturing Systems 24 (2): 69–78.10.1016/S0278-6125(05)80008-1
  • Ray, S. 2008. “Boeing Reviews Dreamliner Schedule for More Delays.” Bloomberg. Accessed March 15, 2011. http://www.bloomberg.com/apps/news?pid=newsarchive&sid=aSpIiLLg_Uj8&refer=home
  • Riley, G. F., M. H. Ammar, R. M. Fujimoto, A. Park, K. Perumalla, and D. Xu. 2004. “A Federated Approach to Distributed Network Simulation.” ACM Transactions on Modeling and Computer Simulation 14 (2): 116–148.10.1145/985793
  • Schmidt, M.-T., B. Hutchison, P. Lambros, and R. Phippen. 2005. “The Enterprise Service Bus: Making Service-oriented Architecture Real.” IBM Systems Journal 44 (4): 781–797.10.1147/sj.444.0781
  • Smith, J. S., R. A. Wysk, D. T. Sturrok, S. E. Ramaswamy, G. D. Smith, and S. B. Joshi. 1994. “Discrete Event Simulation for Shop Floor Control.” In Proceedings of the 1994 Winter Simulation Conference, 962–969. Lake Buena Vista, FL.
  • Son, Y. J., S. B. Joshi, R. A. Wysk, and J. S. Smith. 2002. “Simulation-based Shop Floor Control.” Journal of Manufacturing Systems 21 (5): 380–394.10.1016/S0278-6125(02)80036-X
  • Son, Y. J., A. T. Jones, and R. A. Wysk. 2003. “Component Based Simulation Modeling from Neutral Component Libraries.” Computers & Industrial Engineering 45 (1): 141–165.
  • Steele, J., Y. J. Son, and R. A. Wysk. 2001. “Resource Modeling for the Integration of the Manufacturing Enterprise.” Journal of Manufacturing Systems 19 (6): 407–427.10.1016/S0278-6125(01)80012-1
  • Strassburger, S., T. Schulze, and R. M. Fujimoto. 2008. “Future Trends in Distributed Simulation and Distributed Virtual Environments: Results of a Peer Study.” In Proceedings of the 2008 Winter Simulation Conference, 777–785. Miami, FL.10.1109/WSC.2008.4736140
  • Tao, F., Y. Cheng, L. D. Xu, L. Zhang, and B. H. Li. 2014. “CCIoT-CMfg: Cloud Computing and Internet of Things-based Cloud Manufacturing Service System.” IEEE Transactions on Industrial Informatics 10 (2): 1435–1442.
  • Taylor, S. J. E., R. Sudra, T. Janahan, G. Tan, and J. Ladbrook. 2002. “GRIDS-SCF: An Infrastructure for Distributed Supply Chain Simulation.” SIMULATION-Transactions of the Society for Modeling and Simulation International 78 (5): 312–320.10.1177/0037549702078005553
  • Terzi, S., and S. Cavalieri. 2004. “Simulation in the Supply Chain Context: A Survey.” Computers in Industry 53 (1): 3–16.10.1016/S0166-3615(03)00104-0
  • Valilai, O. F., and M. Houshmand. 2013. “A Collaborative and Integrated Platform to Support Distributed Manufacturing System Using a Service-oriented Approach Based on Cloud Computing Paradigm.” Robotics and Computer-Integrated Manufacturing 29 (1): 110–127.10.1016/j.rcim.2012.07.009
  • van der Zee, D. J., and J. van der Vorst. 2005. “A Modeling Framework for Supply Chain Simulation: Opportunities for Improved Decision Making.” Decision Sciences 36 (1): 65–95.10.1111/deci.2005.36.issue-1
  • Venkateswaran, J., and Y. Son. 2004. “Design and Development of a Prototype Distributed Simulation for Evaluation of Supply Chains.” International Journal of Industrial Engineering 11 (2): 151–159.
  • Venkateswaran, J., and Y. J. Son. 2005. “Hybrid System Dynamic–Discrete Event Simulation-based Architecture for Hierarchical Production Planning.” International Journal of Production Research 43 (20): 4397–4429.10.1080/00207540500142472
  • Wysk, R. A., B. A. Peters, and J. S. Smith. 1995. “A Formal Process Planning Schema for Shop Floor Control.” Engineering Design and Automation Journal 1: 3–19.
  • Xu, D. 2014. “An Integrated Simulation, Learning and Game-theoretic Framework for Supply Chain Competition.” PhD diss., Department of Systems and Industrial Engineering, University of Arizona.
  • Xu, D., and Y. J. Son. 2014. “Production Planning and Control via Service-oriented Simulation Integration Platform.” In Proceedings of the 2014 Industrial & Systems Engineering Research Conference, Montreal, 351–360.
  • Xu, D., S. S. Nageshwaraniyer, Y. J. Son, and S. Song. 2011. “Simulation-based Assessment of Change Propagation Effect in an Aircraft Design Process.” In Proceedings of the 2011 Winter Simulation Conference, Phoenix, AZ, 1715–1726.
  • Accessed February 10, 2012. http://en.wikipedia.org/wiki/High_Level_Architecture_(simulation)
  • Accessed March 15, 2015. http://en.wikipedia.org/wiki/Web_service
  • Zhang, Y., X. Xu, Y. Liu, and X. Bai. 2012. “Service-oriented, Cross-platform and High-level Machining Simulation.” International Journal of Computer Integrated Manufacturing 25 (3): 280–295.10.1080/0951192X.2011.637961
  • Zhong, R. Y., Z. Li, L. Y. Pang, Y. Pan, T. Qu, and G. Q. Huang. 2013. “RFID-enabled Real-time Advanced Planning and Scheduling Shell for Production Decision Making.” International Journal of Computer Integrated Manufacturing 26 (7): 649–662.10.1080/0951192X.2012.749532

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.