345
Views
12
CrossRef citations to date
0
Altmetric
Original Articles

From loop structure to policy-making: a CONWIP design framework for hybrid flow shop control in one-of-a-kind production environment

, , , &
Pages 3374-3391 | Received 30 Sep 2015, Accepted 05 Sep 2016, Published online: 26 Sep 2016

References

  • Alpay, S., and N. Yüzügüllü. 2009. “Dynamic Job Shop Scheduling for Missed Due Date Performance.” International Journal of Production Research 47 (15): 4047–4062.10.1080/00207540802043980
  • Azizoğlu, M., E. Çakmak, and S. Kondakci. 2001. “A Flexible Flowshop Problem with Total Flow Time Minimization.” European Journal of Operational Research 132 (3): 528–538.10.1016/S0377-2217(00)00142-9
  • Cheng, T. C. E., and J. Jiang. 1998. “Job Shop Scheduling for Missed Due-date Performance.” Computers & Industrial Engineering 34 (2): 297–307.10.1016/S0360-8352(97)00317-3
  • Choi, H., and D. Lee. 2009. “Scheduling Algorithms to Minimize the Number of Tardy Jobs in Two-stage Hybrid Flow Shops.” Computers & Industrial Engineering 56 (1): 113–120.10.1016/j.cie.2008.04.005
  • Davis, S. 2005. Topology. International ed. New York: McGraw Hill Higher Education.
  • Dean, P. R., Y. L. Tu, and D. Xue. 2009. “An Information System for One-of-a-kind Production.” International Journal of Production Research 47: 1071–1087.10.1080/00207540701543593
  • Desprez, C., F. Chu, and C. Chu. 2009. “Minimising the Weighted Number of Tardy Jobs in a Hybrid Flow Shop with Genetic Algorithm.” International Journal of Computer Integrated Manufacturing 22 (8): 745–757.10.1080/09511920902810938
  • Ebrahimi, M., S. M. T. F. Ghomi, and B. Karimi. 2014. “Hybrid Flow Shop Scheduling with Sequence Dependent Family Setup Time and Uncertain Due Dates.” Applied Mathematical Modelling 38 (9–10): 2490–2504.10.1016/j.apm.2013.10.061
  • Eilon, S., and I. G. Chowdhury. 1976. “Due Dates in Job Shop Scheduling.” International Journal of Production Research 14 (2): 223–237.10.1080/00207547608956596
  • Eilon, S., and R. M. Hodgson. 1967. “Job Shops Scheduling with Due Dates.” International Journal of Production Research 6 (1): 1–13.10.1080/00207546708929764
  • Framinan, J. M., and R. Ruiz-Usano. 2002. “On Transforming Job-shops into Flow-shops.” Production Planning & Control 13 (2): 166–174.10.1080/09537280110069748
  • Framinan, J. M., R. Ruiz-Usano, and R. Leisten. 2000. “Input Control and Dispatching Rules in a Dynamic CONWIP Flow-shop.” International Journal of Production Research 38 (18): 4589–4598.10.1080/00207540050205523
  • Framinan, J. M., P. L. González, and R. Ruiz-Usano. 2003. “The CONWIP Production Control System: Review and Research Issues.” Production Planning & Control 14 (3): 255–265.10.1080/0953728031000102595
  • Gee, E. S., and C. H. Smith. 1993. “Selecting Allowance Policies for Improved Job Shop Performance.” International Journal of Production Research 31 (8): 1839–1852.10.1080/00207549308956826
  • Golany, B., E. M. Dar-El, and N. Zeev. 1999. “Controlling Shop Floor Operations in a Multi-family, Multi-cell Manufacturing Environment through Constant Work-in-process.” IIE Transactions 31 (8): 771–781.
  • Gong, Q., Y. Yang, and S. Wang. 2014. “Information and Decision-making Delays in MRP, KANBAN, and CONWIP.” International Journal of Production Economics 156: 208–213.10.1016/j.ijpe.2014.06.010
  • Guinet, A., and M. Legrand. 1998. “Reduction of Job-shop Problems to Flow-shop Problems with Precedence Constraints.” European Journal of Operational Research 109 (1): 96–110.10.1016/S0377-2217(97)00129-X
  • Gupta, J. N. D., K. Krüger, V. Lauff, F. Werner, and Y. N. Sotskov. 2002. “Heuristics for Hybrid Flow Shops with Controllable Processing times and Assignable Due Dates.” Computers & Operations Research 29 (10): 1417–1439.10.1016/S0305-0548(01)00040-5
  • Harrod, S., and J. J. Kanet. 2013. “Applying Work Flow Control in Make-to-order Job Shops.” International Journal of Production Economics 143 (2): 620–626.10.1016/j.ijpe.2012.02.017
  • Holloway, C. A., and R. T. Nelson. 1974. “Job Shop Scheduling with Due Dates and Variable Processing times.” Management Science 20 (9): 1264–1275.10.1287/mnsc.20.9.1264
  • Huang, G., J. Chen, X. Wang, and Y. Shi. 2015. “A Simulation Study of CONWIP Assembly with Multi-loop in Mass Production, Multi-products and Low Volume and OKP Environments.” International Journal of Production Research 53 (14): 4160–4175.10.1080/00207543.2014.980458
  • Huang, G., J. Chen, X. Wang, and Y. Shi. 2016. “An Approach of Designing CONWIP Loop for Assembly System in One-of-a-kind Production Environment.” International Journal of Computer Integrated Manufacturing 29 (7): 805–820.10.1080/0951192X.2015.1130241
  • Kagermann, H., W. Wahlster, and J. Helbig. 2013. Recommendations for Implementing the Strategic Initiative Industrie 4.0. acatech, Frankfurt, 13–78.
  • Khojasteh-Ghamari, Y. 2009. “A Performance Comparison between Kanban and CONWIP Controlled Assembly Systems.” Journal of Intelligent Manufacturing 20 (6): 751–760.
  • Kyparisis, G. J., and C. Koulamas. 2001. “A Note on Weighted Completion Time Minimization in a Flexible Flow Shop.” Operations Research Letters 29 (1): 5–11.10.1016/S0167-6377(01)00072-4
  • Lee, G. 2009. “Estimating Order Lead times in Hybrid Flowshops with Different Scheduling Rules.” Computers & Industrial Engineering 56 (4): 1668–1674.10.1016/j.cie.2008.10.016
  • Li, J. 2010. “Simulation Study of Coordinating Layout Change and Quality Improvement for Adapting Job Shop Manufacturing to CONWIP Control.” International Journal of Production Research 48 (3): 879–900.10.1080/00207540802478814
  • Luo, X., W. Li, Y. Tu, D. Xue, and J. Tang. 2010. “Optimal Resource Allocation for Hybrid Flow Shop in One-of-a-kind Production.” International Journal of Computer Integrated Manufacturing 23 (2): 146–154.10.1080/09511920903440339
  • Mehrsai, A., H. Karimi, and B. Scholz-Reiter. 2013. “Toward Learning Autonomous Pallets by using Fuzzy Rules, Applied in a CONWIP System.” The International Journal of Advanced Manufacturing Technology 64 (5–8): 1131–1150. doi: 10.1007/s00170-012-4057-8.
  • Mousavi, S. M., M. Zandieh, and M. Amiri. 2011. “An Efficient Bi-objective Heuristic for Scheduling of Hybrid Flow Shops.” The International Journal of Advanced Manufacturing Technology 54 (1–4): 287–307.10.1007/s00170-010-2930-x
  • Pettersen, J., and A. Segerstedt. 2009. “Restricted Work-in-process: A Study of Differences between Kanban and CONWIP.” International Journal of Production Economics 118 (1): 199–207.10.1016/j.ijpe.2008.08.043
  • Prakash, J., and J. F. Chin. 2015. “Modified CONWIP Systems: A Review and Classification.” Production Planning & Control 26 (4): 296–307.
  • Ryan, S. M., and F. F. Choobineh. 2003. “Total WIP and WIP Mix for a CONWIP Controlled Job Shop.” IIE Transactions 35 (5): 405–418.10.1080/07408170304387
  • Ryan, S. M., B. Baynat, and F. F. Choobineh. 2000. “Determining Inventory Levels in a CONWIP Controlled Job Shop.” IIE Transactions 32 (2): 105–114.
  • Slomp, J., J. A. C. Bokhorst, and R. Germs. 2009. “A Lean Production Control System for High-variety/Low-volume Environments: A Case Study Implementation.” Production Planning & Control 20 (7): 586–595.10.1080/09537280903086164
  • Spearman, M. L., D. L. Woodruff, and W. J. Hopp. 1990. “CONWIP: A Pull Alternative to Kanban.” International Journal of Production Research 28 (5): 879–894.10.1080/00207549008942761
  • Tang, L., W. Liu, and J. Liu. 2005. “A Neural Network Model and Algorithm for the Hybrid Flow Shop Scheduling Problem in a Dynamic Environment.” Journal of Intelligent Manufacturing 16 (3): 361–370.10.1007/s10845-005-7029-0
  • Tu, Y., and P. Dean. 2011. One-of-a-kind Production. London: Springer.10.1007/978-1-84996-531-6
  • Vinod, V., and R. Sridharan. 2011. “Simulation Modeling and Analysis of Due-date Assignment Methods and Scheduling Decision Rules in a Dynamic Job Shop Production System.” International Journal of Production Economics 129 (1): 127–146.10.1016/j.ijpe.2010.08.017
  • Weeks, J. K. 1979. “A Simulation Study of Predictable Due-dates.” Management Science 25 (4): 363–373.10.1287/mnsc.25.4.363
  • Weng, W., X. Wei, and S. Fujimura. 2012. “Dynamic Routing Strategies for JIT Production in Hybrid Flow Shops.” Computers & Operations Research 39 (12): 3316–3324.10.1016/j.cor.2012.04.022

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.